FEDERAL FISCAL YEAR 2012 TITLE VI ANNUAL
UPDATE
January 13, 2012
Title
VI of the Civil Rights Act of 1964 prohibits discrimination on
the basis of race, color, or national origin in programs and activities
receiving federal financial assistance. Two Executive Orders and related statutes
further define populations that are protected under the umbrella
of Title VI. Executive Order 12898 is concerned with environmental
justice for minority and low‐ income populations. Executive Order 13166 is concerned with providing equal access to services
and benefits for those individuals with limited English proficiency (LEP).
The Boston
Region MPO submitted
a comprehensive triennial Title VI report
to MassDOT in April
2011 and a revision of that report in June 2011. This report is an annual
update and follows MassDOT’s Annual Title VI Report Template of April 2011.
Only the policies and activities that have changed since the June revision are
discussed. If there are no changes to present in a report section, that fact is
noted.
Appendix I provides: (1) A description of the MPO election procedures as adapted in 2011 to the
new MPO structure and (2) the bylaws of the Regional Transportation Advisory
Council.
Section 2: General
Reporting Requirements [FTA C 4702.1A IV]
A.
Title VI Coordinator
Alicia Wilson,
Transportation Equity Manager
B.
Annual Title VI Certification and Assurance [FTA C 4702.1A IV.1]
The MPO’s signed Title VI assurances are provided beginning on page 3.
C.
Notification of Protection under
Title VI [FTA C 4702.1A IV.5 and FTA C 4702.1A
IV.7.a.5]
The MPO has developed the following notice to the public of protection under Title VI:
The Boston
Region Metropolitan Planning
Organization (MPO) fully complies with Title VI of the Civil Rights Act of 1964 and related
statutes and regulations in all programs and activities. The MPO does not
discriminate on the basis of race, color, national
origin, English proficiency, income, religious creed, ancestry, disability,
age, gender, sexual orientation, gender identity or expression, or military
service.
Meeting locations are accessible to people with
disabilities and via public transportation. Assistive listening devices and
large‐print materials will be available at meeting sites. Upon advance request,
every effort will be made to prepare materials in other formats and in
languages other than English, and to provide
interpreters in American
Sign Language and other
languages. For assistance or accommodations, contact Mike Callahan, preferably
two weeks before the meeting, at (617) 973‐8853 (voice), (617) 973‐8855 (fax),
(617) 973‐7089 (TTY), or publicinformation@bostonmpo.org (e‐mail).


Persons who believe
that they have been subject
to discrimination by the Boston
Region MPO may file a
complaint according to the MPO’s procedures.
This statement is posted on the
MPO’s website along with the procedures for filing a complaint and the MPO’s complaint
form. Also, in all public‐outreach materials the relevant
portions of the statement are included.
D.
Complaint Procedures [FTA C 4702.1A IV.2 and FTA C 4702.1A
IV.7.a.3]
In
order to comply with 49 CFR Section 21.9(b), the MPO has
developed procedures for receiving, investigating, addressing, and tracking Title VI complaints. The MPO’s complaint procedures and forms, updated in
October 2011, are provided in Appendix II.
The MPO has not received any Title VI complaints or lawsuits, and no investigations have been initiated.
E.
Meaningful Access for LEP Persons and Language Implementation Plan [FTA C 4702.1A
IV.4]
The
MPO used Massachusetts Department of Education data to supplement Census data for outreach. No other changes.
F. Special Studies of Traditionally Under‐Served or Low‐Income Populations
A
draft analysis of low‐income and minority responses
to the 2008‐2009 MBTA Systemwide Survey was conducted (a copy of
the memorandum will be provided when finalized).
G.
Title VI Investigations, Complaints, and Lawsuits [FTA C 4702.1A IV.3 and FTA C 4702.1A IV.7.a.4]
The MPO has not received any Title VI complaints.
H. MPO Funding
Sources
Listings of the MPO’s
funding sources are provided in Appendix III.
I.
Enhancement Projects Applications
The MPO has no enhancement projects .
J. Title VI Activities
The MPO submitted a triennial Title VI report
to MassDOT in April 2011. In response, MassDOT made recommendations concerning the time limit for
filing complaints, recording Title VI investigations, complaints, and lawsuits,
and providing additional information in the Title VI notice. All
recommendations were complied with and incorporated into MPO procedures. A
revised report was submitted in June 2011.
