Boston Region Metropolitan Planning Organization

 

 

2012 TITLE VI ANNUAL UPDATE

to the

MASSACHUSETTS DEPARTMENT OF TRANSPORTATION

 

 

 

JANUARY 17, 2013


Introduction

Title VI of the Civil Rights Act of 1964 prohibits discrimination on the basis of race, color, or national origin in programs and activities receiving federal financial assistance. Two Executive Orders and related statutes further define populations that are protected under the umbrella of Title VI. Executive Order 12898 is concerned with environmental justice for minority and low-income populations.

Executive Order 13166 is concerned with providing equal access to services and benefits for those individuals with limited English proficiency (LEP).

The Boston Region MPO submitted a comprehensive triennial Title VI report to MassDOT in April 2011 and a revision of that report in June 2011. This report is an annual update and follows MassDOT’s Annual Title VI Report Template of April 2011. Only the policies and activities that have changed since the January 2012 annual update are discussed. If there are no changes to present in a report section, that fact is noted.

Section 1: Process Used to Select MPO and Regional Transportation Advisory Council Members

No changes to member selection processes. The Regional Transportation Advisory Council (Advisory Council) is an independent group charged with providing public input on transportation planning to the MPO. It is composed of citizen, professional, and transportation-advocacy groups, neighboring MPOs, and agencies. The Advisory Council provides a forum for broad-based discussions of transportation issues and is a major avenue for public participation in the MPO’s planning process. As a voting member of the MPO, the Advisory Council brings the perspectives of the public to the MPO for consideration as plans and programs are developed. Individuals are welcome to participate in all meetings of the Advisory Council, but membership is limited to public and private organizations and governmental units, including state agencies and municipalities. Entities are admitted to membership by vote of the existing members. A summary of an Advisory Council self-identification survey is provided as Appendix 1. The MPO is conducting outreach to make the membership more diverse.


Section 2: General Reporting Requirements [FTA C 4702.1A IV]

A. Title VI Coordinator

Alicia Wilson, Transportation Equity Manager

 

B. Annual Title VI Certification and Assurance [FTA C 4702.1A IV.1]

The MPO’s signed Title VI assurances are provided beginning on page 5. (Note that these documents were provided by the Federal Transit Administration (FTA) and MassDOT and are not in accessible formats. If you require assistance with these documents, please contact the MPO staff at 617.973.7100 (voice), 617.973.7089 (TTY), 617.973.8855 (fax), or publicinformation@ctps.org.)

C. Notification of Protection under Title VI [FTA C 4702.1A IV.5 and FTA C 4702.1A IV.7.a.5]

The MPO has developed the following notice to the public of protection under Title VI:

The Boston Region Metropolitan Planning Organization (MPO) fully complies with Title VI of the Civil Rights Act of 1964 and related statutes and regulations in all programs and activities. The MPO does not discriminate on the basis of race, color, national origin, English proficiency, income, religious creed, ancestry, disability, age, gender, sexual orientation, gender identity or expression, or military service. Any person who believes herself/himself or any specific class of persons to have been subjected to discrimination prohibited by Title VI or related statutes or regulations may, herself/himself or via a representative, file a written complaint with the MPO. A complaint must be filed no later than 180 calendar days after the date on which the person believes the discrimination occurred. A complaint form and additional information can be obtained by contacting the MPO (see below) or at www.bostonmpo.org.

The meeting locations are accessible to people with disabilities and are near public transportation. Upon request (preferably two weeks in advance of the meeting), every effort will be made to provide accommodations such as assistive listening devices, materials in accessible formats and in languages other than English, and interpreters in American Sign Language and other languages. Please contact the MPO staff at


617.973.7100 (voice), 617.973.7089 (TTY), 617.973.8855 (fax), or

publicinformation@ctps.org.

This statement is posted on the MPO’s website along with the procedures for filing a complaint and the MPO’s complaint form; all of these items are posted in both English and Spanish. Also, all public-outreach materials include the relevant portions of the statement above.

 

D. Complaint Procedures [FTA C 4702.1A IV.2 and FTA C 4702.1A IV.7.a.3]

No changes.

The MPO has not received any Title VI complaints or been the subject of any Title VI lawsuits, and it has not initiated any investigations.

E. Meaningful Access for LEP Persons and Language Implementation Plan [FTA C 4702.1A IV.4]

No major changes. The MPO’s revised website, which will go live shortly, incorporates Google Translates for those who wish to read documents in a language other than English. The MPO has developed maps showing the locations of populations with LEP and populations who speak a language other than English at home (these maps are included in the demographic profiles that will be forwarded when finalized).

F. Special Studies of Traditionally Under-Served or Low-Income Populations

No changes.

 

G. Title VI Investigations, Complaints, and Lawsuits [FTA C 4702.1A IV.3 and FTA C 4702.1A IV.7.a.4]

The MPO has not received any Title VI complaints.

 

H. MPO Funding Sources

Appendix 2 summarizes the projects in the 2013–16 Transportation Improvement Program (TIP) that have highway funding and indicates their specific funding sources. In addition, it shows their locations on a map that also shows the environmental justice transportation analysis zones in the MPO region.

I. Enhancement Projects Applications

The MPO has no enhancement projects.

 

 

 

TITLE VI/NONDISCRIMINATION AGREEMENT AND RECIPIENT ASSURANCES

The State of Massachusetts, acting through its Department of Transportation (hereinafter referred to as the “Recipient”), HEREBY AGREES THAT, as a condition to receiving any Federal financial assistance from the United States Department of Transportation (USDOT), Federal Highway Administration, it is subject to and must comply with the following:

 

Statutory/Regulatory Authorities

 

 

The preceding statutory cites are hereinafter referred to as the “Acts.” The preceding regulatory cites are hereinafter referred to as the “Regulations.”

 

Although not applicable to Recipients directly, there are certain Executive Orders and relevant guidance that direct action by Federal agencies regarding their federally assisted programs and activities to which compliance is required by Recipients to ensure Federal agencies carry out their responsibilities. Executive Order 12898, 3 C.F.R. 859 (1995), entitled “Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations”, emphasizes that Federal agencies should utilize existing laws to achieve Environmental Justice, in particular Title VI, to ensure nondiscrimination against minority populations. Recipients should be aware that certain Title VI matters raise Environmental Justice concerns and FHWA intends that all Recipients evaluate and revise existing procedures (as appropriate) to address and implement Environmental Justice considerations. See the following FHWA website for more information and facts about Environmental Justice:

 

http://www.fhwa.dot.gov/environment/ejustice/facts/index.htm.

 

Additionally, Executive Order 13166, 3 C.F.R. 289 (2001) on Limited-English-Proficiency, according to the U.S. Department of Justice in its Policy Guidance Document dated August 16, 2000 (65 Fed. Reg. at 50123), clarifies the responsibilities associated with the “application of Title VI’s prohibition on national origin discrimination when information is provided only in English to persons with limited English proficiency.” When receiving Federal funds Recipients are expected to conduct a four-factor analysis to prevent discrimination based on National Origin. (See also U.S. DOT’s “Policy Guidance Concerning Recipients’ Responsibilities to Limited English Proficient (LEP) Persons,” dated December 14, 2005, (70 Fed. Reg. at 74087 to 74100); the Guidance is a useful resource when performing a Four-Factor Analysis).

 

General Assurances

In accordance with the Acts, the Regulations, and other pertinent directives, policy, memoranda, and/or guidance, Recipient hereby gives assurance that it will promptly take any measures necessary to ensure that

 

“No person in the United States shall, on the grounds of race, color, national origin, sex, age, or disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity,” for which the Recipient receives Federal financial assistance from the USDOT, including the Federal Highway Administration.

 

The Civil Rights Restoration Act of 1987 clarified the original intent of Congress, with respect to Title VI and other Nondiscrimination requirements (The Age Discrimination Act of 1975, and Section 504 of the Rehabilitation Act of 1973) by restoring the broad, institution wide scope, and coverage of these nondiscrimination statutes and requirements to include all programs and activities of the Recipient, so long as any portion of the program is federally-assisted.

 

Additionally, the Recipient may not discriminate in the selection and retention of contractors, including without limitation, retaining contractors whose services are for, or incidental to, construction, planning, research, highway safety, engineering, property management, realty, fee contracts, and other commitments with persons for services and expenses incidental to the acquisition of rights-of-way.

 

Federal-aid contractors may not discriminate in their selection and retention of first-tier subcontractors and first-tier subcontractors may not discriminate in their selection and retention of second-tier subcontractors, who participate in Federal-aid highway construction, acquisition of rights-of-way, and related projects, including those who supply materials and lease equipment.

 

The Recipient may not discriminate against eligible persons in making relocation payments and in providing relocation advisory assistance where highway rights-of-way acquisitions necessitate relocation(s).

 

The Recipient may not discriminate by preventing Title VI/Nondiscrimination populations from accessing and utilizing facilities and services provided for public accommodations (i.e., eating, sleeping, rest, recreation, and vehicle servicing) constructed on, over, or under the rights-of-way of federally assisted highways.

 

The Recipient, its sub-recipients, contractors, subcontractors, and other persons subject to this Agreement may not discriminate in their employment practices in connection with highway construction projects or other projects assisted by the Federal Highway Administration.

 

The Recipient shall develop and implement a Public Participation Plan in a manner that ensures the identification of Title VI/Nondiscrimination population(s), affords the population(s) opportunities to comment, and provides an atmosphere where all comments are promptly addressed with regard to the location and design of highway construction projects. Additionally, the Recipient shall not locate, design, or construct a highway in such a manner as to deny access to, and use thereof, to any persons on the basis of race, color, national origin, sex, age, or disability.

 

More specifically and without limiting the above general Assurance, the Recipient agrees with and gives, the following Assurance with respect to its federally-assisted highway program, as follows:

 

  1. The Recipient agrees that each “program” and each “facility” as defined in §§21.23 (b) and 21.23 (e) of 49 C.F.R. § 21 will be (with regard to a “program”) conducted, or will be (with regard to a “facility”) operated in compliance with all requirements imposed by, or pursuant to, the Acts and the Regulations;

  2. The Recipient shall insert the following notification in all solicitations for bids and Requests For Proposals for work or material subject to the Acts and the Regulations made in connection with all Federal Highway Programs and, in adapted form, in all proposals for negotiated agreements regardless of funding source:

    The Massachusetts Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4), other Nondiscrimination requirements (The Federal-Aid Highway Act of 1973, The Age Discrimination Act of 1975, Section 504 of the Rehabilitation Act of 1973, and Americans with Disabilities Act of 1990), and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement will be awarded without discrimination on the ground of race, color, national origin, sex, age, or disability.”;


  3. The Recipient shall insert the clauses of “Appendix A” of this Assurance in every contract or agreement subject to the Acts and the Regulations;

  4. The Recipient shall insert the clauses of “Appendix B” of this Assurance, as a covenant running with the land, in any deed from the United States effecting or recording a transfer of real property, structures or improvements thereon or interest therein to a Recipient;

  5. The Recipient shall insert the following language in all Federal-Aid Agreements entered into with the FHWA:

    The State of Massachusetts, acting through its Department of Transportation (Recipient) HEREBY AGREES THAT, as a condition to receiving Federal financial assistance from the United States Department Of Transportation, Federal Highway Administration, it is subject to and shall comply with Title VI of the Civil Rights Act of 1964 and additional Nondiscrimination requirements as detailed in the FHWA Assurances for Title VI and Other Nondiscrimination Statutes and Regulations document.


  6. That where the Recipient receives Federal financial assistance to construct a facility, or part of a facility, the Assurance shall extend to the entire facility and facilities operated in connection therewith;

  7. That where the Recipient receives Federal financial assistance in the form, or for the acquisition of real property or an interest in real property, the Assurance shall extend to rights to space on, over or under such property;

  8. That the Recipient shall “include the appropriate clauses set forth in Appendix C and Appendix D” of this Assurance, as a covenant running with the land, in any future deeds, leases, licenses, permits, or similar instruments entered into by the Recipient with other parties:

    • For the subsequent transfer of real property acquired or improved under the applicable Project or Program; and
    • For the construction or use of, or access to, space on, over, or under real property acquired or improved under the applicable Project or Program.

  9. That this Assurance obligates the Recipient for the period during which Federal financial assistance is extended to the program, except where the Federal financial assistance is to provide, or is in the form of, personal property, or real property or interest therein or structures or improvements thereon, in which case the Assurance obligates the Recipient or any transferee for the longer of the following periods:

    • The period during which the property is used for a purpose for which the Federal financial assistance is extended, or for another purpose involving the provision of similar services or benefits; or
    • The period during which the Recipient retains ownership or possession of the property.

  10. The Recipient shall provide for such methods of administration for the program as are found by the Secretary of Transportation or the official to whom he/she delegates specific authority to give reasonable guarantee that it, other recipients, sub-recipients, sub- grantees, contractors, subcontractors, transferees, successors in interest, and other participants of Federal financial assistance under such program will comply with all requirements imposed or pursuant to the Acts, the Regulations, and this Assurance; and

  11.  The Recipient agrees that the United States has a right to seek judicial enforcement with regard to any matter arising under the Acts, the Regulations, and this Assurance.

 

THIS ASSURANCE is given in consideration of and for the purpose of obtaining any and all Federal grants, loans, contracts, agreements, property, and/or discounts, or other Federal-aid and Federal financial assistance extended after the date hereof to the recipients by the Department of Transportation under the Federal Highway Program and is binding on it, other recipients, sub- recipients, sub-grantees, contractors, subcontractors and their subcontractors’, transferees, successors in interest, and any other participants in the Federal Highway Programs. The person or persons whose signature appears below are authorized to sign this assurance on behalf of the Recipient.

 

 

TITLE VI/NONDISCRIMINATION AGREEMENT AND SUB-RECIPIENT ASSURANCES

The Boston Region MPO [Grantee] (hereinafter referred to as the “Sub-Recipient”), HEREBY AGREES THAT, as a condition to receiving any Federal financial assistance from the United States Department of Transportation (USDOT), Federal Highway Administration, from the Massachusetts Department of Transportation (Recipient), it is subject to and must comply with the Statutory/Regulatory Authorities and requirements detailed in this document.

