Home » Information Center » Publications
Publications that cannot be downloaded may be requested. This list extends back to 1990; a list of earlier reports may be requested, as may copies of earlier reports. For any request, please call us at 857.702.3700.
Corridor and Subarea Studies
- Safety and Operations Analyses at Selected Intersections - FFY 2016
- 2016 Priority Corridors for the Long-Range Transportation Plan Needs Assessment
- Route 20 East Corridor Study in Marlborough
- 2015 Priority Corridors for the Long-Range Transportation Plan Needs Assessment
- Summer Street/George Washington Boulevard Subregional Priority Roadway Study in Hingham and Hull
- Low-Cost Improvements to Express-Highway Bottleneck Locations
- 2014 Priority Corridors for the Long-Range Transportation Plan Needs Assessment
- Safety and Operations Analyses at Selected Intersections - FFY 2014
- Washington Street Subregional Priority Roadway Study in Newton
- Safety and Operations Analyses at Selected Intersections - FFY 2013
- Routes 127A/127 Subregional Priority Roadway Study in Gloucester and Rockport
- Route 3A Subregional Priority Roadway Study in Cohasset and Scituate
- A Preferential Lane on I-93 North: A Conceptual Plan
- 2013 Priority Corridors for the Long-Range Transportation Plan Needs Assessment
- 2012 Priority Corridors for the Long-Range Transportation Plan Needs Assessment
- FFY 2012 Safety and Operations Analyses at Selected Intersections
- Low-Cost Improvements to Bottleneck Locations, Phase II
- FFY 2011 Safety and Operations Analyses at Selected Intersections
- Improving the Southeast Expressway: A Conceptual Plan
- Safety and Operations Analyses at Selected Intersections
- Low-Cost Improvements to Bottleneck Locations
- Route 126 Corridor: Transportation Improvement Study
- Operational Improvements at Selected Congested and High-Crash Intersections
- Belmont, Lexington, Waltham Subarea Study
- Alewife Studies, Phase II
- Newton Corner Rotary Study, Phase II
- Toward a Route 28 Corridor Transportation Plan
- Safety and Operational Improvements for the I-93/Route 24 Interchange
- Safety and Operational Improvements at Selected Intersections
- The Mid–North Shore Subregional Transportation Study
- I-90 Interchange 17 (Newton Corner)
- Transportation Improvement Study for Major Roadways in Downtown Salem
- The 2004 Congestion Management System Report
- I-93 / Southeast Expressway / Route 3 (Braintree Split)
- Route 60 Mobility Study: Malden and Medford, Massachusetts (September 2009)
- South Shore Coalition (October 2005)
- MAGIC Phase II (May 2004)
- I-95 Kendrick Street Intersection (December 2003)
- Route 53 Corridor Transportation Plan (November 2003)
- On-Street and Off-Street Parking Inventory for the Boston Metropolitan Core: 1997-98 (October 2003)
- Route 128 Report (June 2003)
- Route 109 Corridor Planning Study (March 2003)
- Route 2 Improvements from Route 111 in Acton to Baker Avenue in Concord (February 2003)
- Traffic Congestion in the SouthWest Advisory Planning Subregion (October 2002)
- MAGIC Subregional Area Study Phase I Report: Current Conditions and Proposed Additional Studies (February 2002)
- Route 138 Corridor Study (July 2001)
- MetroWest Subregional Area Study (February 2001)
- Lower North Shore Transportation Improvement Study (October 2000)
- SWAP CMS Field Reconnaissance and Monitoring on Arterials (July 1999)
- The University Avenue/I-95/I-93 Regional Traffic Study (July 1999)
- Route 20 Transportation Planning Study (May 1998)
- Route 1 South Corridor Planning Study (September 1996)
- Route 2 Long-Range Feasibility Study in Acton, Concord and Lincoln (August 1996)
- Speeds and Travel Times on Limited-Access Highways in the Boston Metropolitan Region: 1994–1995 (April 1996)
- Route 9 in Brookline and Newton: Traffic Operations Analysis (March 1996)