K.
The
Planning Process and Its Responsiveness to Title VI Requirements
No changes.
L. Activities Undertaken to Identify
the Needs of Low‐Income and Minority Populations
(See 2F, above.)
Section 3: Public Involvement [FTA C 4702.1A IV.7.a and FTA C 4702.1A
IV.9]
No changes.
None. The MPO has no fiduciary authority.
Section 5: Community
Impact Assessment [23 USC 109(h); FTA C 4702.1A
A. Overview
No changes.
B.
MPO
Policy and Plans
No changes.
C.
The
Transportation Planning Process
No changes.
D.
Demographic Profile of Environmental Justice Areas [FTA C 4702.1A VII.1.a]
2010 Census
minority population data at the tract level were released
on March 22, 2011.
Household income data at the tract level were released in December 2011. The
MPO will produce new demographic profiles during the first few months of 2012.
E.
Identification of Needs of Low‐Income and Minority Populations [FTA C 4702.1A VII.1.b]
No changes.
F.
How
Community Values, Environmental Justice, and Discrimination Considerations Are Addressed
No changes.
A.
Long‐Range Transportation Plan and Transportation Improvement Program: Assessment of Projects for Impacts on Environmental Justice Populations
The potential impact of a proposed
project in environmental justice areas is considered in the project‐ranking
processes for the Long‐Range Transportation Plan (LRTP), Transportation
Improvement Program (TIP),
and Unified Planning
Work Program (UPWP).
Environmental justice analyses for the LRTP and TIP are funded
in the UPWP. In these analyses, MPO staff give projects
positive or negative ratings on environmental justice criteria based on the
estimated benefit to or burden on
environmental justice areas. The MPO
considers these ratings when deciding what
projects
should receive funding. The MPO also considers environmental justice when
determining which studies should be included in the UPWP. [These LRTP, TIP, and
UPWP processes are not new, but are described
here to provide
context for the information reported below.]
LRTP: Analysis
of the Effects of Planned
Transportation Projects
The MPO adopted a new Long‐Range
Transportation Plan and Air Quality Conformity Determination (LRTP), Paths to a Sustainable Region, on
September 22, 2011. This document states the MPO’s
transportation policies and goals, describes
the public participation process for
transportation planning, assesses the current state of the region’s
transportation system, estimates future needs and resources, and lays out a
program for preserving and expanding the system for the upcoming 25‐year
period. The process used to develop Paths
to a Sustainable Region is described in Appendix IV.
The LRTP includes a description of
the MPO’s Transportation Equity Program and presents environmental justice
analyses of the planned projects conducted to ensure that they do not
disproportionately burden, and that they equitably provide benefits to, minority
and/or low‐ income communities. This analysis process
has not changed. Chapter 9 of Paths to a Sustainable Region details the
results of the analysis; this chapter is provided in Appendix V. The analysis
showed that the projects recommended in the final LRTP benefit environmental
justice areas slightly more overall than they benefit non‐environmental‐justice
areas.
TIP: Analysis
of the Effects of Planned
Transportation Projects
The MPO adopted the federal fiscal
years 2012–15 Transportation Improvement Program and Air Quality Conformity Determination (TIP) on September
22, 2011. Since the MPO’s last Title VI
submittal, there have been no changes in the process for developing the TIP or
the process for analyzing the effects of planned TIP projects on environmental
justice areas.
B.
Coordination with Citizens and Community‐Based Entities
in Defining Environmental Justice Communities for the Purpose of Assessing Transportation
Impacts
No changes.
C.
Studies Sensitive to Title VI, Environmental Justice, and/or ADA Adherence
The following describes current and
upcoming MPO initiatives in the UPWP for providing data collection and analysis that support MPO coordination of environmental justice
issues and that help in addressing the
transportation needs of minority, LEP, and low‐income residents.
Transportation Equity/Environmental Justice Support
The primary purpose of this ongoing
project is to integrate environmental justice issues and concerns into MPO
planning and programming activities and support development of the LRTP, UPWP,
TIP, Congestion Management Process (CMP), air quality conformity
determinations, and project‐specific work products. Another purpose is to
foster awareness of the MPO in environmental justice populations and to
facilitate their participation in MPO planning and programming. This has been done through
continued outreach to minority, LEP, and low‐income populations.