THIS ASSURANCE is given in consideration of and for the purpose of obtaining any and all Federal grants, loans, contracts, agreements, property, and/or discounts, or other Federal-aid and Federal financial assistance extended after the date hereof to the recipients by the Department of Transportation under the Federal Highway Program and is binding on it, other recipients, sub- recipients, sub-grantees, contractors, subcontractors and their subcontractors’, transferees, successors in interest, and any other participants in the Federal Highway Programs. The person or persons whose signature appears below are authorized to sign this assurance on behalf of the Sub-Recipient.

 

 

 

APPENDIX A

During the performance of this contract, the contractor, for itself, its assignees and successors in interest (hereinafter referred to as the “contractor”) agrees as follows:

 

  1. Compliance with Regulations: The contractor shall comply with the Acts and the Regulations relative to Nondiscrimination in federally-assisted programs of the U.S. Department of Transportation, Federal Highway Administration, as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract.

  2. Nondiscrimination: The contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, national origin, sex, age, or disability in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor shall not participate either directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers a program set forth in Appendix B of 49 CFR Part 21.

  3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the contractor of the contractor’s obligations under this contract and the Acts and the Regulations relative to Nondiscrimination on the grounds of race, color, national origin, sex, age, or disability.

  4. Information and Reports: The contractor shall provide all information and reports required by the Acts, the Regulations and directives issued pursuant thereto and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Recipient or the Federal Highway Administration (FHWA) to be pertinent to ascertain compliance with such Acts, Regulations, orders, and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information the contractor shall so certify to the Recipient or the FHWA, as appropriate, and shall set forth what efforts it has made to obtain the information.

  5. Sanctions for Noncompliance: In the event of the contractor’s noncompliance with the Nondiscrimination provisions of this contract, the Recipient shall impose such contract sanctions as it or the FHWA may determine to be appropriate, including, but not limited to:

  6. Incorporation of Provisions: The contractor shall include the provisions of paragraphs 1 through 6 in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The contractor shall take such action with respect to any subcontract or procurement as the Recipient or the FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the contractor may request the Recipient to enter into such litigation to protect the interests of the Recipient and, in addition, the contractor may request the United States to enter into such litigation to protect the interests of the United States.

APPENDIX B

CLAUSES FOR DEEDS TRANSFERING UNITED STATES PROPERTY

The following clauses shall be included in deeds effecting or recording the transfer of real property, structures or improvements thereon, or granting interest therein from the United States pursuant to the provisions of Assurance 4:

 

NOW, THEREFORE, the Department of Transportation, as authorized by law, and upon the condition that the (Name of Recipient) will accept title to the lands and maintain the project constructed thereon, in accordance with (Name of Appropriate Legislative Authority), the Regulations for the Administration of Federal Highway Programs and the policies and procedures prescribed by the Federal Highway Administration of the Department of Transportation and, also in accordance with and in compliance with all requirements imposed by or pursuant to Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation pertaining to and effectuating the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252; 42 U.S.C. § 2000d to 2000d-4), does hereby remise, release, quitclaim and convey unto the (Name of Recipient) all the right, title and interest of the Department of Transportation in and to said lands described in Exhibit “A” attached hereto and made a part hereof.

 

TO HAVE AND TO HOLD said lands and interests therein unto (Name of Recipient) and its successors forever, subject, however, to the covenants, conditions, restrictions and reservations herein contained as follows, which will remain in effect for the period during which the real property or structures are used for a purpose for which Federal financial assistance is extended or for another purpose involving the provision of similar services or benefits and shall be binding on the (Name of Recipient), its successors and assigns.

 

The (Name of Recipient), in consideration of the conveyance of said lands and interests in lands, does hereby covenant and agree as a covenant running with the land for itself, its successors and assigns, that (1) no person shall on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination with regard to any facility located wholly or in part on, over or under such lands hereby conveyed [,] [and]* (2) that the (Name of Recipient) shall use the lands and interests in lands and interests in lands so conveyed, in compliance with all requirements imposed by or pursuant to Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation - Effectuation of Title VI of the Civil Rights Act of 1964, and as said Regulations may be amended, and (3) that in the event of breach of any of the above- mentioned nondiscrimination conditions, the Department shall have a right to re-enter said lands and facilities on said land, and that above described land and facilities shall thereon revert to and vest in and become the absolute property of the Department of Transportation and its assigns as such interest existed prior to this instruction.*

 

*Reverter clause and related language to be used only when it is determined that such a clause is necessary in order to effectuate the purpose of Title VI and related Nondiscrimination laws.



 APPENDIX C

CLAUSES FOR TRANSFER OF REAL PROPERTY ACQUIRED OR IMPROVED UNDER THE FEDERAL HIGHWAY PROGRAMS

 

The following clauses shall be included in deeds, licenses, leases, permits, or similar instruments entered into by the (Name of Recipient) pursuant to the provisions of Assurance 8(a):

 

  1. The (grantee, lessee, permitee, etc. as appropriate) for himself/herself, his/her heirs, personal representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby covenant and agree [in the case of deeds and leases add “as a covenant running with the land”] that:

    • In the event facilities are constructed, maintained, or otherwise operated on the property described in this (deed, license, lease, permit, etc.) for a purpose for which a Department of Transportation program or activity is extended or for another purpose involving the provision of similar services or benefits, the (grantee, licensee, lessee, permitee, etc.) shall maintain and operate such facilities and services in compliance with all requirements imposed by the Acts and Regulations (as may be amended) set forth in the Title VI/Nondiscrimination Assurance agreement

    • No person on the grounds of race, color, national origin, sex, age, or disability shall be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities.

  2. With respect to licenses, leases, permits, etc., in the event of breach of any of the above Nondiscrimination covenants, (Name of Recipient) shall have the right to terminate the lease, license, permit, etc. and to re-enter and repossess said lands and facilities thereon, and hold the same as if the lease, license, permit, etc. had never been made or issued.

  3. With respect to a deed, in the event of breach of any of the above nondiscrimination covenants, the (Name of Recipient) shall have the right to re-enter the lands and facilities thereon, and the above described lands and facilities shall thereupon revert to and vest in and become the absolute property of the (Name of Recipient) and its assigns.

APPENDIX D

CLAUSES FOR CONSTRUCTION/USE/ACCESS TO REAL PROPERTY ACQUIRED UNDER THE FEDERAL HIGHWAY PROGRAM

 

 

The following clauses shall be included in deeds, licenses, permits, or similar instruments entered into by (Name of Recipient) pursuant to the provisions of Assurance 8(b):

 

  1. The (grantee, licensee, permitee, etc., as appropriate) for himself/herself, his/her heirs, personal representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby covenant and agree (in the case of deeds and leases add “as a covenant running with the land”) that (1) no person on the ground of race, color, national origin, sex, age, or disability shall be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities, (2) that in the construction of any improvements on, over or under such land and the furnishing of services thereon, no person on the ground of race, color, national origin, sex, age, or disability shall be excluded from participation in, denied the benefits of, or otherwise be subjected to discrimination, (3) that the (grantee, licensee, lessee, permitee, etc.) shall use the premises in compliance with all other requirements imposed by or pursuant to the Acts and Regulations, as amended, set forth in the Title VI/Nondiscrimination Assurance agreement.

  2. With respect to licenses, leases, permits, etc., in the event of breach of any of the above Nondiscrimination covenants, (Name of Recipient) shall have the right to terminate the (license, permit, etc., as appropriate) and to re-enter and repossess said land and the facilities thereon, and hold the same as if said (license, permit, etc., as appropriate) had never been made or issued.*

  3. With respect to deeds, in the event of breach of any of the above nondiscrimination covenants, (Name of Recipient) shall have the right to re-enter said land and facilities thereon, and the above described lands and facilities shall thereupon revert to and vest in and become the absolute property of (Name of Recipient) and its assigns.*

 

*Reverter clause and related language to be used only when it is determined that such a clause is necessary to effectuate the purpose of Title VI and related Nondiscrimination laws.


Title VI Activities

No changes.

 

The Planning Process and Its Responsiveness to Title VI Requirements

No changes.

 

Activities Undertaken to Identify the Needs of Low-Income and Minority Populations

No major changes. The Transportation Equity Survey continues to be posted on the MPO website. Additional comments have been received since the last comment summary. The MPO has expanded the list of organizations to be contacted in its outreach program. In order to identify additional organizations to include in its outreach and consultations, the MPO is surveying local officials in municipalities with transportation analysis zones that meet the MPO criteria for environmental justice areas.

 

Section 3: Public Involvement [FTA C 4702.1A IV.7.a and FTA C 4702.1A IV.9]

No changes.

 

Section 4: Contracting Opportunities

None. The MPO has no fiduciary authority.

 

Section 5: Community Impact Assessment [23 USC 109(h); FTA C 4702.1A IV.7.a; FHWA 23 CFR 200.9(b)(4)]

Overview

No changes.

 

MPO Policy and Plans

No changes.

 

The Transportation Planning Process

No changes.


Demographic Profile of Environmental Justice Areas [FTA C 4702.1A VII.1.a]

The MPO has produced new demographic profiles of the region using 2010 Census data and 2006–10 American Community Survey data. They will be forwarded when finalized.

Identification of Needs of Low-Income and Minority Populations [FTA C 4702.1A VII.1.b]

No changes.

 

How Community Values, Environmental Justice, and Discrimination Considerations Are Addressed

No changes.

 

Section 6: Service Equity

Long-Range Transportation Plan and Transportation Improvement Program: Assessment of Projects for Impacts on Environmental Justice Populations

No changes.

 

Coordination with Citizens and Community-Based Entities in Defining Environmental Justice Communities for the Purpose of Assessing Transportation Impacts

No changes in general. The MPO has made plans for conducting outreach activities in 2013.

Studies Sensitive to Title VI, Environmental Justice, and/or ADA Adherence

The following describes the MPO’s recently completed projects, current work, and upcoming initiatives in the federal fiscal year (FFY) 2013 Unified Planning Work Program (UPWP) that provide data collection and analysis supportive of MPO coordination of environmental justice (EJ) issues or help in addressing the transportation needs of minority, LEP, and low-income residents.


Transportation Equity/Environmental Justice Support

The primary purpose of this ongoing project is to integrate EJ issues and concerns into MPO planning and programming activities and support development of the Long-Range Transportation Plan (LRTP), UPWP, TIP, Congestion Management Process (CMP), air quality conformity determinations, and project-specific work products. Another purpose is to foster awareness of the MPO in EJ populations and to facilitate their participation in MPO planning and programming. This has been done through continued outreach to minority, LEP, and low-income populations.

Analysis of JARC and New Freedom Projects

Many MPO-recommended proposals for the Federal Transit Administration’s (FTA’s) Job Access and Reverse Commute (JARC) and New Freedom grant programs were funded during the last four years. These proposals include: conducting studies on how to facilitate coordination of existing transportation resources, identifying resource gaps and developing strategies for closing them, enhancing consumers’ abilities to access and use transportation options, and planning for and operating paratransit.

The MPO conducted analysis to help determine which of these projects were effective and will use this information to recommend future projects, to encourage the use of best practices, and to update the Coordinated Public-Transit Human Services Transportation Plan. A draft memo documenting the analysis has been produced. A copy of the memo will be forwarded to MassDOT when it is finalized.

MBTA Neighborhood Maps

Using the latest mapping software and data, CTPS is in the process of creating a neighborhood map showing streets, street names, building footprints, points of interest, and MBTA bus routes for each MBTA station. Each map has a “You Are Here” designation at the station location, as well as a quarter-mile-radius ring depicting the distance of a 5-to-10-minute walk from the station.

MetroWest RTA Transit Planning Assistance

When the MWRTA was established, the MPO conducted a study that explored potential markets and provided service planning assistance. As the MWRTA enters its fifth year of service, it could benefit from an evaluation of route efficiencies and demands. In federal fiscal year 2013, the MPO will evaluate existing transit service, identify potential improvements to present routes and schedules, and propose new services to meet untapped demand and relieve traffic congestion.


Disability Access Support

The MPO supports the MBTA in meeting ADA requirements by providing ongoing support to the Access Advisory Committee to the MBTA (AACT), a user group representing people with disabilities. AACT advises the MBTA on all accessibility matters relating to the use of the MBTA’s systemwide fixed-route services and THE RIDE paratransit service by people with disabilities and ensures that users’ ideas and concerns about accessible transportation in the region are heard.

One requirement of the 1990 Americans with Disabilities Act (ADA) is that government agency material that is distributed to the public be made available in accessible formats, in a timely manner, upon request. The MPO fulfills this requirement. Beginning in 2012, the MPO has adopted a practice of providing materials prepared for the MPO that are posted on the MPO website in PDF and HTML formats so that they can be read by contemporary screen reader technology. In addition to providing materials in accessible formats, the MPO has developed accessibility standards and guidelines for the conduct of MPO- sponsored meetings.

Priority Corridors for LRTP Needs Assessment

Corridor analysis is a logical way to approach transportation studies in the region. Possible corridors of critical and strategic concern might best be viewed in a programmatic way. An arterial management/roadway improvement effort will recommend conceptual improvements for corridors that the CMP and the LRTP identified as part of the needs assessment process. A particular corridor or several sections of multiple corridors could be selected. Fifteen candidate locations are included in the FFY 2013 UPWP. Seven of the 15 corridors are either entirely or partially in communities with MPO-defined environmental justice areas. The Route 203 corridor in Boston was studied in FFY 2012. This corridor runs through an MPO EJ area.

Update the Elderly Transportation Services Database

In 2010, the MPO completed a database of transportation services available to elderly residents in each community in the region. The database, available to the public on the MPO website, is currently being updated.

Warren Street Transportation Study

In 2012, MAPC worked with the Nuestra Comunidad Development Corporation in Roxbury to identify potential improvements to the Warren Street corridor, based on numerous previous transportation studies of the area. The work focused on how transportation improvements could support redevelopment of underutilized parcels along the corridor.


MAPC presented at and helped facilitate a workshop in the Dudley Square neighborhood of Roxbury on July 14, 2012, for identifying improvements that could help create complete streets and safer intersection crossings in the area. MAPC worked with Renaissance Consulting Group to present information on the neighborhood and plans that have been completed for the area over the last 10 years. Attendees conducted a field walk and worked together to identify ways to improve transit, walking, and biking in the area.