- Preliminary Evaluation of Long-Term Improvements: Route 3/Route 139 Interchange in Pembroke and Marshfield (October 1995)
- Mystic Avenue/Route 28/I-93 Interchange Improvement Study: Somerville, Massachusetts (April 1994)
- Truck Trip Generation Rates by Land Use in the Central Artery/Tunnel Project Study Area (September 1993)
- Warehouse Club Trip Generation Study (June 1993)
- MIT Lincoln Laboratory Employee Relocation: Traffic Impact Study (April 1992); Appendix (April 1992)
- Route 20 Corridor Planning Study: Long-Range Element (August 1991)
- Route 3 and Route 3A (Cambridge Street) Corridor Study in Burlington, Woburn and Winchester
Transit
- The Implications of Changing Demographics on Major Service Changes, 1980–2010
- Identifying Opportunities to Alleviate Bus Delay
- Exploring the 2011 Massachusetts Travel Survey: Barriers and Opportunities Influencing Mode Shift
- 2014 MPO Title VI Report
- SWAP Regional Public Transit Feasibility Study
- MBTA Commuter Rail Passenger Count Results
- Massachusetts Regional Bus Study
- 2011 MPO Title VI Report
- 2011 MBTA Title VI Report
- 2008–09 MBTA Systemwide Passenger Survey Reports
- Greenbush Commuter Rail Before-and-After Study
- MBTA Program for Mass Transportation
- Evaluation of MetroWest Regional Transit Authority Fixed-Route Network
- Assessment of Dudley South Corridor Bus Service and Potential Improvements
- MBTA Transit Signal Priority Study: Arborway Corridor
- Impact Analysis of a Potential MBTA Fare Increase and Restructuring in 2007
- Impact Analysis of the 2007 MBTA Fare Increase and Restructuring
- North Suburban Commuter-Oriented Transit Opportunities: Phase II
- 2008 MBTA Title VI Report
- 2006 MPO Title VI Report
- Regionwide Suburban Transit Opportunities Study: Phase III
- Regionwide Suburban Transit Opportunities Study: Phase II
- Suburban Transit Opportunities
- I-495 Transit Study
- 2005 Fare Mix Study (September 2006)
- 2005 MBTA Title VI Report (May 2005)
- 2003 Program for Mass Transportation (May 2003, revised January 2004)
- North Suburban Transit Opportunities (October 2002)
- MBTA Reverse Commuting Study (May 2001)
- I-290 Northborough Commuter Rail Extension Feasibility Study (April 2002)
- MBTA Bus Route 66 Arterial Improvement Study (January 2002)
- MBTA Water Transportation Service: 2000 Passenger Survey (March 2001)
- MBTA Old Colony Commuter Rail Service Restoration Transportation Impact Study (January 2001)
- 1998 Passenger Survey (January 2001)
- 1997 Passenger Counts: MBTA Rapid Transit and Green Line Central Subway (April 1999)
- Suburban Public Transportation (August 1998)
- Millis Commuter Rail Extension Feasibility Study (March 1998)
- MBTA Systemwide Passenger Survey: Red Line (September 1997)
- MBTA Systemwide Passenger Survey: Bus System 1995 (November 1997)
- 1996 Fare-Mix Study (July 1997)
- Bourne Commuter Rail Feasibility Study, (March 1997)
- MBTA Systemwide Passenger Survey: Green Line (January 1997)
- Central Mass. Rail Feasibility Study (December 1996)
- MBTA Systemwide Passenger Survey: Rapid Transit/Light Rail 1994: Orange Line (August 1996)
- MBTA Systemwide Passenger Survey: Rapid Transit/Light Rail 1994: Blue Line (May 1996)
- 1995 MBTA Passenger Counts: Surface Green Line (December 1995)
- 1993 Survey of Commuter Boat Riders: Northbound Hingham-to-Boston Service (October 1994)
- 1992 Fare-Mix Study: MBTA Rapid Transit, Surface Green Line, Bus, and Commuter Rail Service: Ridership and Average Fares (August 1994)
- Commuting in a New Century: Executive Summary and Supplemental Information for the New Program for Mass Transportation (produced for the Executive Office of Transportation and Construction (June 1994)
- Commuting in a New Century: The New Program for Mass Transportation (produced for the Executive Office of Transportation and Construction; March 1994); Appendices (March 1994)