Analysis of JARC and New Freedom
Projects
Many MPO‐recommended proposals for the FTA’s Job Access and Reverse Commute (JARC) and New Freedom grant programs were funded during
the last three years. These proposals include:
conducting studies on how to facilitate coordination of existing transportation
resources, identifying resource gaps and developing strategies for closing
them, enhancing consumers’ abilities to access and use transportation options,
and planning for and operating paratransit.
The
MPO will determine
which of these projects are/were
effective and will use this information
to recommend future projects, to encourage the use of best practices, and to
update the Coordinated Public‐Transit Human Services Transportation Plan.
Impacts of Walking Radius/Transit Frequency and Reliability
The current MBTA service delivery
policy’s coverage guideline states that, in areas that are served by bus and/or
rapid transit with a population density of greater than 5,000 persons per
square mile, no individual should need to walk farther than 0.25 miles to
access transit service. As part of
this project, CTPS will analyze
the potential of and suggest
possible system designs for
local bus system consolidation under scenarios in which the 0.25‐mile radius is
relaxed to 0.33 miles, 0.4 miles, and 0.5 miles and the consolidated bus routes
adhere to rapid‐transit‐service standards. This modeling‐based effort will build
on the MBTA Core Services
Evaluation study and will help the MPO better understand
the implications of the tradeoff involved in eliminating poorly performing
local bus routes and increasing service on a smaller number of transit
corridors. It will explore what the best option might be for providing mobility
and accessibility through the bus network. The ultimate goal
is to increase transit mode shares. The study will also consider the equity
implications and potential
tradeoffs of the potential service
approaches.
Boston Region MPO Election
Procedures and RTAC By‐Laws
On Wednesday October 26, 2011, elections will be held for
eight (8) of the twelve (12) total local municipal seats on the Boston Region
Metropolitan Planning Organization (MPO). The election
will be convened at the MAPC
Fall Council meeting, which will be held at the Cambridge Marriott, Two
Cambridge Center, 50 Broadway, Cambridge MA 02142, adjacent to the Kendall
Square MBTA Red Line station, 8:30 – 11:30 AM.
At that time eight (8) municipalities will be elected to the MPO by the
chief elected officials of the 101 municipalities which constitute the Boston
metropolitan region.
Pursuant to the Memorandum of Understanding, approved
on July 7, 2011 detailing the restructuring of the MPO, the Metropolitan Area Planning Council (MAPC) and the MBTA Advisory Board (Advisory Board) will administer
the election of the municipal representatives to the MPO.
New MPO Structure
The
new MPO will be made up of twenty two (22) seats, which include:
Massachusetts Department of Transportation (MassDOT)
with three seats appointed by the Secretary of Transportation, at least one of which is from its Highway Division;
Massachusetts Bay Transit Authority
(MBTA); Massachusetts Port Authority (Massport); Metropolitan Area
Planning Council (MAPC); MBTA Advisory Board;
Regional Transportation Advisory Council (RTAC); City of Boston with two MPO seats;
Eight (8) elected municipalities, one seat each from the eight MAPC sub-regions;
Two (2) cities filling at-large seats;
Two
(2) towns filling at-large seats.
MPO Seats Up For
Election
One (1) from the North Shore
Task Force sub-region One (1) from the North Suburban
sub-region
One (1) from the South West Advisory
Planning Committee (SWAP)
sub-region One (1) from the Three Rivers Interlocal Council (TRIC)
sub-region
Two (2) at-large town seats
Two (2) at-large city seats
Terms of
election on the new MPO are for three years, however adjusting to the new
membership will call for a few anomalies in the terms
for several of the
elected municipalities. For the 2011 elections, the city
and the town running for an at-large
seat that receive the most votes will serve an additional (fourth) year on the MPO. The North Suburban and TRIC
representatives will also serve a fourth year. These communities will serve an
additional year in order to stagger the MPO elections
in future years so that there are four (4) municipal seats up for election each
year.
Nomination Process
Nominees for the elected
municipal seats shall
be the chief elected official
of the municipality. In cities, this is the Mayor
or, if the city does not have the office of Mayor, then the Chairman of the
Council, with the exception of Plan E cities
(Cambridge) in which case it shall be the City Manager. In towns, the chief elected official is the Chairman of the
Board of Selectmen. The MPO will accept the
A nominee
for an open municipal seat must receive
five nominations made by any chief
elected official from the
Boston region. A chief elected official may nominate his or her municipality
and that nomination shall count as one of the five nominations needed to place
a municipality on the ballot.