Mystic River Corridor Walking Routes

MAPC has been working with the communities of Chelsea, Everett, Malden, Medford, and Somerville to create a network of safe and well-signed walking routes to the lower Mystic River and its tributaries (Chelsea Creek, Mill Creek, and the Malden River). The work program identified key implementation links and assisted the communities in finalizing the network vision. http://www.mapc.org/smart-growth/environment/mystic-river

Technical Assistance to Local Bicycle and Pedestrian Planning Initiatives

MAPC is working in Malden, Everett, Chelsea, Revere, Lynn, and Saugus to identify easily implementable bicycle and pedestrian infrastructure improvements. As part of the planning effort, existing conditions and potential opportunities will be identified for each area. The planning effort will identify priority connections and routes for each of the communities, including proposed bicycle and pedestrian accommodations, produce cross-sections of the major collector roads in the communities, and identify opportunities to help fund implementation. The proposed accommodations could include exclusive bicycle lanes, sharrows, cycle tracks, new sidewalks, and improved surface conditions. At the conclusion of the planning effort, it will be the responsibility of the individual municipalities to implement the recommendations.

Opportunities for and Impediments to Creating Transit-Oriented Development

In Quincy, MAPC is working to identify the potential for transit-oriented development (TOD) around the Wollaston MBTA station on the Red Line. It is analyzing the area to identify potential impediments to development, such as existing zoning, inadequate pedestrian connections, parking challenges, and other infrastructure elements, and will offer recommendations on how to improve the site’s potential for TOD. MAPC is working closely with the MBTA, property owners, and the City of Quincy.

Staff kicked off the station area TOD planning effort in the Wollaston neighborhood on November 29, 2012, with a public meeting where they


presented the project, provided background information on the area, and asked meeting participants to talk about how and where new development could be accommodated in the neighborhood. The meeting engaged about 80 participants in facilitated small-group dialogue. MAPC staff will be using this input to create a scenario for future investment in the area as well as recommendations for changes to land use, zoning, transportation access and safety; they will conduct market analyses to support their recommendations. Outreach focused on engaging the Asian community in the neighborhood through the Asian Community Development Corporation.

 

Bike Share Program Implementation

MAPC has been working with the cities of Boston, Cambridge, and Somerville and the Town of Brookline on implementation of the regional Hubway bike share system. In the summer of 2011, Boston launched a 600-bicycle, 60-station system, which expanded into neighboring municipalities in 2012. Funding for the program comes from the Boston Region MPO’s Clean Air and Mobility Program, a separate FTA Bus Livability award, and from the municipalities.

Through funding from the Barr Foundation, MAPC is working with the municipalities to create a $5 annual Hubway membership for low-income participants. MAPC is also researching strategies to increase Hubway ridership in low-income and low-education-level communities and developing partnerships with community-based agencies to host focus groups and distribute information about Hubway. The Barr Foundation is also funding several Hubway stations that will continue to grow the program further into environmental justice communities in Boston.

MetroFuture Outreach and Engagement: Increasing the Equity Focus in Regional Planning

In 2011, MAPC finalized its State of Equity report, which is the first report in its Regional Indicators program. This document establishes a baseline for MAPC’s equity-related indicators; the program will track the region’s progress toward the MetroFuture goals. http://regionalindicators.org/

In 2012, MAPC used this information to support community outreach efforts to engage more groups that are traditionally not involved in the regional planning process. Metropolitan planning funds were used to support outreach efforts for the Fairmount/Indigo Corridor Planning Initiative and the Fairmount Greenway Initiative, twin transit-oriented development projects that focus on historically EJ communities in Boston. MAPC is working with the Boston Redevelopment Authority, Community Development Corporations, and community-based coalitions, playing a critical role in the outreach to and engagement of residents.


In November 2012, approximately 250 people from the neighborhoods participated in a community planning charrette.

Sullivan Square/Rutherford Avenue Land Use Visioning

MAPC will work closely with the City of Boston to study the potential for redevelopment of the Sullivan Square area into a transit-oriented, mixed-use center that will better connect the transit station to residential neighborhoods in Charlestown and interconnect existing and new open spaces. This Boston neighborhood includes MPO-identified EJ TAZs. The land use planning study and rezoning also aim to support the further development of a multimodal MBTA station at Sullivan Square that includes a commuter rail stop and future Urban Ring connections. As a corollary to the creation of a new street grid and development parcels, the study aims to enhance the public realm by creating public sidewalks, new open spaces, and an appropriate mix and scale of residential and commercial development with active ground-floor uses. The transportation elements of this project are programmed in the LRTP in the 2016– 20 time period.

 

 

 

APPENDIX 1

REGIONAL TRANSPORTATION ADVISORY COUNCIL SELF-IDENTIFICATION SURVEY


 

Table 1

Race/Ethnicity of Advisory Council Members and the MPO Region Population


Race/Ethnicity*

Advisory Council

Boston Region MPO

White

88.2%

72.2%

Black/African American

5.9%

7.9%

Asian/Pacific Islander

0.0%

7.5%

Hispanic

2.9%

9.1%

Other

0.0%

3.2%

No response

                                2.9%                                        NA

Total

100.0%                                100.0%

 

*Hispanics can belong to any racial group, but they are given a separate category in this analysis.

Eighty-five percent (30) of the responding Advisory Council members speak English at home versus 76% of the MPO population (the MPO language data are for persons five and older). Of the four respondees who indicated that they speak one or more languages other than English at home, one did not indicate which language is spoken. The languages spoken by the other three respondees are Arabic, French, and French and Spanish.

The MPO’s definition of a low-income household is one whose annual income is

$42,497 or less. This threshold is equivalent to 60% of the MPO median household income of $70,829. One respondent indicated that his/her household income meets the low-income criterion. Approximately 88% of the respondents have incomes greater than

$60,000.

 

 

AW/aw

 

 

APPENDIX 2

TIP PROJECTS WITH HIGHWAY FUNDING

Section 1A / Federal Aid Target Projects                                                                                                                                                                                                                                                                               

STP - Surface Transportation Program

607209

SOMERVILLE- RECONSTRUCTION OF BEACON STREET, FROM OXFORD STREET TO CAMBRIDGE

C.L.

4

STP

$      1,571,252

$      1,257,002

$          314,250

STP+SAFETEA-LU Earmark Total Cost =

$4,158,466

602984

CONCORD- LINCOLN- LIMITED ACCESS HIGHWAY IMPROVEMENTS AT ROUTE 2 & 2A, BETWEEN CROSBY'S CORNER & BEDFORD ROAD, INCLUDES C-19-024

4

STP-AC

$ 11,775,130

$      9,420,104

$      2,355,026

AC Yr 3 of 4; STP+HSIP+CMAQ Total Cost =

$61,723,980 ($22,471,587 programmed within FFYs 2013-16 TIP)

601825

DANVERS- RECONSTRUCTION OF LIBERTY STREET, FROM ROUTE 128 TO WATER/HIGH STREET INTERSECTION, INCLUDES D-03-004 & D-

03-014

4

STP

$      7,128,052

$      5,702,442

$      1,425,610

 

601630

WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA)

6

STP-AC

$      3,340,620

$      2,672,496

$          668,124

AC Yr 1 of 3; STP+ TEA-21 Earmark Total Cost

= $38,340,000

605188

CAMBRIDGE- COMMON IMPROVEMENTS AT WATERHOUSE STREET, MASS AVE & GARDEN STREET

6

TE

$      1,093,334

$          874,667

$          218,667

Construction; TE+Statewide TE+SAFETEA-LU Earmark Total Cost = $2,764,874

604687

ARLINGTON- RECONSTRUCTION OF MASSACHUSETTS AVENUE, FROM POND LANE TO THE CAMBRIDGE C.L.

4

TE

$          474,668

$          379,734

$            94,934

CMAQ+TE+Statewide TE+SAFETEA-LU

Earmark+Section 129 Earmark Total Cost =

$5,880,740

STP Subtotal ►

$ 25,383,056

$ 20,306,445

$      5,076,611

◄ 80% Federal + 20% Non-Federal

 

NHS - National Highway System

603711

NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04- 021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADD- A-LANE - CONTRACT V)

6

NHS-AC

$ 26,000,000

$ 20,800,000

$      5,200,000

AC Yr 1 of 5; NHS+BR Total Cost =

$127,500,000 ($120,000,000 programmed within FFYs 2013-16 TIP, AC Yr 5 of 5 will be programmed in FFY 2017)

NHS Subtotal ►

$ 26,000,000

$ 20,800,000

$      5,200,000

◄ 80% Federal + 20% Non-Federal

 

HSIP - Highway Safety Improvement Program

602984

CONCORD- LINCOLN- LIMITED ACCESS HIGHWAY IMPROVEMENTS AT ROUTE 2 & 2A, BETWEEN CROSBY'S CORNER & BEDFORD ROAD, INCLUDES C-19-024

4

HSIP-AC

$      5,296,710

$      4,767,039

$          529,671

AC Yr 3 of 4; STP+HSIP+CMAQ Total Cost =

$61,723,980 ($22,471,587 programmed within FFYs 2013-16 TIP)

HSIP Subtotal ►

$      5,296,710

$      4,767,039

$          529,671

◄ Funding Split Varies by Project Specifications

 

CMAQ - Congestion Mitigation and Air Quality Improvement Program

604687

ARLINGTON- RECONSTRUCTION OF MASSACHUSETTS AVENUE, FROM POND LANE TO THE CAMBRIDGE C.L.

4

CMAQ

$      2,978,340

$      2,382,672

$          595,668

CMAQ+TE+Statewide TE+SAFETEA-LU

Earmark+Section 129 Earmark Total Cost =

$5,880,740

602094

LYNN- RECONSTRUCTION OF ROUTE 129 (BROADWAY), FROM WYOMA SQUARE TO BOSTON STREET

4

CMAQ

$      5,273,913

$      4,219,130

$      1,054,783

 

456661

CLEAN AIR AND MOBILITY

N/A

CMAQ

$          823,010

$          658,408

$          164,602

 

606885

Arlington- Bikeway Connection at Intersection Route 3 and Route 60

4

CMAQ

$          570,000

$          456,000

$          114,000

 

456661

Brookline- Bike Share, Year 3

 

CMAQ

$            95,732

$            76,586

$            19,146

 

456661

Cambridge- Bike Share, Year 3

 

CMAQ

$          157,278

$          125,822

$            31,456

 

CMAQ Subtotal ►

$      9,075,263

$      7,260,210

$      1,815,053

◄ 80% Federal + 20% Non-Federal

 

Section 1A / Fiscal Constraint Analysis

Total Federal Aid Target Funds Programmed ►

$ 65,755,029

$ 65,755,029

◄Total Target

$                           -

Target Funds Available

Total STP Programmed

$ 25,383,056

$ 52,864,898

Max. STP

$          27,481,842

STP Available

Total NHS Programmed

$ 26,000,000

$                    -

◄ Min. NHS

$       (26,000,000)

NHS funds are from STP

Total HSIP Programmed

$      5,296,710

$      4,296,710

◄ Min. HSIP

$         (1,000,000)

HSIP Minimum Met

Total CMAQ Programmed ►

$      9,075,263

$      8,593,421

◄ Min. CMAQ

$             (481,842)

CMAQ Minimum Met

 

Section 1B / Federal Aid Bridge Projects                                                                                                                                                                                                                                                                              

 

607110

BEDFORD- BRIDGE PRESERVATION, SR 4 (GREAT

ROAD) OVER THE SHAWSHEEN RIVER

4

BR-Off

$          586,250

$          469,000

$          117,250

 

606448

BOSTON- DECK PATCHING & SUPERSTRUCTURE

REPAIRS ON B-16-365 (BOWKER OVERPASS)

6

BR-On

$ 10,800,110

$      8,640,088

$      2,160,022

 

607111

CONCORD- BRIDGE PRESERVATION, OLD STOW

ROAD OVER MBTA & BM RAILROAD

4

BR-Off

$          825,000

$          660,000

$          165,000

 

605774

HOPKINTON- BRIDGE BETTERMENT, H-23-012, I-90

RAMP OVER I-495

3

BR-On

$      5,341,960

$      4,273,568

$      1,068,392

 

603711

NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04- 021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADD- A-LANE - CONTRACT V)

6

BR-AC

$      2,000,000

$      1,600,000

$          400,000

AC Yr 1 of 5; NHS+BR Total Cost =

$127,500,000 ($120,000,000 programmed within FFYs 2013-16 TIP, AC Yr 5 of 5 will be programmed in FFY 2017)

600703

LEXINGTON- BRIDGE REPLACEMENT, L-10-009,

ROUTE 2 (EB & WB) OVER ROUTE I-95 (ROUTE 128)

4

BR-AC

$      1,800,000

$      1,440,000

$          360,000

AC Yr 1 of 3; Total Cost = $31,800,000

BR Subtotal ►

$ 21,353,320

$ 17,082,656

$      4,270,664

◄ 80% Federal + 20% Non-Federal

 

Section 1C / Federal Aid Non-Target Projects                                                                                                                                                                                                                                                                     

Earmarks

606209

FRAMINGHAM- RECONSTRUCTION OF ROUTE 126 (CONCORD STREET)

3

HPP (1998)

$      3,983,545

$      3,186,836

$          796,709

Construction; HPP 684; TEA-21 Earmark+Section 129 Earmark+Local Funds Total Cost = $8,347,738

601630

WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA)

6

HPP (1998)

$      7,999,380

$      6,399,504

$      1,599,876

Construction; HPP 1236; AC Yr 1 of 3; STP+TEA-21 Earmark Total Cost =

$38,340,000

604687

ARLINGTON- RECONSTRUCTION OF MASSACHUSETTS AVENUE, FROM POND LANE TO THE CAMBRIDGE C.L.

4

HPP (2005)

$      1,455,400

$      1,164,320

$          291,080

Construction; CMAQ+TE+Statewide TE+SAFETEA-LU Earmark+Section 129 Earmark Total Cost = $5,880,740

606889

BOSTON- IMPROVEMENTS TO GAINSBOROUGH AND ST. BOTOLPH STS.