- 1992 Commuter Rail Survey: Summary of Results (December 1992)
- 1989 MBTA Fare-Mix Study: Rapid Transit, Surface Green Line, and Bus Service: Ridership and Average Fares (April 1992)
- Analysis of Winter 1989-90 Bus Service Changes: Routes 8, 47, 61, 63, 64, 66, 70, and 86 (August 1991)
- 1989 Passenger Counts: MBTA Rapid Transit and Commuter Rail (August 1991); Appendix: Data Collection and Processing Procedures at Downtown Transfer Stations (August 1991)
- Survey of Water Shuttle Customers, May 19 and May 23, 1990: Charlestown Navy Yard/Pier 4-Boston/Long Wharf Service (March 1991); Executive Summary (December 1990)
- MBTA Revenue and Service Environmental Impact Report: 1989 Fare Increase (November 1990)
- Survey of Commuter Boat Customers, April 19, 1990: Hingham-to-Boston Service (October 1990); Executive Summary (August 1990)
- South Corridor Bus Service Study (June 1990); Technical Supplement 1 (June 1990); Technical Supplement 2 (June 1990)
- West Corridor Bus Service Study (April 1990); Supplement 1 (April 1990); Supplement 2 (April 1990)
Bicycle / Pedestrian
- Fairmount Line Station Access Analysis
- Pedestrian Report Card Assessment
- Pedestrian Signal Phasing Study
- Safe Access to Transit for Pedestrians and Bicyclists
- Bicycle and Pedestrian Improvements in Six Urban Centers
- Pedestrian and Bicycle Improvements in Town Centers
- Regional Bicycle Plan
- Improving Pedestrian and Bicyclist Access to Selected Transit Stations
- Freeman Path Extension
- Assabet River Rail Trail Feasibility Study (January 1997)
- Central Mass. Rail Trail Feasibility Study (April 1997)
- MetroWest Bicycle-Pedestrian Study (July 1996)
- Minuteman–Charles River Bikeway Connector Feasibility Study (March 1996)
- Bike to the Sea Feasibility Study (March 1996)
Freight Studies
- Trucks in the South Boston Waterfront
- Rest Locations for Long-Distance Truck Drivers in Massachusetts
- Improving Truck Travel in the Everett-Chelsea Industrial Area
- Proposed Freight Planning Action Plan
- Results of the Boston Region MPO´s 2010 Freight Study – A Profile of Truck Impacts
- Boston Region Freight Study
- Regional Truck Study (September 2001)
Other Studies
- Core Capacity Constraints
- Exploring the 2011 Massachusetts Travel Survey: MPO Travel Profiles
- Greenhouse Gas Reduction Strategy Alternatives: Cost-Effectiveness Analysis
- Exploring the 2011 Massachusetts Travel Survey: Focus on Journeys to Work
- FFY 2013 Community Transportation Technical Assistance Program
- Roundabout Tool
- Screening Regional Express Highways for Possible Preferential Lane Implementation
- FFY 2012 Community Transportation Technical Assistance Program
- AACT brochure
- Speeds and Travel Times on Limited-Access Highways in the Boston Metropolitan Region: 2004-2007
- Be Informed, Be Involved
- Infórmese, Involúcrese
- Carbon Dioxide, Climate Change and the Boston Region MPO
- Carbon Dioxide, Climate Change and the Boston Region MPO: 2012 Update
- Mobility in the Boston Region: The 2000 Congestion Management System Report: Existing Conditions and Next Steps (May 2001)
- Transportation and Air Quality Planning (February 2005)
- Massachusetts Transportation Facts 2001 (July 2001)
- The Demographics of Commuting in Greater Boston (August 1998)
- Congestion Management System Annual Report for 1997: Mobility in the Boston Region (December 1997)
- First Annual Report of the Congestion Management System (October 1996)
- 1995 Massachusetts Transportation Facts (1995)
- An Evaluation of Phase III of the SmarTraveler Advanced Travel Information System (August 1995)
- Extension of the Northeast Corridor via Logan Airport: An Evaluation (July 1994)
- Transportation Facts: Massachusetts (May 1994)
- Commuting Patterns of Route 128 West Area Employees and Alternatives to Reduce Congestion (June 1990)