Each chief elected official may only sign nomination papers
for one municipality per sub-region for the four open sub-regional seats, and one
nomination paper for each of the at-large seats (two cities and two towns).
Nomination papers must be filed by 5 PM on
Friday September 23, 2011 with the Executive Director
of the Metropolitan Area Planning Council (MAPC) who will coordinate the
certification of the nominations with the Executive Director of the Advisory
Board.
Nomination papers shall include a statement of candidacy
(250 word limit) of the community. Nominations papers are due on Friday, September 23, 2011 to MAPC by
5:00 PM and must
be filed in person
or by mail at MAPC, 60 Temple
Place, 6th Floor,
Boston, MA 02111,
Attn: MPO Elections. Faxes or emails will not be accepted.
Voting Process
Each of the 101 communities may vote for one (1) municipality from each of the four (4) open sub-regional seats, one (1) town for each of the two (2) open at-large town seats, and one (1) city for each of the
two (2) open at-large city
seats, for a total of eight (8) votes that each of the 101 municipalities may
cast.
MAPC Sub-regions
Attached for
your reference is a list and map of towns and cities by sub-region. (Attachment A). Because Bedford (Minuteman
Advisory Group on Interlocal Coordination), Somerville (Inner Core Committee), Framingham (Metro West Regional
Collaborative), and Braintree (South Shore Coalition) already serve on the MPO until
at least 2012, only communities from the North Suburban Planning Council, North
Shore Task Force, South West Advisory Planning
Committee, and Three Rivers Interlocal Council can run for the open
sub-regional seats. However, any municipality not currently serving on the MPO
may run for one of the two open at-large town seats and two at-large city
seats.
Ballot
A
ballot will be prepared by MAPC and the Advisory Board based on the
certification of nomination papers for the communities. The ballot shall contain a list of the nominated municipalities. Candidate communities shall appear on the ballot in an order drawn by lot by designated officers of MAPC and
the Advisory Board. The subregion of each of the communities, as well as the
communities running for at- large seats, shall be identified on the ballot. A
candidates’ booklet shall be issued that shall contain the statement of
candidacy of the communities. The
list of communities shall appear in the booklet in the same order that they
appear on the ballot. In the second mailing, MAPC and the Advisory Board will
include an absentee ballot and instructions for how municipalities can cast
their vote.
Opportunities for Discussion
with Representatives of the Candidate
Communities
The Metropolitan Area Planning
Council and the MBTA Advisory Board shall provide appropriate opportunities for the electorate to meet representatives of candidate communities and discuss issues.
In 2011, this will be accomplished by holding a Candidates Night
approximately two weeks before the MPO election. The date, time, and location of the Candidates Night will follow
in a second mailing.
Election
The
election will be held at MAPC’s Fall Council Meeting on Wednesday October
26, 2011 at the Cambridge Marriott,Two Cambridge Center,50 Broadway, Cambridge MA 02142, adjacentto the Kendall Square MBTA Red Line station, 8:30 – 11:30 AM.
On that day, the designated officers of
MAPC and the Advisory Board shall supervise the election
to the municipal seats. Ballots shall
be cast by the chief elected official of the community (as defined by the rules
for nominees), or that person’s designee. Designees shall
present a letter
signed by the chief
elected official to the designated officers of MAPC and
of the Advisory Board 30 minutes prior to the convening of the election on election day.
This letter will appoint the designee and confirm his or
her authority to cast the community’s ballot. Such a designation shall be
delivered in person or by mail. Designees
may represent only one community in the election. The designation may require the designee to vote for specific individuals or may vest discretion in the designee.
If the chief elected
official is unable
to attend the election and does not designate another
individual to attend, an absentee ballot may be filed. Such an absentee ballot must be filed
by 5 PM on Tuesday October 25, 2011 with the Metropolitan Area Planning Council,60 Temple Place,Boston, MA 02111. No faxes will be accepted. This
ballot is valid for any election (e.g. run off
election in case of a tie) held on the day of
the MPO election for which the candidates selected on the
ballot are still eligible to receive votes.
The eight municipalities that receive the most votes, from the 101 cities and towns in the region, for the
open seats for which they are running,
shall be elected
to a three-year term. The exception, for the 2011 elections, is that the city and
the town running for an at-large seat that receive the most votes will serve an additional
(fourth) year on the MPO.