6

HPP (2005)

$          500,000

$          400,000

$          100,000

Design; HPP 2012; Local Match

606226

BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN

SQUARE

6

HPP (2005)

$      1,124,874

$          899,899

$          224,975

Design; HPP 3568; Local Match

605188

CAMBRIDGE- COMMON IMPROVEMENTS AT WATERHOUSE STREET, MASS AVE & GARDEN STREET

6

HPP (2005)

$      1,124,874

$          899,899

$          224,975

Construction; TE+Statewide TE+SAFETEA-LU Earmark Total Cost = $2,764,874

604988

FRANKLIN- RECONSTRUCTION OF ROUTE 140, MAIN STREET & EMMONS STREET (DOWNTOWN ENHANCEMENTS)

3

HPP (2005)

$      5,754,819

$      4,603,855

$      1,150,964

Construction; HPP 4279

606235

QUINCY- ADAMS GREEN TRANSPORTATION

IMPROVEMENTS

6

HPP (2005)

$      6,711,062

$      5,368,850

$      1,342,212

Construction; HPP 4272

607209

SOMERVILLE- RECONSTRUCTION OF BEACON STREET, FROM OXFORD STREET TO CAMBRIDGE

C.L.

4

HPP (2005)

$      2,587,214

$      2,069,771

$          517,443

Construction; HPP 431; STP+SAFETEA-LU Earmark Total Cost = $4,158,466

604687

ARLINGTON- RECONSTRUCTION OF MASSACHUSETTS AVENUE, FROM POND LANE TO THE CAMBRIDGE C.L.

4

§ 129 (2008)

$          735,000

$          735,000

$                    -

Construction; CMAQ+TE+Statewide TE+SAFETEA-LU Earmark+Section 129 Earmark Total Cost = $5,880,740

606209

FRAMINGHAM- RECONSTRUCTION OF ROUTE 126

(CONCORD STREET)

3

§ 129 (2008)

$          490,000

$          490,000

$                    -

Construction; TEA-21 Earmark+Section 129

Earmark+Local Funds Total Cost = $8,347,738

606226

BOSTON- RECONSTRUCTION OF RUTHERFORD

AVENUE, FROM CITY SQUARE TO SULLIVAN

6

TI (2005)

$      3,000,000

$      2,400,000

$          600,000

Design; HPP TI 174; Local Match

604361

BOSTON- CAMBRIDGE- BRIDGE REHABILITATION, B-16-009=C-01-002, CAMBRIDGE STREET OVER THE CHARLES RIVER (LONGFELLOW BRIDGE)

6

§ 112 (2006)

$          693,000

$          693,000

$                    -

 

 

Earmarks (continued)

MBTA

WACHUSETT COMMUTER RAIL EXTENSION

 

REF

$          408,179

$          408,179

$                    -

Repurposed Earmark Funding

MBTA

WACHUSETT COMMUTER RAIL EXTENSION

 

REF

$          983,928

$          983,928

$                    -

Repurposed Earmark Funding

MBTA

WACHUSETT COMMUTER RAIL EXTENSION

 

REF

$          495,000

$          495,000

$                    -

Repurposed Earmark Funding

N/A

BOSTON INNER HARBOR FERRY SERVICE

 

FBD

$      1,600,000

$      1,280,000

$          320,000

Ferry Boat Discretionary (FBD) Program; City of Boston Match; previously programmed in FFY

2012

N/A

WATERTOWN BIKE PATH, PHASE II ROW ACQUISITION

 

HPP (1998)

$          599,856

$          479,885

$          119,971

ROW Acquisition; HPP 1400; TEA-21 (HPP 1400)+TEA-21 (HPP 1424) + City of Cambridge ($200,000) + DCR ($819,787) Total Cost =

$1,500,000

N/A

WATERTOWN BIKE PATH, PHASE II ROW ACQUISITION

 

HPP (1998)

$                  409

$                  327

$                    82

ROW Acquisition; HPP 1424; TEA-21 (HPP 1400)+TEA-21 (HPP 1424) + City of Cambridge ($200,000) + DCR ($819,787) Total Cost =

$1,500,000

N/A

FAIRMOUNT CORRIDOR BUSINESS DEVELOPMENT AND RIDERSHIP INITIATIVE

 

TCSP

$          440,625

$          352,500

$            88,125

Transportation, Community and System Preservation

Program (TCSP); State Match

Earmarks Subtotal ►

$ 40,687,164

$ 33,310,753

$      7,376,411

◄ Funding Split Varies by Earmark

 

 

Other

604687

ARLINGTON- RECONSTRUCTION OF MASSACHUSETTS AVENUE, FROM POND LANE TO THE CAMBRIDGE C.L.

4

Statewide TE

$          237,332

$          189,866

$            47,466

CMAQ+TE+Statewide TE+SAFETEA-LU

Earmark+Section 129 Earmark Total Cost =

$5,880,740

605188

CAMBRIDGE- COMMON IMPROVEMENTS AT WATERHOUSE STREET, MASS AVE & GARDEN STREET

6

Statewide TE

$          546,666

$          437,333

$          109,333

Construction; TE+Statewide TE+SAFETEA-LU Earmark Total Cost = $2,764,874

Other Subtotal ►

$          783,998

$          627,198

$          156,800

◄ Funding Split Varies by Funding Source

Section 1D / Federal Aid Major & State Category Projects                                                                                                                                                                                                                                               

IM - Interstate Maintenance

N/A

FRANKLIN- INTERSTATE MAINTENANCE &

RELATED WORK ON I-495

3

IM

$      5,154,240

$      4,638,816

$          515,424

 

605596

FOXBOROUGH- INTERSTATE MAINTENANCE &

RELATED WORK ON I-95

5

IM

$      9,440,000

$      8,496,000

$          944,000

 

606170

LEXINGTON- BURLINGTON- INTERSTATE

MAINTENANCE & RELATED WORK ON I-95

4

IM

$ 33,205,200

$ 29,884,680

$      3,320,520

 

605597

LYNNFIELD- WAKEFIELD- INTERSTATE

MAINTENANCE & RELATED WORK ON I-95

4

IM

$ 12,685,000

$ 11,416,500

$      1,268,500

 

604879

WILMINGTON- WOBURN- INTERSTATE

MAINTENANCE & RELATED WORK ON ROUTE I-93

4

IM

$ 14,480,960

$ 13,032,864

$      1,448,096

 

IM Subtotal ►

$ 74,965,400

$ 67,468,860

$      7,496,540

◄ 90% Federal + 10% Non-Federal

 

NHSPP - National Highway System Preservation Program

605602

WEYMOUTH- RESURFACING & RELATED WORK ON

ROUTE 3

6

NHS

$      3,552,640

$      2,842,112

$          710,528

 

606126

MIDDLETON- RESURFACING & RELATED WORK ON

ROUTE 114

4

NHS

$      1,769,976

$      1,415,981

$          353,995

 

NHS Subtotal ►

$      5,322,616

$      4,258,093

$      1,064,523

◄ 80% Federal + 20% Non-Federal

 

 

SRTS - Safe Routes to School Program

606521

BRAINTREE- SAFE ROUTES TO SCHOOL (ROSS ELEMENTARY SCHOOL)

6

SRTS

$          553,000

$          553,000

$                    -

 

606516

WAKEFIELD- SAFE ROUTES TO SCHOOLS (DOLBEARE SCHOOL)

4

SRTS

$          513,000

$          513,000

$                    -

 

SRTS Subtotal

$      1,066,000

$      1,066,000

$                    -

◄ 100% Federal

 

Statewide Infrastructure Program

604937

LEXINGTON- NEWTON- WALTHAM- WELLESLEY- WESTON- TRAFFIC SIGN REPLACEMENT ON I-95, FROM WELLESLEY (ROUTE 9) TO LEXINGTON (ROUTES 4/225)

4

Statewide Infrastructure Program

$      2,800,000

$      2,240,000

$          560,000

 

Statewide Infrastructure Subtotal ►

$      2,800,000

$      2,240,000

$          560,000

◄ 80% Federal + 20% Non-Federal

 

Statewide ITS - Statewide Intelligent Transportation Systems Program

606432

BURLINGTON- WOBURN- READING- EXPANSION OF FIBER, CCTV, VMS & TRAFFIC SENSOR NETWORK ON I-95

4

Statewide ITS

$      4,000,000

$      3,200,000

$          800,000

 

606283

HOPKINTON TO ANDOVER- INSTALLATION OF CAMERAS, MESSAGE SIGNS & COMMUNICATION INFRASTRUCTURE ON I-495 (DESIGN/BUILD ITS)

3

Statewide ITS

$      6,000,000

$      4,800,000

$      1,200,000

 

606497

BRAINTREE- QUINCY- MILTON- BOSTON- HOV

LANE TOW TRUCK SERVICES

6

Statewide

ITS

$          550,000

$          440,000

$          110,000

 

606498

BRAINTREE- QUINCY- MILTON- BOSTON- HOV LANE BARRIER TRANSFER VEHICLE (BTV) OPERATOR CONTRACT

6

Statewide ITS

$      1,000,000

$          800,000

$          200,000

 

606422

BRAINTREE- QUINCY- MILTON- BOSTON- HOV

LANE OPERATING EXPENSES

6

Statewide

ITS

$          500,000

$          400,000

$          100,000

 

Statewide ITS Subtotal

$ 12,050,000

$      9,640,000

$      2,410,000

80% Federal + 20% Non-Federal

 

Statewide TE - Statewide Transportation Enhancement Program

602514

BEVERLY- CONSTRUCTION OF A WALKWAY ON BEVERLY HARBORFRONT

4

Statewide TE

$          570,665

$          456,532

$          114,133

 

606137

FRAMINGHAM- BIKE PATH CONSTRUCTION & IMPROVEMENTS ON COCHITUATE RAIL TRAIL, FROM SCHOOL STREET TO ROUTE 30

3

Statewide TE

$          792,731

$          634,185

$          158,546

 

605121

SALEM- CAUSEWAY PARK CONSTRUCTION

4

Statewide TE

$      1,441,650

$      1,153,320

$          288,330

 

Statewide TE Subtotal ►

$      2,805,046

$      2,244,037

$          561,009

◄ 80% Federal + 20% Non-Federal

 

Statewide HSIP - Statewide Highway Safety Improvement Program

 

No Projects Programmed

 

 

$                    -

$                    -

$                     -

 

Statewide HSIP Subtotal ►

$                    -

$                    -

$                     -

◄ Funding Split Varies by Project Specifications

Other

N/A

CENTRAL ARTERY/TUNNEL PROJECT- NATIONAL

HIGHWAY SYSTEM

N/A

Other

$ 50,295,000

$                    -

$                     -

 

N/A

CENTRAL ARTERY/TUNNEL PROJECT- STATE

TRANSPORTATION PROGRAM/FLEX

N/A

Other

$ 70,710,000

$                    -

$                     -

 

N/A

CENTRAL ARTERY/TUNNEL PROJECT- STATE

TRANSPORTATION PROGRAM

N/A

Other

$ 20,000,000

$                    -

$                     -

 

Other Subtotal ►

$ 141,005,000

$                    -

$                     -

◄ Funding Split Varies by Funding Source

 

Section 2A / Non-Federal Projects                                                                                                                                                                                                                                                                                          

N/A

GREEN LINE EXTENSION PROJECT- EXTENSION

N/A

Other

$ 79,300,000

$ 79,300,000

The Green Line Extension project is currently in

 

TO COLLEGE AVENUE WITH THE UNION SQUARE

 

 

 

 

the New Starts pipeline and the Commonwealth

 

SPUR

 

 

 

 

anticipates a decision in a Full Funding Grant

 

 

 

 

 

 

Agreement in FFY 2015. The cash flows for the

 

 

 

 

 

 

project, therefore, provide 100% bond funding

 

 

 

 

 

 

for FFY 2013-14 and begin programming New

 

 

 

 

 

 

Starts funding in FFY 2015. The

 

 

 

 

 

 

Commonwealth is committed to fully funding

 

 

 

 

 

 

this project with bond funds if New Starts is not

 

 

 

 

 

 

awarded.

N/A

FAIRMOUNT IMPROVEMENTS

N/A

Other

$ 24,139,099

$ 24,139,099

Lists cash flows (based on state fiscal year) for

 

 

 

 

 

 

Fairmount Improvements

N/A

RED LINE-BLUE LINE CONNECTOR DESIGN

N/A

Other

$ 10,000,000

$ 10,000,000

MassDOT made a formal request on Aug. 1,

 

 

 

 

 

 

2011, to remove this project from the State

 

 

 

 

 

 

Implementation Plan regulation. The MPO is

 

 

 

 

 

 

continuing to reference this project in the

 

 

 

 

 

 

document until the process is complete.