The seats are held by the municipality and the chief elected official (or their official designee)
shall represent the municipality throughout the municipality’s term of
office.
The designated officers of MAPC and of the Advisory
Board shall certify
the results of the election to the chairman of the MPO by 12
noon on Friday October 28, 2011.


*MAPC Legal Counsel has rendered an opinion that Franklin and Watertown are defined as cities for the purpose of the MPO Election.
Attachment C
Background:
The Metropolitan Planning Organization is established as a required
part of the transportation planning process under federal law. It is responsible for planning and
programming financial resources for a multi-modal transportation system for the Boston region. The MPO was
established in 1973. In 2011 the MPO
Memorandum of Understanding (MOU) was updated to reflect the new Massachusetts
Department of Transportation (MassDOT) and the new MPO membership.
The Boston
MPO Memorandum of Understanding (MOU) that details
the governing structure
and process of the MPO can be viewed at www.bostonmpo.org/mou
Specific Responsibilities:
The MPO must prepare
and approve several
plans and programs
on an annual basis. These include:
The MPO also prepares
and approves several
other plans and programs as necessary. These
include:
MPO Meetings:
Meetings are held as needed to accomplish the MPO’s
business. There are approximately two
MPO related meetings a month that are held in Boston, during the day, at the
state transportation building. Four of these meeting will be held quarterly outside
of Boston. These meetings
typically occur at 10am
on the first and third Thursday of the month, and last approximately three
hours. The MPO has the authority to establish necessary committees to
accomplish its responsibilities. Recent
experience suggests that the municipal members of the MPO or their designees
attend at least two meetings per month to accomplish the work of the
committees.
Adopted 5/8/2002and Amended 10/ 14/2009
BYLAWS OF THE REGIONAL TRANSPORTATION ADVISORY COUNCIL
Article I - NAME
The organization will be known as the Regional Transportation Advisory Council, referred to as the Advisory Council.
Article II - PURPOSE
The Regional Transportation Advisory Council advises the Boston Metropolitan
Planning Organization on transportation policy and planning. The Advisory
Council provides a forum for broad public participation in the transportation
planning process.
Article III - MEMBERSHIP
Membership
shall consist of a broad and balanced spectrum of providers and users of any form of transportation. Individuals are welcome to participate in all meetings of the Advisory Council,
but membership is limited to public and private organizations and governmental
units, including state agencies and municipalities.
Member
entities shall designate in writing one representative and up to two
alternates. Representatives and alternates should be empowered by the entities they represent to cast votes on
matters before the Advisory Council. Entities may be admitted to membership by
vote of the existing members. Continuing membership shall depend on active
participation, defined as attendance at the majority of
council meetings in a federal fiscal year. As used herein, the term
"member" refers to an entity, and the terms
"representative" and "alternate" refer to individuals
designated by a member entity.
All members of the Boston Metropolitan Planning Organization shall be non-
voting members of the Advisory Council.
Article IV - Officers
The Officers shall be a Chairman
and a Vice Chairman.
The Chairman
shall be the primary contact
for the Advisory
Council, shall set agendas and call and preside at the
meetings.
As
provided in the Boston MPO's Memorandum of Understanding of December 13, 2001: The Advisory Council is an ex-officio,
non-voting member of the Boston MPO and the Chairman representing the Advisory
Council, will attend and participate in Boston MPO meetings; The Chairman shall be a voting member of the Transportation Planning and
Programming Committee of the Boston Metropolitan Planning Organization; the
Chairman will also chair the standing Public Participation Committee of the
Boston MPO and the Chairman or his/her designee shall have the opportunity to
be represented on all committees appointed by the Boston MPO and shall have
full voting rights on these committees,
The
Vice Chairman shall serve in the absence of the Chairman and shall replace the Chairman
in case of a vacancy
in that office.
The Vice Chairman
shall actively participate in
meetings of the Transportation Planning and Programming Committee of the Boston
MPO and will vote only in the absence of the Chairman of the Advisory Council.
The Vice Chairman will actively participate in meetings of the Boston MPO in
the absence of the Chairman of the Advisory Council.
Article V - MEETINGS
The
Advisory Council will meet monthly as determined by the Chairman with at least seven days notice of the time and agenda provided to the representatives. Special meetings may be
called by the Chairman with seven days notice. All
meetings are open to the public.
The
conduct of the meetings shall be governed by Roberts Rules of Order, however, parliamentary discretion shall be vested in
the Chairman. The Chairman shall recognize
all attendees wishing
to be heard, and shall grant the floor, except in the discussion of a
motion on the floor, where the Chairman shall have discretion.
Article VI - QUORUM
One third of the voting members
shall constitute a quorum. A simple majority of members present
and voting is necessary for passage of all motions.
Article VII - MOTIONS
Motions
will be accepted only if moved and seconded by voting members' designated representatives or alternates participating in a representative's absence.
Article VIII - VOTING
Each voting member shall have one vote, to be cast by its designated
representative, or in case of absence, by an alternate.
Article IX - COMMITTEES
The Chairman
shall appoint committees to assist in carrying out the business
of the Advisory Council. Reports by committees shall be submitted to the
Chairman for report to the Council. The Chairman shall
publish a list of existing committees and their membership
in November. The following committees will be established, as well as other
committees deemed appropriate by the Chairman of the Advisory Council, with
members appointed by the Chairman unless otherwise provided by these bylaws.
An
Executive Committee shall consist of the Chairman, the Vice Chairman, the
immediate past Chairman,
and Chairs of all Standing
committees. The Executive Committee shall be authorized to
act in place of the full Advisory Council on any matters arising between
Council meetings that require immediate action.
Any
actions so taken shall be reported to the Advisory Council at its next meeting.
In the case of officer vacancies, the Executive Committee shall nominate replacements for election at the next occurring Advisory
Council meeting, and the Executive Committee nominees shall serve until
those elections.
A Membership Committee shall be chaired by the Vice Chairman of the Advisory Council and shall include at
least one representative each from a citizen advocacy organization, a
municipality, and a state agency. The membership committee should assess the
breadth of representation on an ongoing basis and report annually to the
Chairman changes that should be made in Council membership, if any.
Committees
shall be appointed by the Chairman to review and offer recommendations on each of the following plans and programs:
the Regional Transportation
Plan, the Transportation Improvement Program, and the Unified Planning Work
Program.
A
Nominating Committee shall be appointed by the Chairman prior to yearly
elections of officers, and shall be chaired by the
immediate past Chairman of the Advisory Council.
Nominating Committee membership shall include at least
one representative each from a citizen advocacy organization, a non-MPO member
municipality, and a non-MPO member state agency.
Article X - ELECTIONS
The Nominating Committee shall recommend
candidates for Chairman
and Vice Chairman in August.
Nominations from the floor, when duly seconded, will be accepted. Elections
shall be held in September, and the Officers terms shall begin in October.
Article XI - AMENDMENTS
These
bylaws may be amended by a two-thirds majority vote of members present and
voting at a meeting of the Advisory Council. Specific notice of the proposed
amendment shall be provided to members at least seven days in advance of the meeting, in order to have representation available to vote at the
meeting.
Updated: June 10, 2011
Voting Members
Agencies
Boston
Redevelopment Authority (BRA) Cape Ann Transportation Authority (CATA)
Department of Conservation and Recreation (DCR) Executive Office of Elder Affairs
Division of
Energy Resources
Executive Office
of Energy and Environmental Affairs
(EOEEA) Joint Legislative Transportation Committee
Massachusetts Aeronautics Commission (MAC) MassRIDES
Seaport Advisory
Council Subregions:
Inner Core MAGIC
MetroWest Growth
Management Committee North
Shore Task Force
North Suburban
Planning Council South Shore
Coalition
SWAP TRIC
Municipalities Acton Arlington
Belmont Brookline Cambridge Canton Lexington Marlborough Medfield Millis
Natick Needham Quincy Revere Wayland Wellesley Westwood Weymouth
Advocacy Groups
128 Business Council
Access Advisory
Committee to the MBTA (AACT) American Council of Engineering Companies (ACEC)
American Planning
Association/Massachusetts Chapter (APA) Association for Commuter
Transportation (ACT)
Association for Public Transportation (APT) Boston Society of Architects (BSA)
Boston Society
of Civil Engineers (BSCES/ASCE)
Construction Industries of Massachusetts (CIM)
Eastern Massachusetts Freight
Rail Coalition (EMFRC) Institute of Transportation
Engineers (ITE) Massachusetts Bus Association (MBA)
Massachusetts Motor Transportation Association (MMTA) MassBike
Mass Commute