Non-Federal Projects Subtotal►

$ 113,439,099

$ 113,439,099

◄100% Non-Federal

 

 

Section 2B / Non-Federal Bridge Projects                                                                                                                                                                                                                                                                            

603654

BOSTON- BRIDGE REPLACEMENT, B-16-163, MORTON STREET OVER THE MBTA & CSX RAILROAD

6

ABP-GANS

$ 10,574,787

 

$                    -

Total Construction Cost = $10,692,912 ($10,574,787 is identified as GANs funding [federal and state match] and $118,125 is additional state funding)

604660

EVERETT- MEDFORD- BRIDGE REPLACEMENTS, REVERE BEACH PARKWAY (ROUTE 16), E-12- 004=M-12-018 OVER THE MALDEN RIVER (WOODS MEMORIAL BRIDGE) & M-12-017 OVER MBTA AND RIVERS EDGE DRIVE

4

ABP-GANS

$ 63,898,554

 

$                    -

Total Construction Cost = $64,528,554 ($63,898,554 is identified as GANs funding [federal and state match] and $630,000 is additional state funding)

Non-Federal Bridge Projects Subtotal►

$ 74,473,341

 

$                    -

◄100% Non-Federal

 

2013 Boston MPO TIP Summary - Highway

TIP Section 1:

TIP Section 2:

Total of All Projects

Total

Federal Funds

Non-Federal Funds

$ 227,588,573

$ 74,473,341

$ 302,061,914

Total Spending in Region

◄ Total Federal Spending in Region

◄ Total Non-Federal Spending in Region

$ 191,071,291

$ 191,071,291

$ 36,517,282

$ 74,473,341

$ 110,990,623


701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx

Section 3 / Transit Operating - Section 5307                                                                                                                                                                                                                                                                                                                                                             

 

MBTA

POWER PROGRAM

5307

$        47,267,526

 

 

$      11,816,882

$        59,084,408

 

 

MBTA

SYSTEMS UPGRADES

5307

$           8,786,066

 

 

$        2,196,517

$         10,982,583

 

 

MBTA

STATIONS (ACCESSIBILITY) - GOVERNMENT CENTER

5307

$        32,761,068

 

 

$        8,190,267

$        40,951,335

 

 

MBTA

STATIONS (ACCESSIBILITY) - STATE STREET

5307

$        17,197,512

 

 

$        4,299,378

$        21,496,890

 

 

MBTA

FACILITIES (YARDS, SHOPS, PARKING, ETC.) - PARKING SYSTEMS IMPROVEMENTS

5307

$        15,000,000

 

 

$        3,750,000

$        18,750,000

 

 

MBTA

PREVENTATIVE MAINTENANCE

5307

$        12,000,000

 

 

$        3,000,000

$         15,000,000

 

 

MBTA

REVENUE VEHICLES (193 ECD BUSES - OVERHAUL)

5307

$        32,399,405

 

 

$        8,099,851

$         40,499,256

YES, 2012

 

MBTA

STATIONS (ACCESSIBILITY) - STATIONS (ELEVATOR/ESCALATOR PROGRAM)

5307

$        22,000,000

 

 

$        5,500,000

$         27,500,000

YES, 2012

 

MBTA

SYSTEMS UPGRADES

5307

$           1,612,767

 

 

$            403,192

$           2,015,959

YES, 2012

 

MBTA

REVENUE VEHICLES (75 HYUNDAY

ROTEM COACHES -

5307

$        95,487,128

 

 

$      23,871,782

$      119,358,910

YES, 2010

 

MBTA

POWER PROGRAM

5307

$        60,000,000

 

 

$      15,000,000

$         75,000,000

YES, 2011

 

MBTA

FACILITIES (YARDS, SHOPS,

PARKING, ETC.) - SCIENCE PARK

5307

$        17,600,000

 

 

$        4,400,000

$         22,000,000

YES, 2011

 

MBTA

STATIONS (ACCESSIBILITY) -

STATION IMPROVEMENTS

5307

$        26,378,210

 

 

$        6,594,553

$         32,972,763

YES, 2009

& 2010

 

MBTA

STATIONS (ACCESSIBILITY) -

ORIENT HEIGHTS STATION

5307

$        30,763,964

 

 

$        7,690,991

$         38,454,955

YES, 2011

 

MBTA

SYSTEMS UPGRADES (SYSTEMS

UPGRADES)

5307

$              807,254

 

 

$            201,814

$           1,009,068

YES, 2011

 

 

CATA

CAPE ANN TRANSPORTATION

AUTHORITY

5307

$              514,000

 

$        281,000

 

$              795,000

 

 

 

Preventative Maintenance

5307

$              300,000

 

$           75,000

 

$              375,000

 

 

 

29' Bus Rolling Stock (4)

5307

$              214,000

 

$        206,000

 

$              420,000

 

 

 

Support Equipment

 

$                        -

 

$                    -

 

$                          -

 

 

MWRTA

METROWEST REGIONAL TRANSIT

AUTHORITY

5307

$           1,668,698

 

$        467,175

 

$           2,135,873

 

 

 

Paratransit

5307

$           1,300,000

 

$        325,000

 

$           1,625,000

 

 

 

Equipment and Facilities

5307

$              368,698

 

$           92,175

 

$              460,873

 

 

 

Equipment and Facilities - Call

Center Study

5307

$                        -

 

$           50,000

 

$                50,000

 

 

Transit Operating Total ►

$      422,243,599

 

$        748,175

$ 105,015,226

$      528,007,000

 

 

 

Section 4 / Transit Capital - Section 5309                                                                                                                                                                                                                                                                                                                                                             

MBTA

STATIONS (ACCESSIBILITY) - GOVERNMENT CENTER

5309

$        42,274,867

 

 

$      10,568,717

$        52,843,584

 

 

MBTA

SYSTEMS UPGRADES

5309

$           3,707,035

 

 

$            926,759

$           4,633,794

 

 

MBTA

BRIDGES AND TUNNELS

5309

$        48,000,000

 

 

$      12,000,000

$         60,000,000

 

 

MBTA

REVENUE VEHICLES (74 KAWASAKI

COACHES - OVERHAUL)

5309

$        93,739,299

 

 

$      23,434,825

$      117,174,124

YES, 2012

 

MBTA

SYSTEM UPGRADES

5309

$              242,603

 

 

$              60,651

$              303,254

YES, 2012

 

MBTA

SIGNALS (COLUMBIA JUNCTION -

SIGNAL IMPROVEMENTS)

5309

$        41,600,000

 

 

$      10,400,000

$         52,000,000

YES, 2011

 

MBTA

POWER PROGRAM

5309

$        60,000,000

 

 

$      15,000,000

$         75,000,000

YES, 2009,

2010 & 2011

 

MBTA

FACILITIES (YARDS, SHOPS, PARKING, ETC.) - VARIOUS FACILITIES UPGRADES INCLUDING

EVERETT

5309

$        14,035,441

 

 

$        3,508,860

$         17,544,301

YES, 2011

 

MBTA

SYSTEM UPGRADES

5309

$        17,134,892

 

 

$        4,283,723

$         21,418,615

YES, 2011

 

 

 

BOSTON- COMMONWEALTH AVE/KENMORE SQ. ROADWAY AND PEDESTRIAN IMPROVEMENTS

5309

$           2,708,000

 

 

$            677,000

$           3,385,000

YES, 2011

Earmark transferred from FHWA to FTA, was HPP 682

 

BEVERLY/SALEM INTERMODAL

 

$           1,100,000

 

 

 

$           1,100,000

YES, 2004

Section 115 earmark transferred from FHWA to FTA

 

FERRY - MBTA FERRY SYSTEM

 

$           2,500,000

 

 

$            625,000

$           3,125,000

YES, 2011

 

 

FERRY - MBTA FERRY SYSTEM

 

$           2,500,000

 

 

$            625,000

$           3,125,000

YES, 2012

 

MBTA

SYSTEMWIDE- MERRIMACK RIVER

BRIDGE

TIGER

$        10,000,000

 

 

$        2,500,000

$        12,500,000

 

 

MWRTA

PARATRANSIT CALL CENTER

VTCLI

$           1,025,000

RTA Capital

 

Toll Development Credits

$25,000

 

$231,250

 

$           1,050,000

 

Veterans Transportation Community Living Initiative (VTCLI) grant; Match includes $231,250 (toll credits) and $25,000 (RTACAP)

Transit Capital Total

$      340,567,137

 

$        256,250

$      84,610,535

$      425,202,672

 

 

  1. Section 5 / Job Access Reverse Commute (JARC) - Section 5316 and New Freedom (NF) - Section 5317

MWRTA

JARC Technology Grant

5316

$              464,000

 

$           66,000

 

$              530,000

 

previously awarded

MWRTA

Route 9 Extended Service

5316

$              300,000

 

 

$            262,500

$              562,500

 

$500,000 (Operating),

$62,500 (Capital)

 

North Shore Career Center (NSCC) - Mobility Management and Employment Express Service

5316

$              263,790

 

 

$            202,665

$              466,455

 

$364,580 (Operating),

$101,875 (Capital)

 

Acton - LRTA Road Runner

5317

$                 26,000

 

 

$              26,000

$                52,000

 

Operating

 

Friendship Home - Wheels to Work

5317

$                 25,500

 

 

$              25,500

$                 51,000

 

Operating

 

Greater Lynn Senior Services (GLSS) - Reaching Beyond Borders:

GLSS Mobility Links Project

5317

$              169,764

 

 

$            169,764

$              339,528

 

Operating

MBTA

Paratransit Customers Program

5317

$              115,429

 

 

$              28,857

$              144,286

 

Capital

 

North Shore Career Center (NSCC) - Mobility Management and Employment Express Service

5317

$              263,790

 

 

$            202,665

$              466,455

 

$364,580 (Operating),

$101,875 (Capital)

JARC and NF Total ►

$           1,628,273

 

$           66,000

$            917,951

$           2,612,224

 

 

2013 Boston MPO TIP Summary - Transit

TIP Section 3:

TIP Section 4:

TIP Section 5:

Total of All Projects ▼

 

$      528,007,000

$ 425,433,922

$  2,612,224

$ 956,053,146

◄ Total Spending in Region

$      422,243,599

$ 340,567,137

$  1,628,273

$ 764,439,009

◄ Total Federal Spending in Region

$      105,763,401

$ 84,866,785

$         983,951

$ 191,614,137

◄ Total Non-Federal Spending in Region

 

 

Section 1A / Federal Aid Target Projects                                                                                                                                                                                                                                                                               

 

STP - Surface Transportation Program

600220

BEVERLY- RECONSTRUCTION & SIGNAL IMPROVEMENTS ON RANTOUL STREET (ROUTE 1A) FROM CABOT STREET (SOUTH) TO CABOT STREET (NORTH)

4

STP

$      3,748,818

$      2,999,054

$          749,764

STP+CMAQ Total Cost = $15,748,818

602984

CONCORD- LINCOLN- LIMITED ACCESS HIGHWAY IMPROVEMENTS AT ROUTE 2 & 2A, BETWEEN CROSBY'S CORNER & BEDFORD ROAD, INCLUDES C-19-024

4

STP-AC

$      1,103,037

$          882,430

$          220,607

AC Yr 4 of 4; STP+HSIP+CMAQ Total Cost =

$61,723,980 ($21,757,641 programmed within FFYs 2013-16 TIP)

602602

HANOVER- RECONSTRUCTION OF WASHINGTON STREET (ROUTE 53) AND RELATED WORK FROM THE ROUTE 3 NORTHBOUND RAMP TO WEBSTER STREET (ROUTE 123)

5

STP

$      1,144,000

$          915,200

$          228,800

 

605146

SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE

4

STP

$      4,301,569

$      3,441,255

$          860,314

STP+CMAQ Total Cost = $6,301,569

601630

WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA)

6

STP-AC

$      8,821,534

$      7,057,227

$      1,764,307

AC Yr 2 of 3; STP+ TEA-21 Earmark Total Cost

= $38,340,000

STP Subtotal ►

$ 19,118,958

$ 15,295,166

$      3,823,792

◄ 80% Federal + 20% Non-Federal

NHS - National Highway System

603711

NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04- 021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADD- A-LANE - CONTRACT V)

6

NHS-AC

$ 30,000,000

24,000,000

6,000,000

AC Yr 2 of 5; NHS+BR Total Cost =

$127,500,000 ($120,000,000 programmed within FFYs 2013-16 TIP, AC Yr 5 of 5 will be programmed in FFY 2017)

NHS Subtotal ►

$ 30,000,000

$ 24,000,000

$      6,000,000

◄ 80% Federal + 20% Non-Federal

 

HSIP - Highway Safety Improvement Program

602984

CONCORD- LINCOLN- LIMITED ACCESS HIGHWAY IMPROVEMENTS AT ROUTE 2 & 2A, BETWEEN CROSBY'S CORNER & BEDFORD ROAD, INCLUDES C-19-024

4

HSIP-AC

$      4,296,710

$      3,867,039

$          429,671

AC Yr 4 of 4; STP+HSIP+CMAQ Total Cost =

$61,723,980 ($21,757,641 programmed within FFYs 2013-16 TIP)

HSIP Subtotal ►

$      4,296,710

$      3,867,039

$          429,671

◄ Funding Split Varies by Project Specifications


 

CMAQ - Congestion Mitigation and Air Quality Improvement Program

600220

BEVERLY- RECONSTRUCTION & SIGNAL IMPROVEMENTS ON RANTOUL STREET (ROUTE 1A) FROM CABOT STREET (SOUTH) TO CABOT STREET (NORTH)

4

CMAQ

$ 12,000,000

$      9,600,000

$      2,400,000

STP+CMAQ Total Cost = $15,748,818

604761

BOSTON- MULTI-USE TRAIL CONSTRUCTION (SOUTH BAY HARBOR) FROM RUGGLES STATION TO FAN PIER

6

CMAQ

$      4,146,746

$      3,317,397

$          829,349

Construction

601553

MELROSE- INTERSECTION & SIGNAL IMPROVEMENT TO LEBANON STREET, FROM LYNDE STREET TO MAIN STREET

4

CMAQ

$      3,799,858

$      3,039,886

$          759,972

CMAQ+SAFETEA-LU Earmark Total Cost =

$4,429,788

605729

QUINCY- INTERSECTION & SIGNAL IMPROVEMENTS AT HANCOCK STREET & EAST/WEST SQUANTUM STREETS

6

CMAQ

$      3,371,722

$      2,697,378

$          674,344

 

605146

SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE

4

CMAQ

$      2,000,000

$      1,600,000

$          400,000

STP+CMAQ Total Cost = $6,301,569

N/A

INTERSECTION IMPROVEMENT PROGRAM

N/A

CMAQ

$         350,000

$         280,000

$            70,000

 

456661

CLEAN AIR AND MOBILITY

 

CMAQ

$                    -

$                    -

$                    -

 

CMAQ Subtotal ►

$ 25,668,326

$ 20,534,661

$      5,133,665

◄ 80% Federal + 20% Non-Federal

 

Section 1A / Fiscal Constraint Analysis

Total Federal Aid Target Funds Programmed ►

$ 79,083,994

$ 79,091,696

◄Total Target

$                    7,702

Target Funds Available

Total STP Programmed ►

$ 19,118,958

$ 66,201,565

◄ Max. STP

$          47,082,607

STP Available

Total NHS Programmed

$ 30,000,000

$                    -

◄ Min. NHS

$       (30,000,000)

NHS funds are from STP

Total HSIP Programmed

$      4,296,710

$      4,296,710

◄ Min. HSIP

$                           -

HSIP Minimum Met

Total CMAQ Programmed ►

$ 25,668,326

$      8,593,421

◄ Min. CMAQ

$       (17,074,905)