Medical Academic
and Scientific Community Organization, Inc. (MASCO) MoveMass
National Corridors Initiative (NCI)
Neponset Valley
Chamber of Commerce
(NVCC) Riverside Neighborhood Association WalkBoston
Non-Voting Members
Agency Members of the Boston Region MPO MassDOT Office on Planning and Programming Massachusetts Bay Transportation Authority
(MBTA) Massachusetts Port Authority (MassPort)
MassDOT Highway
Division MBTA Advisory Board
Metropolitan Area Planning Council (MAPC)
Municipal Members of the Boston Region MPO
Bedford Boston Braintree Framingham Hopkinton Newton Somerville
Advisory
Federal Highway
Administration (FHWA) Federal
Transit Administration (FTA)
Other MPOs
Central Massachusetts Merrimack Valley Montachusett Northern Middlesex Old Colony
Southeastern Massachusetts
Title VI Nondiscrimination Complaint Procedure and Forms
BOSTON REGION METROPOLITAN PLANNING
ORGANIZATION TITLE VI NONDISCRIMINATION COMPLAINT PROCEDURE
Title VI of the
Civil Rights Act prohibits discrimination on the basis of
race, color, or national origin in programs and activities receiving federal
financial assistance. Two Executive Orders and related statutes further define
populations that are protected under the umbrella of Title VI. Executive Order
12898 is concerned with environmental justice for minority and low-income
populations. Executive Order 13166 is concerned with providing equal access to services and benefits for those individuals with limited English proficiency (LEP). The rights of
women, the elderly, and people with disabilities are protected under related
statutes. Title VI requires that recipients of federal assistance not
discriminate against the protected populations whether the aid is received
directly or through contractual means. Massachusetts General Law extends these
protections to prevent discrimination on the basis of
religion, military service, ancestry, sexual orientation or gender identity or
expression.
In order to comply with 49 CFR Section 21.9(b),
the Boston Region Metropolitan
Planning Organization (MPO) maintains the following procedure for receiving,
investigating, addressing, and tracking Title VI complaints.
1.
Submittal of
Complaints
Any individual
who believes that he or she, or any specific class of persons, has been
subjected to discrimination or retaliation, as prohibited by Title VI of the
Civil Rights Act of 1964,
as amended, and related
statutes, by the Boston
Region MPO in its role of planning and programming federal funds may
file a written complaint. Complaints may be filed
for discrimination on the basis of race, color,
national origin, language, gender, age, disability, income, religion, military
service, ancestry, sexual orientation, or gender identity or expression. Such
complaint must be filed no later than 180 calendar days after the date the
person believes the discrimination occurred.
Written complaints shall be submitted to:
Mr. Richard
A. Davey, Chair
Boston Region Metropolitan Planning
Organization State Transportation Building
10 Park Plaza,
Suite 2150
Boston, MA
02116-3968
Complaints shall be in writing and shall be signed by the
complainant and/or the complainant’s representative. Complaints shall set forth as completely as possible the facts
of and circumstances surrounding the alleged discrimination and shall include
the following information:
• Name, address, and phone
number of the complainant.
• A
written statement of the complaint, including the following details:
o
Basis of alleged
discrimination (for example,
race, color, national origin, or language).
o
A detailed description of the alleged discriminatory act(s).
o
What in the nature of the incident(s) led the complainant to feel discrimination
was a factor.
o
The date or dates on which the alleged discriminatory event or events
occurred.
o
Name(s) of alleged discriminating individual(s), if applicable.
• Other agencies (state, local, or federal)
where the complaint
is also being filed.
• Complainant’s signature and date.
In the case
where a complainant is unable or incapable of providing a written statement and has no designee to do so, a verbal
complaint of discrimination may be made through the Deputy Director. Verbal complaints may
be submitted (either in person, by telephone at (617) 973-7117, or via a
recording) to the Deputy Director. The Deputy Director will convert the verbal
allegations to writing and provide
the complainant with the written
document for confirmation, revision, and a signature
before processing. In cases where the Complainant will be assisted in
converting an oral complaint into a written complaint, the Complainant is
required to sign the written complaint.
Written complaints may also be submitted to:
MassDOT Director
of Civil Rights 10 Park Plaza, Suite 4160
Boston, MA 02116
Departmental Office
of Civil Rights
U.S. Department of Transportation
1200 New Jersey Ave. Washington D.C.
20590
2.