CMAQ Minimum Met

 

Section 1B / Federal Aid Bridge Projects                                                                                                                                                                                                                                                                              

 

605895

BELLINGHAM- BRIDGE DEMOLITION, B-06-011, ROUTE 126 OVER CSX RAILROAD (ABANDONED) & INSTALLATION OF BIKE PATH CULVERT

3

BR-On

$      1,248,000

$          998,400

$          249,600

 

604462

BOSTON- BRIDGE REPLACEMENT, B-16-209, WEST

SECOND STREET OVER HAUL ROAD & CSX RR

6

BR-On

$      1,316,640

$      1,053,312

$          263,328

 

606449

CAMBRIDGE- BRIDGE PRESERVATION, C-01-008, FIRST STREET BRIDGE & C-01-040, LAND BOULEVARD/BROAD CANAL BRIDGE

6

BR-On

$      3,744,000

$      2,995,200

$          748,800

 

42603

WILMINGTON- BRIDGE REPLACEMENT, W-38-002,

ROUTE 38 (MAIN STREET) OVER THE B&M

4

BR-On

$      4,492,800

$      3,594,240

$          898,560

 

600703

LEXINGTON- BRIDGE REPLACEMENT, L-10-009,

ROUTE 2 (EB & WB) OVER ROUTE I-95 (ROUTE 128)

4

BR-AC

$ 15,000,000

$ 12,000,000

$      3,000,000

AC Yr 2 of 3; Total Cost = $31,800,000

603711

NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04- 021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADD- A-LANE - CONTRACT V)

6

BR-AC

$      8,500,000

$      6,800,000

$      1,700,000

AC Yr 2 of 5; NHS+BR Total Cost =

$127,500,000 ($120,000,000 programmed within FFYs 2013-16 TIP, AC Yr 5 of 5 will be programmed in FFY 2017)

BR Subtotal ►

$ 34,301,440

$ 27,441,152

$      6,860,288

◄ 80% Federal + 20% Non-Federal

 

 

Section 1C / Federal Aid Non-Target Projects                                                                                                                                                                                                                                                                     

Earmarks

601630

WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA)

6

HPP (1998)

$      4,178,466

$      3,342,773

$          835,693

Construction; HPP 1236; AC Yr 2 of 3; STP+TEA-21 Earmark Total Cost =

$38,340,000

604531

ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL

CONSTRUCTION, INCLUDES 4 BRIDGES

3

HPP (2005)

$          769,314

$          615,451

$          153,863

Design; HPP 1761; Local Match

606889

BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS

6

HPP (2005)

$          512,389

$          409,911

$          102,478

Construction; HPP 2012; SAFETEA-LU Earmark + HPP TI 180 Earmark Total Cost =

606134

BOSTON- TRAFFIC SIGNAL IMPROVEMENTS ON

BLUE HILL AVENUE AND WARREN STREET

6

HPP (2005)

$      2,377,900

$      1,902,320

$          475,580

Construction; HPP 2129

605789

BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284)

6

HPP (2005)

$      2,429,730

$      1,943,784

$          485,946

Construction; HPP 756; SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284)

=Total Cost $7,437,105

605789

BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284)

6

HPP (2005)

$      5,007,375

$      4,005,900

$      1,001,475

Construction; HPP 4284; SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105

601553

MELROSE- INTERSECTION & SIGNAL IMPROVEMENT TO LEBANON STREET, FROM LYNDE STREET TO MAIN STREET

4

HPP (2005)

$          629,930

$          503,944

$          125,986

Construction; HPP 1604; CMAQ+SAFETEA-LU Earmark Total Cost = $4,429,788

606889

BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS

6

TI (2005)

$      2,505,854

$      2,004,683

$          501,171

Construction; HPP TI 180; SAFETEA-LU Earmark + HPP TI 180 Earmark Total Cost =

$3,018,243

Earmarks Subtotal ►

$ 18,410,958

$ 14,728,766

$      3,682,192

◄ Funding Split Varies by Earmark


 Other

 

No Projects Programmed

 

 

$                    -

$                      -

$                      -

 

Other Subtotal ►

$                    -

$                    -

$                    -

◄ Funding Split Varies by Funding Source

Section 1D / Federal Aid Major & State Category Projects                                                                                                                                                                                                                                               

IM - Interstate Maintenance

606171

SHARON- WALPOLE - INTERSTATE MAINTENANCE

& RELATED WORK ON I-95

5

IM

$ 10,308,480

$      9,277,632

$      1,030,848

 

IM Subtotal ►

$ 10,308,480

$      9,277,632

$      1,030,848

◄ 90% Federal + 10% Non-Federal

NHSPP - National Highway System Preservation Program

N/A

WEYMOUTH- BRAINTREE- QUINCY -

RESURFACING & RELATED WORK ON ROUTE 3

6

NHS

$      9,817,600

$      7,854,080

$      1,963,520

 

NHS Subtotal ►

$      9,817,600

$      7,854,080

$      1,963,520

◄ 80% Federal + 20% Non-Federal

SRTS - Safe Routes to School Program

N/A

MALDEN- SAFE ROUTES TO SCHOOL (BEEBE

SCHOOL)

4

SRTS

$          480,480

$          480,480

$                    -

 

N/A

MANCHESTER- SAFE ROUTES TO SCHOOL

(MEMORIAL ELEMENTARY)

4

SRTS

$          505,440

$          505,440

$                    -

 

N/A

MILTON- SAFE ROUTES TO SCHOOL (GLOVER

ELEMENTARY SCHOOL)

4

SRTS

$          624,520

$          624,520

$                    -

 

N/A

WESTWOOD- SAFE ROUTES TO SCHOOL

(DOWNEY ELEMENTARY)

6

SRTS

$          569,920

$          569,920

$                    -

 

SRTS Subtotal

$      2,180,360

$      2,180,360

$                    -

◄ 100% Federal


Statewide Infrastructure Program

603917

STONEHAM- WOBURN- LIGHTING UPGRADES ON I- 93

4

Statewide Infrastructure Program

$      1,100,000

$          880,000

$          220,000

 

Statewide Infrastructure Subtotal ►

$      1,100,000

$          880,000

$          220,000

◄ 80% Federal + 20% Non-Federal

 

Statewide CMAQ - Statewide Congestion Mitigation and Air Quality Program

603462

DUXBURY- INTERSECTION IMPROVEMENTS AT

KINGSTOWN WAY (ROUTE 53) & WINTER STREET

5

CMAQ

$      1,141,606

$          913,285

$          228,321

 

601019

WINCHESTER- SIGNAL & INTERSECTION IMPROVEMENTS AT 4 LOCATIONS ON CHURCH STREET & ROUTE 3 (CAMBRIDGE ST)

4

CMAQ

$      4,145,339

$      3,316,271

$          829,068

 

Statewide CMAQ Subtotal ►

$      5,286,945

$      4,229,556

$      1,057,389

◄ 80% Federal + 20% Non-Federal

 

Statewide TE - Statewide Transportation Enhancement Program

604532

ACTON- CARLISLE- WESTFORD- BRUCE FREEMAN

RAIL TRAIL (PHASE II-A)

3

Statewide TE

$      8,788,000

$      7,030,400

$      1,757,600

 

Statewide TE Subtotal ►

$      8,788,000

$      7,030,400

$      1,757,600

◄ 80% Federal + 20% Non-Federal

Other

N/A

CENTRAL ARTERY/TUNNEL PROJECT- NATIONAL

HIGHWAY SYSTEM

N/A

Other

$ 44,450,000

$                      -

$                      -

 

N/A

CENTRAL ARTERY/TUNNEL PROJECT- STATE

TRANSPORTATION PROGRAM/FLEX

N/A

Other

$ 58,390,000

$                      -

$                      -

 

N/A

CENTRAL ARTERY/TUNNEL PROJECT- STATE

TRANSPORTATION PROGRAM

N/A

Other

$ 20,000,000

$                      -

$                      -

Last year of GANs payments for CA/T

Other Subtotal ►

$ 122,840,000

$                    -

$                    -

◄ Funding Split Varies by Funding Source

 

Section 2A / Non-Federal Projects                                                                                                                                                                                                                                                                                          

N/A

GREEN LINE EXTENSION PROJECT- EXTENSION

N/A

Other

$ 94,900,000

$ 94,900,000

The Green Line Extension project is currently in

 

TO COLLEGE AVENUE WITH THE UNION SQUARE

 

 

 

 

the New Starts pipeline and the Commonwealth

 

SPUR

 

 

 

 

anticipates a decision in a Full Funding Grant

 

 

 

 

 

 

Agreement in FFY 2015. The cash flows for the

 

 

 

 

 

 

project, therefore, provide 100% bond funding

 

 

 

 

 

 

for FFY 2013-14 and begin programming New

 

 

 

 

 

 

Starts funding in FFY 2015. The

 

 

 

 

 

 

Commonwealth is committed to fully funding

 

 

 

 

 

 

this project with bond funds if New Starts is not

 

 

 

 

 

 

awarded.

N/A

FAIRMOUNT IMPROVEMENTS

N/A

Other

$ 11,155,536

$ 11,155,536

Lists cash flows (based on state fiscal year) for

 

 

 

 

 

 

Fairmount Improvements

N/A

RED LINE-BLUE LINE CONNECTOR DESIGN

N/A

Other

$ 29,000,000

$ 29,000,000

MassDOT made a formal request on Aug. 1,

 

 

 

 

 

 

2011, to remove this project from the State

 

 

 

 

 

 

Implementation Plan regulation. The MPO is

 

 

 

 

 

 

continuing to reference this project in the

 

 

 

 

 

 

document until the process is complete.

Non-Federal Projects Subtotal►

$ 135,055,536

$ 135,055,536

◄100% Non-Federal

 

 

Section 2B / Non-Federal Bridge Projects                                                                                                                                                                                                                                                                            

 

 

No Projects Programmed

 

 

$                    -

$                    -

 

Non-Federal Bridge Projects Subtotal►

$                    -

$                    -

◄100% Non-Federal

 

2014 Boston MPO TIP Summary - Highway

TIP Section 1:

TIP Section 2:

Total of All Projects ▼

Total ►

Federal Funds ►

Non-Federal Funds

$ 169,277,777

$                    -

$ 169,277,777

◄ Total Spending in Region

◄ Total Federal Spending in Region

◄ Total Non-Federal Spending in Region

$ 137,318,812

$ 137,318,812

$ 31,958,965

$                    -

$ 31,958,965


701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx

 

 

  1. Section 3 / Transit Operating - Section 5307                                                                                                                                                                                                                                                                                                                                                             

 

MBTA

REVENUE VEHICLES (OTHER

VEHICLE PROGRAMS)

5307

$           35,000,000

 

 

$        8,750,000

$       43,750,000

 

 

MBTA

SYSTEMS UPGRADES

5307

$             6,012,172

 

 

$        1,503,043

$         7,515,215

 

 

MBTA

FACILITIES (YARDS, SHOPS, PARKING, ETC.) - PARKING SYSTEMS IMPROVEMENTS

5307

$           20,000,000

 

 

$        5,000,000

$       25,000,000

 

 

MBTA

BRIDGES & TUNNELS

5307

$           60,000,000

 

 

$      15,000,000

$       75,000,000

 

 

MBTA

PREVENTATIVE MAINTENANCE

5307

$           12,000,000

 

 

$        3,000,000

$       15,000,000

 

 

CATA

CAPE ANN TRANSPORTATION AUTHORITY

5307

$                 515,114

 

$         281,000

 

$             796,114

 

 

 

Preventative Maintenance

5307

$                 300,000

 

$           75,000

 

$             375,000

 

 

 

29' Bus Rolling Stock (4)

5307

$                   55,114

 

$         166,000

 

$             221,114

 

 

 

Gas Storage Tank

5307

$                 160,000

 

$           40,000

 

$             200,000

 

 

MWRTA

METROWEST REGIONAL TRANSIT

AUTHORITY

5307

$             1,668,698

 

$         417,175

 

$         2,085,873

 

 

 

ADA Paratransit

5307

$             1,103,398

 

$         275,850

 

$         1,379,248

 

 

 

Equipment and Facilities

5307

$                 565,300

 

$         141,325

 

$             706,625

 

 

Transit Operating Total

$        135,195,984

 

$         698,175

$      33,253,043

$  169,147,202

 

 

 

Section 4 / Transit Capital - Section 5309                                                                                                                                                                                                                                                                                                                                                             

 

MBTA

REVENUE VEHICLES (RED AND ORANGE LINE - NEW VEHICLE PROCUREMENT)

5309

$           72,000,000

 

 

$      18,000,000

$       90,000,000

 

 

MBTA

SYSTEMS UPGRADES

5309

$           21,981,902

 

 

$        5,495,476

$       27,477,378

 

 

Transit Capital Total ►

$           93,981,902

 

$                    -

$      23,495,476

$  117,477,378

 


 

Section 5 / Job Access Reverse Commute (JARC) - Section 5316 and New Freedom (NF) - Section 5317

MWRTA

JARC Communications

5316

$                 258,700

 

$           64,675

 

$             323,375

 

previously awarded

MWRTA

Route 9 Extended Service

5316

$                 300,000

 

 

$            262,500

$             562,500

 

$500,000 (Operating),

$62,500 (Capital)

 

Friendship Home - Wheels to Work

5317

$                   26,350

 

 

$              26,350

$               52,700

 

Operating

MBTA

Paratransit Customers Program

5317

$                 131,942

 

 

$              32,986

$             164,928

 

Capital

JARC and NF Total ►

$                 716,992

 

$           64,675

$            321,836

$         1,103,503

 

 

2014 Boston MPO TIP Summary - Transit

TIP Section 3:

TIP Section 4:

TIP Section 5:

Total of All Projects ▼

 

$        169,147,202

$117,477,378

$  1,103,503

$ 287,728,083

Total Spending in Region

$        135,195,984

$ 93,981,902

$         716,992

$ 229,894,878

◄ Total Federal Spending in Region

$           33,951,218

$ 23,495,476

$         386,511

$      57,833,205

◄ Total Non-Federal Spending in Region

 

Section 1A / Federal Aid Target Projects                                                                                                                                                                                                                                                                               

STP - Surface Transportation Program

606284

BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET

6

STP

$      7,446,852

$      5,957,482

$      1,489,370

STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost =

$16,866,250

601630

WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA)

6

STP-AC

$ 11,406,086

$      9,124,869

$      2,281,217

AC Yr 3 of 3; STP+ TEA-21 Earmark Total Cost

= $38,340,000

STP Subtotal

$ 18,852,938

$ 15,082,350

$      3,770,588

◄ 80% Federal + 20% Non-Federal

 

NHS - National Highway System

603711

NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04- 021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADD- A-LANE - CONTRACT V)

6

NHS-AC

$ 30,000,000

$ 24,000,000

$      6,000,000

AC Yr 3 of 5; NHS+BR Total Cost =

$127,500,000 ($120,000,000 programmed within FFYs 2013-16 TIP, AC Yr 5 of 5 will be programmed in FFY 2017)

NHS Subtotal ►

$ 30,000,000

$ 24,000,000

$      6,000,000

◄ 80% Federal + 20% Non-Federal

HSIP - Highway Safety Improvement Program

 

No Projects Programmed

 

 

$                    -

$                    -

$                    -

 

HSIP Subtotal ►

$                    -

$                    -

$                    -

◄ Funding Split Varies by Project Specifications

 

CMAQ - Congestion Mitigation and Air Quality Improvement Program

606284

BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET

6

CMAQ

$      5,000,000

$      4,000,000

$      1,000,000

STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost =

$16,866,250

604652

STONEHAM- WINCHESTER- WOBURN- TRI-

COMMUNITY BIKEWAY

4

CMAQ

$      5,429,110

$      4,343,288

$      1,085,822

 

456661

CLEAN AIR AND MOBILITY

 

CMAQ

$                    -

$                    -

$                    -

 

CMAQ Subtotal ►

$ 10,429,110

$      8,343,288

$      2,085,822

◄ 80% Federal + 20% Non-Federal


 

Section 1A / Fiscal Constraint Analysis

Total Federal Aid Target Funds Programmed ►

$ 59,282,048

$ 59,316,086

◄Total Target

$                  34,038

Target Funds Available

Total STP Programmed

$ 18,852,938

$ 46,425,955

◄ Max. STP

$          27,573,017

STP Available

Total NHS Programmed

$ 30,000,000

$                    -

◄ Min. NHS

$       (30,000,000)

NHS funds are from STP

Total HSIP Programmed

$                    -

$      4,296,710

◄ Min. HSIP

$            4,296,710

HSIP Minimum Not Met

Total CMAQ Programmed ►

$ 10,429,110

$      8,593,421

◄ Min. CMAQ

$         (1,835,689)

CMAQ Minimum Met

 

Section 1B / Federal Aid Bridge Projects                                                                                                                                                                                                                                                                              

604428

CHELSEA- BRIDGE REPLACEMENT, C-09-001, WASHINGTON AVENUE OVER THE MBTA AND B&M RAILROAD

6

BR-On

$      3,862,080

$      3,089,664

$          772,416

 

606632

HOPKINTON- WESTBOROUGH- BRIDGE REPLACEMENT, H-23-006=W-24-016, FRUIT STREET OVER CSX & SUDBURY RIVER

3

BR-On

$      8,270,478

$      6,616,382

$      1,654,096

 

607119

IPSWICH- BRIDGE REPAIRS, GREEN STREET OVER

THE IPSWICH RIVER

4

BR-Off

$      1,398,384

$      1,118,707

$          279,677

 

604655

MARSHFIELD- BRIDGE REPLACEMENT, M-07-007,

BEACH STREET OVER THE CUT RIVER

5

BR-Off

$      2,423,004

$      1,938,403

$          484,601

 

600867

BOSTON- BRIDGE REPLACEMENT, B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE

6

BR-AC

$      2,916,000

$      2,332,800

$          583,200

AC Yr 1 of 4; Total Cost = $23,117,239 ($11,916,000 programmed within FFYs 2013- 16 TIP)

600703

LEXINGTON- BRIDGE REPLACEMENT, L-10-009,

ROUTE 2 (EB & WB) OVER ROUTE I-95 (ROUTE 128)

4

BR-AC

$ 15,000,000

$ 12,000,000

$      3,000,000

AC Yr 3 of 3; Total Cost = $31,800,000

603722

LEXINGTON- BRIDGE REPLACEMENT, L-10-010, ROUTE 2A (MARRETT ROAD) OVER I-95/ROUTE 128

4

BR-AC

$      1,572,762

$      1,258,210

$          314,552

AC Yr 1 of 3; Total Cost = $22,117,239 ($11,572,762 programmed within FFYs 2013- 16 TIP)

BR Subtotal ►

$ 35,442,708

$ 28,354,166

$      7,088,542

◄ 80% Federal + 20% Non-Federal


Section 1C / Federal Aid Non-Target Projects                                                                                                                                                                                                                                                                     

Earmarks

601630

WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA)

6

HPP (1998)

$      2,593,914

$      2,075,131

$          518,783

Construction; HPP 1236; AC Yr 3 of 3; STP+TEA-21 Earmark Total Cost =

$38,340,000

606284

BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET

6

HPP (2005)

$      1,114,501

$          891,601

$          222,900

Construction; HPP 682; STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP,

TCSP) Total Cost = $16,866,250

606284

BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET

6

§ 129 (2008)

$          980,000

$          980,000

$                    -

Construction; Section 129; STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost =

$16,866,250

606284

BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET

6

§ 125 (2009)

$          475,000

$          475,000

$                    -

Construction; Section 125; STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost =

$16,866,250

606284

BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET

6

STPP (2010)

$          599,897

$          599,897

$                    -

Construction; STPP; STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP,

TCSP) Total Cost = $16,866,250

606284

BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET

6

TCSP

$      1,250,000

$      1,000,000

$          250,000

Construction; TCSP; STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP,

TCSP) Total Cost = $16,866,250

Earmarks Subtotal ►

$      7,013,312

$      6,021,629

$          991,683

◄ Funding Split Varies by Earmark

Other

 

No Projects Programmed

 

 

$                    -

$                      -

$                      -

 

Other Subtotal ►

$                    -

$                    -

$                    -

◄ Funding Split Varies by Funding Source

 

Section 1D / Federal Aid Major & State Category Projects                                                                                                                                                                                                                                               

IM - Interstate Maintenance

 

No Projects Programmed

 

 

$                    -

$                      -

$                      -

 

IM Subtotal ►

$                    -

$                    -

$                    -

◄ 90% Federal + 10% Non-Federal

NHSPP - National Highway System Preservation Program

N/A

CHELSEA- REVERE- RESURFACING & RELATED

WORK ON ROUTE 1

6

NHS

$      7,455,240

$      5,964,192

$      1,491,048

 

NHS Subtotal ►

$      7,455,240

$      5,964,192

$      1,491,048

◄ 80% Federal + 20% Non-Federal

 

 

SRTS - Safe Routes to School Program

N/A

SAUGUS- SAFE ROUTES TO SCHOOL (VETERANS

MEMORIAL)

4

SRTS

$          432,000

$          432,000

$                    -

 

N/A

SOMERVILLE- SAFE ROUTES TO SCHOOL (HEALEY

SCHOOL)

4

SRTS

$          768,960

$          768,960

$                    -

 

SRTS Subtotal

$      1,200,960

$      1,200,960

$                    -

◄ 100% Federal

 

 

Statewide Infrastructure Program

603917

STONEHAM- WOBURN- LIGHTING UPGRADES ON I- 93

4

Statewide Infrastructure Program

$      5,400,000

$      4,320,000

$      1,080,000

 

605733

BOSTON- HIGHWAY LIGHTING SYSTEM REPLACEMENT ON I-93, FROM SOUTHAMPTON STREET TO NEPONSET AVENUE

6

Statewide Infrastructure Program

$          600,000

$          480,000

$          120,000

 

Statewide Infrastructure Subtotal ►

$      6,000,000

$      4,800,000

$      1,200,000

◄ 80% Federal + 20% Non-Federal

 

 

Statewide ITS - Statewide Intelligent Transportation Systems Program

606930

BRAINTREE- QUINCY- MILTON- BOSTON- HOV

LANE TOW TRUCK SERVICES

6

Statewide

ITS

$          200,000

$          160,000

$            40,000

 

606931

BRAINTREE- QUINCY- MILTON- BOSTON- HOV LANE BARRIER TRANSFER VEHICLE (BTV) OPERATOR CONTRACT

6

Statewide ITS

$          200,000

$          160,000

$            40,000

 

606932

BRAINTREE- QUINCY- MILTON- BOSTON- HOV

LANE OPERATING EXPENSES

6

Statewide

ITS

$          200,000

$          160,000

$            40,000

 

Statewide ITS Subtotal ►

$          600,000

$          480,000

$          120,000

◄ 80% Federal + 20% Non-Federal

 

Other

N/A

ACCELERATED BRIDGE PROGRAM- BRIDGE

N/A

Other

$ 150,000,000

$                    -

$                    -

First year of GANS payments for ABP

Other Subtotal ►

$ 150,000,000

$                    -

$                    -

◄ Funding Split Varies by Funding Source


Section 2A / Non-Federal Projects                                                                                                                                                                                                                                                                                          

N/A

GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR

N/A

Other

$ 235,800,000

$ 135,800,000

The Green Line Extension project is currently in the New Starts pipeline and the Commonwealth anticipates a decision in a Full Funding Grant Agreement in FFY 2015. The cash flows for the project, therefore, provide 100% bond funding for FFY 2013-14 and begin programming New Starts funding of $100,000,000 in FFY 2015 and $100,000,000 in FFY 2016. The

Commonwealth is committed to fully funding this project with bond funds if New Starts is not

awarded.

N/A

FAIRMOUNT IMPROVEMENTS

N/A

Other

$      6,922,845

$      6,922,845

Lists cash flows (based on state fiscal year) for Fairmount Improvements

N/A

RED LINE-BLUE LINE CONNECTOR DESIGN

N/A

Other

$ 10,000,000

$ 10,000,000

MassDOT made a formal request on Aug. 1, 2011, to remove this project from the State Implementation Plan regulation. The MPO is continuing to reference this project in the document until the process is complete.

Non-Federal Projects Subtotal►

$ 252,722,845

$ 152,722,845

◄100% Non-Federal

 

Section 2B / Non-Federal Bridge Projects                                                                                                                                                                                                                                                                            

 

 

No Projects Programmed

 

 

$                    -

$                    -

 

Non-Federal Bridge Projects Subtotal►

$                    -

$                    -

◄100% Non-Federal

 

2015 Boston MPO TIP Summary - Highway

TIP Section 1:

TIP Section 2:

Total of All Projects ▼

Total ►

$ 116,994,268

$                    -

$ 116,994,268

◄ Total Spending in Region

Federal Funds ►

$ 94,246,586

$ 94,246,586

◄ Total Federal Spending in Region

Non-Federal Funds ►

$ 22,747,682

$                    -

$ 22,747,682

◄ Total Non-Federal Spending in Region


701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx


2015 Boston MPO Transportation Improvement Program                                                                      Amendment Three to the FFYs 2013-2016 TIP

Regional Transit Authority

Project Description

Federal Funds Source

Federal Amount

State Funds Source

State Amount ▼

RTA

Funds

Total Cost

Carryover and Year

Additional Information

Section 3 / Transit Operating - Section 5307                                                                                                                                                                                                                                                                                                                                                               

 

MBTA

REVENUE VEHICLES (OTHER

VEHICLE PROGRAMS)

5307

$        55,000,000

 

 

$        13,750,000

$      68,750,000

 

 

MBTA

SYSTEMS UPGRADES

5307

$           6,012,172

 

 

$          1,503,043

$        7,515,215

 

 

MBTA

BRIDGES & TUNNELS

5307

$        60,000,000

 

 

$        15,000,000

$      75,000,000

 

 

MBTA

PREVENTATIVE MAINTENANCE

5307

$        12,000,000

 

 

$          3,000,000

$      15,000,000

 

 

CATA

CAPE ANN TRANSPORTATION

AUTHORITY

5307

$              515,114

 

$          281,000

 

$            796,114

 

 

 

Preventative Maintenance

5307

$              300,000

 

$            75,000

 

$            375,000

 

 

 

29' Bus Rolling Stock (2)

5307

$                 55,114

 

$          166,000

 

$            221,114

 

 

 

Support Equipment

5307

$                 80,000

 

$            20,000

 

$            100,000

 

 

 

Facility Maintenance

5307

$                 80,000

 

$            20,000

 

$            100,000

 

 

MWRTA

METROWEST REGIONAL TRANSIT

AUTHORITY

5307

$           1,668,698

 

$          417,175

 

$        2,085,873

 

 

 

ADA Paratransit

5307

$           1,300,000

 

$          325,000

 

$        1,625,000

 

 

 

Equipment and Facilities

5307

$              368,698

 

$            92,175

 

$            460,873

 

 

Transit Operating Total ►

$      135,195,984

 

$          698,175

$        33,253,043

$ 169,147,202

 

 

 

Section 4 / Transit Capital - Section 5309                                                                                                                                                                                                                                                                                                                                                               

MBTA

REVENUE VEHICLES- RED AND ORANGE LINE- NEW VEHICLE PROCUREMENT

5309

$        58,000,000

 

 

$        14,500,000

$      72,500,000

 

 

MBTA

SYSTEM UPGRADES

5309

$        35,981,902

 

 

$          8,995,476

$      44,977,378

 

 

Transit Capital Total ►

$        93,981,902

 

$                     -

$        23,495,476

$ 117,477,378

 

 

Section 5 / Job Access Reverse Commute (JARC) - Section 5316 and New Freedom (NF) - Section 5317                                                                                                                                                                                                                                                                                                                                                               

 

Friendship Home - Wheels to Work

5317

$                26,250

 

 

$                 26,250

$              52,500

 

Operating

JARC and NF Total ►

$                26,250

 

$                     -

$                 26,250

$              52,500

 

 

2015 Boston MPO TIP Summary - Transit

TIP Section 3:

TIP Section 4:

TIP Section 5:

Total of All Projects ▼

 

$      169,147,202

$117,477,378

$            52,500

$      286,677,080

◄ Total Spending in Region

$      135,195,984

$ 93,981,902

$            26,250

$      229,204,136

◄ Total Federal Spending in Region

$        33,951,218

$ 23,495,476

$            26,250

$        57,472,944

◄ Total Non-Federal Spending in Region

 

Section 1A / Federal Aid Target Projects                                                                                                                                                                                                                                                                               

STP - Surface Transportation Program

29492

BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III)

4

STP

$ 20,147,443

$ 16,117,954

$      4,029,489

STP+ Northern Middlesex Council of Governments contribution ($1,000,000) Total Cost = $21,147,443

604810

MARLBOROUGH- RECONSTRUCTION OF ROUTE 85

(MAPLE STREET)

3

STP

$      3,397,727

$      2,718,182

$          679,545

STP+ CMAQ Total Cost = $5,397,727

605657

MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012

3

STP

$      6,234,839

$      4,987,871

$      1,246,968

STP+ CMAQ Total Cost = $11,234,839

STP Subtotal

$ 29,780,009

$ 23,824,007

$      5,956,002

80% Federal + 20% Non-Federal

 

NHS - National Highway System

603711

NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04- 021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADD- A-LANE - CONTRACT V)

6

NHS-AC

$ 23,500,000

18,800,000

4,700,000

AC Yr 4 of 5; NHS+BR Total Cost =

$127,500,000 ($120,000,000 programmed within FFYs 2013-16 TIP, AC Yr 5 of 5 will be programmed in FFY 2017)

NHS Subtotal ►

$ 23,500,000

$ 18,800,000

$      4,700,000

◄ 80% Federal + 20% Non-Federal

 

HSIP - Highway Safety Improvement Program

 

No Projects Programmed

 

 

$                    -

$                    -

$                    -

 

HSIP Subtotal ►

$                    -

$                    -

$                    -

◄ Funding Split Varies by Project Specifications

 

CMAQ - Congestion Mitigation and Air Quality Improvement Program

605110

BROOKLINE- INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 9 & VILLAGE SQUARE (GATEWAY EAST)

6

CMAQ

$      4,591,009

$      3,672,807

$          918,202

CMAQ+ Private Sector Contribution ($1,000,000) Total Cost = $5,591,009

604810

MARLBOROUGH- RECONSTRUCTION OF ROUTE 85

(MAPLE STREET)

3

CMAQ

$      2,000,000

$      1,600,000

$          400,000

STP+ CMAQ Total Cost = $5,397,727

605657

MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012

3

CMAQ

$      5,000,000

$      4,000,000

$      1,000,000

STP+ CMAQ Total Cost = $11,234,839

 

GREEN LINE EXTENSION PROJECT (PHASE II), MEDFORD HILLSIDE (COLLEGE AVENUE) TO MYSTIC VALLEY PARKWAY/ROUTE 16

 

CMAQ

$      8,100,000

$       6,480,000

$      1,620,000

Total Cost = $190,100,000 ($8,100,000

programmed with FFYs 2013-16 TIP)

456661

CLEAN AIR AND MOBILITY

 

CMAQ

$      3,000,000

$      2,400,000

$          600,000

 

 

No Projects Programmed

 

 

$                    -

$                    -

$                    -

 

CMAQ Subtotal ►

$ 22,691,009

$ 18,152,807

$      4,538,202

◄ 80% Federal + 20% Non-Federal


 

Section 1A / Fiscal Constraint Analysis

Total Federal Aid Target Funds Programmed ►

$ 75,971,018

$ 76,083,999

◄Total Target

$               112,981

Target Funds Available

Total STP Programmed

$ 29,780,009

$ 63,193,868

◄ Max. STP

$          33,413,859

STP Available

Total NHS Programmed

$ 23,500,000

$                    -

◄ Min. NHS

$       (23,500,000)

NHS funds are from STP

Total HSIP Programmed

$                    -

$      4,296,710

◄ Min. HSIP

$            4,296,710

HSIP Minimum Not Met

Total CMAQ Programmed ►

$ 22,691,009

$      8,593,421

◄ Min. CMAQ

$       (14,097,588)

CMAQ Minimum Met

Section 1B / Federal Aid Bridge Projects                                                                                                                                                                                                                                                                              

 

607132

QUINCY- BRIDGE REPLACEMENT, STEDMAN

STREET OVER I-93/US 1/SR 3

6

BR-Off

$      3,081,792

$      2,465,434

$          616,358

 

607133

QUINCY- BRIDGE REPLACEMENT, ROBERTSON

STREET OVER I-93/US 1/SR 3

6

BR-Off

$      3,454,080

$      2,763,264

$          690,816

 

604173

BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE

CHARLES RIVER

6

BR-AC

$      2,600,000

$      2,080,000

$          520,000

AC Yr 1; Total Cost = $52,999,912 ($2,600,000

programmed within FFYs 2013-16 TIP)

600867

BOSTON- BRIDGE REPLACEMENT, B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE

6

BR-AC

$      9,000,000

$      7,200,000

$      1,800,000

AC Yr 2 of 4; Total Cost = $23,117,239 ($11,916,000 programmed within FFYs 2013- 16 TIP)

603722

LEXINGTON- BRIDGE REPLACEMENT, L-10-010, ROUTE 2A (MARRETT ROAD) OVER I-95/ROUTE 128

4

BR-AC

$ 10,000,000

$      8,000,000

$      2,000,000

AC Yr 2 of 3; Total Cost = $22,117,239 ($11,572,762 programmed within FFYs 2013- 16 TIP)

BR Subtotal ►

$ 28,135,872

$ 22,508,698

$      5,627,174

◄ 80% Federal + 20% Non-Federal

 

Section 1C / Federal Aid Non-Target Projects                                                                                                                                                                                                                                                                     

Earmarks

 

No Projects Programmed

 

 

$                    -

$                    -

$                    -

 

Earmarks Subtotal ►

$                    -

$                    -

$                    -

◄ Funding Split Varies by Earmark

Other

 

No Projects Programmed

 

 

$                    -

$                    -

$                    -

 

Other Subtotal ►

$                    -

$                    -

$                    -

◄ Funding Split Varies by Funding Source


Section 1D / Federal Aid Major & State Category Projects                                                                                                                                                                                                                                               

IM - Interstate Maintenance

606176

FOXBOROUGH- PLAINVILLE- WRENTHAM- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 (NB & SB)

5

IM

$ 12,475,904

$ 11,228,314

$      1,247,590

 

606546

FRANKLIN- INTERSTATE MAINTENANCE &

RELATED WORK ON I-495

3

IM

$ 10,149,888

$      9,134,899

$      1,014,989

 

IM Subtotal ►

$ 22,625,792

$ 20,363,213

$      2,262,579

◄ 90% Federal + 10% Non-Federal

 

NHSPP - National Highway System Preservation Program

 

No Projects Programmed

 

 

$                    -

$                    -

$                    -

 

NHS Subtotal ►

$                    -

$                    -

$                    -

◄ 80% Federal + 20% Non-Federal

SRTS - Safe Routes to School Program

 

No Projects Programmed

 

 

$                    -

$                    -

$                    -

 

SRTS Subtotal

$                    -

$                    -

$                    -

◄ 100% Federal

Statewide Infrastructure Program

603917

STONEHAM- WOBURN- LIGHTING UPGRADES ON I- 93

4

Statewide Infrastructure Program

$      3,600,000

$      2,880,000

$          720,000

 

605733

BOSTON- HIGHWAY LIGHTING SYSTEM REPLACEMENT ON I-93, FROM SOUTHAMPTON STREET TO NEPONSET AVENUE

6

Statewide Infrastructure Program

$      1,350,000

$      1,080,000

$          270,000

 

Statewide Infrastructure Subtotal ►

$      4,950,000

$      3,960,000

$          990,000

◄ 80% Federal + 20% Non-Federal

Statewide CMAQ - Statewide Congestion Mitigation and Air Quality Program

601579

WAYLAND- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 27 (MAIN STREET) AND ROUTE 30 (COMMONWEALTH ROAD)

3

CMAQ

$      2,053,972

$      1,643,178

$          410,794

 

602165

STONEHAM- SIGNAL & INTERSECTION

IMPROVEMENTS AT ROUTE 28/NORTH STREET

4

CMAQ

$      3,519,779

$      2,815,823

$          703,956

 

602462

HOLLISTON- SIGNAL INSTALLATION AT ROUTE

16/126 AND OAK STREET

3

CMAQ

$      1,120,000

$          896,000

$          224,000

 

Statewide CMAQ Subtotal ►

$      6,693,751

$      5,355,001

$      1,338,750

◄ 80% Federal + 20% Non-Federal

Statewide ITS - Statewide Intelligent Transportation Systems Program

606930

BRAINTREE- QUINCY- MILTON- BOSTON- HOV

LANE TOW TRUCK SERVICES

6

Statewide

ITS

$          350,000

$          280,000

$            70,000

 

606931

BRAINTREE- QUINCY- MILTON- BOSTON- HOV LANE BARRIER TRANSFER VEHICLE (BTV) OPERATOR CONTRACT

6

Statewide ITS

$          800,000

$          640,000

$          160,000

 

606932

BRAINTREE- QUINCY- MILTON- BOSTON- HOV

LANE OPERATING EXPENSES

6

Statewide

ITS

$          200,000

$          160,000

$            40,000

 

Statewide ITS Subtotal

$      1,350,000

$      1,080,000

$          270,000

80% Federal + 20% Non-Federal

 

Other

N/A

ACCELERATED BRIDGE PROGRAM- BRIDGE

N/A

Other

$ 150,000,000

$                      -

$                      -

Year 2 of 8 of GANS payments for ABP

Other Subtotal ►

$ 150,000,000

$                      -

$                      -

◄ Funding Split Varies by Funding Source

Section 2A / Non-Federal Projects                                                                                                                                                                                                                                                                                          

 

N/A

GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR

N/A

Other

$ 302,000,000

$ 202,000,000

The Green Line Extension project is currently in the New Starts pipeline and the Commonwealth anticipates a decision in a Full Funding Grant Agreement in FFY 2015. The cash flows for the project, therefore, provide 100% bond funding for FFY 2013-14 and begin programming New Starts funding of $100,000,000 in FFY 2015 and $100,000,000 in FFY 2016. The

Commonwealth is committed to fully funding this project with bond funds if New Starts is not

awarded.

Non-Federal Projects Subtotal►

$ 302,000,000

$ 202,000,000

◄100% Non-Federal

 

Section 2B / Non-Federal Bridge Projects                                                                                                                                                                                                                                                                            

 

No Projects Programmed

 

 

$                    -

$                    -

 

Non-Federal Bridge Projects Subtotal►

$                    -

$                    -

◄100% Non-Federal


 

2016 Boston MPO TIP Summary - Highway

TIP Section 1:

TIP Section 2:

Total of All Projects ▼

Total ►

Federal Funds ►

Non-Federal Funds ►

$ 139,726,433

$                    -

$ 139,726,433

◄ Total Spending in Region

◄ Total Federal Spending in Region

◄ Total Non-Federal Spending in Region

$ 114,043,726

$ 114,043,726

$ 25,682,707

$                    -

$ 25,682,707


701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx


2016 Boston MPO Transportation Improvement Program                                                                      Amendment Three to the FFYs 2013-2016 TIP

Regional Transit Authority

Project Description

Federal Funds Source

Federal Amount

State Funds Source

State Amount ▼

RTA

Funds

Total Cost

Carryover and Year

Additional Information

 

Section 3 / Transit Operating - Section 5307                                                                                                                                                                                                                                                                                                                                                               

 

MBTA

REVENUE VEHICLES (OTHER

VEHICLE PROGRAMS)

5307

$        60,000,000

 

 

$        15,000,000

$      75,000,000

 

 

MBTA

SYSTEMS UPGRADES

5307

$        11,012,172

 

 

$          2,753,043

$      13,765,215

 

 

MBTA

TRACK/RIGHT-OF-WAY

5307

$        25,000,000

 

 

$          6,250,000

$      31,250,000

 

 

MBTA

FACILITIES (YARDS, SHOPS,

PARKING, ETC.)

5307

$        25,000,000

 

 

$          6,250,000

$      31,250,000

 

 

MBTA

PREVENTATIVE MAINTENANCE

5307

$        12,000,000

 

 

$          3,000,000

$      15,000,000

 

 

CATA

CAPE ANN TRANSPORTATION

AUTHORITY

5307

$              173,000

 

$          301,000

 

$            474,000

 

 

 

Preventative Maintenance

5307

$                 38,000

 

$            95,000

 

$            133,000

 

 

 

29' Bus Rolling Stock (2)

5307

$              135,000

 

$            95,000

 

$            230,000

 

 

 

Security Equipment

5307

$                        -

 

$          111,000

 

$            111,000

 

 

MWRTA

METROWEST REGIONAL TRANSIT

AUTHORITY

5307

$          1,668,698

 

$          417,175

 

$        2,085,873

 

 

 

ADA Paratransit

5307

$          1,300,000

 

$          325,000

 

$        1,625,000

 

 

 

Equipment and Facilities

5307

$              368,698

 

$            92,175

 

$            460,873

 

 

Transit Operating Total ►

$      134,853,870

 

$          718,175

$        33,253,043

$ 168,825,088

 

 

Section 4 / Transit Capital - Section 5309                                                                                                                                                                                                                                                                                                                                                               

 

MBTA

REVENUE VEHICLES- RED AND ORANGE LINE- NEW VEHICLE PROCUREMENT

5309

$        70,000,000

 

 

$        17,500,000

$      87,500,000

 

 

MBTA

SYSTEM UPGRADES

5309

$        23,981,902

 

 

$           5,995,476

$      29,977,378

 

 

Transit Capital Total ►

$        93,981,902

 

$                     -

$        23,495,476

$ 117,477,378

 

 

2016                                TIP Section 3: TIP Section 4: Total of All

Boston MPO TIP Summary - Transit                                                       Projects ▼

 

$      168,825,088

$117,477,378

$ 286,302,466

◄ Total Spending in Region

◄ Total Federal Spending in Region

◄ Total Non-Federal Spending in Region

$      134,853,870

$ 93,981,902

$ 228,835,772

$        33,971,218

$ 23,495,476

$ 57,466,694

Map