Review
of Complaint
Upon receipt of the complaint, the MPO chair shall
appoint the Boston Region MPO staff Executive Director and other MPO staff to
review it. This review may include the collection of additional information
from the complainant and/or the alleged discriminating party(ies). Upon completion of the review, the Boston Region MPO
staff Executive Director shall report to the chair of the MPO’s Transportation
Planning and Programming Committee. This report may include recommendations for possible action
to address the complaint. Recommendations may include:
• Forwarding the complaint to a responsible implementing agency.
•
Identifying remedial
actions available to provide redress.
• Identifying improvements to the MPO’s processes
relative to Title VI and environmental justice.
The chair of the Transportation Planning and Programming Committee shall refer the matter to the Transportation
Planning and Programming Committee’s Administration and Finance Subcommittee,
which shall meet to discuss the complaint and the staff report.
3.
Responding to Complaints
The Administration and Finance Subcommittee shall develop a proposed response to the complaint, recommending a
course of action, and submit it to the Transportation Planning and Programming
Committee for discussion and approval. The committee shall forward the approved
response to the MPO chair for consideration and potential implementation. The
chair shall decide on a response to the complaint and inform the committee of what that response will be.
The MPO chair
shall issue a written response to the complainant. This response shall be issued no later than 60 days after the date on which the chair received
the complaint. If more time is required, the chair shall notify the
complainant of the estimated time frame for completing the review and response.
If a complaint concerns
agencies other than the Boston Region MPO, MPO staff will seek permission from the
complainant to forward his/her complaint to appropriate individuals at those
agencies.
4.
Appeals
The complainant may appeal the chair’s response
to the complaint. Appeals must be in writing and be submitted to
either of the following no later than 30 days after the date of the written
response:
MassDOT Director
of Civil Rights 10 Park Plaza, Suite 4160
Boston, MA 02116
Departmental Office of Civil Rights
U.S. Department of Transportation
1200 New Jersey Ave. Washington D.C.
20590
In the case
where a complainant is unable or incapable of providing a written appeal and
has no designee to do so, a verbal appeal to a complaint of discrimination
decision may be made through the Deputy Director. Verbal appeals may be submitted
(either in person,
by telephone at (617) 973-7117,
or
via a
recording) to the Deputy Director. The Deputy Director will convert the verbal appeal to writing
and provide the complainant with the written
document for confirmation, revision, and a signature before processing. In cases where the
Complainant will be assisted in converting an oral appeal into a written
appeal, the Complainant is required to sign the written appeal.
These procedures do not deny the right
of the complainant to file formal complaints with other state or federal agencies
or to seek private counsel.
These procedures are part of an
administrative process that does not include punitive damages or compensatory
remuneration for the complainant.
MPO staff will forward complaints and responses to those complaints to the Massachusetts
Department of Transportation’s Office of Civil Rights.
The MPO shall maintain a list of complaints, lawsuits,
and investigations alleging discrimination on the basis
of race, color,
or national origin.
The list shall include filing date(s), allegation summaries, the
status of the investigation, lawsuit or complaint, and actions taken
by the MPO. The list of complaints, investigations and resolutions will be forwarded to
MassDOT’s Office of Civil Rights. A summary of all civil rights compliance
review activities conducted over the latest three-year period shall be maintained.




Boston Region
MPO Funding Sources








8 BOSTON REGION
MPO BUDGET AND OPERATING SUMMARIES
![]()
This
chapter contains overall budget information by
recipient agency and by funding
source for the projects listed in the previous chapters. The infonnation is presented according to the same UPWP
categories used in those chapters:
|
Administration and Resource Management Projects |
$832,200 |
|
Certification Requirements |
2,475,000 |
|
Planning Studies |
1,166,800 |
|
Technical Support/Operations Analysis Projects |
2,090,800 |
|
MassDOT Match to CTPS FFY 2012 Section 5303 Funds |
260,400' |
|
Total |
$6,825,200 |
Funding
for the projects listed in Chapters 4 through 7 of this UPWP comes from the
following sources, which are described in Chapter 1:
|
FHWA 3C Planning (PL)/MassDOT Local Match |
$3,286,300 |
|
FHWA Statewide Planning and Research (SPR)/MassDOT Local Match |
500,000 |
|
FTA/MassDOT and MAPC Local Match |
2,134,200 |
|
MassDOT |
385,000 |
|
MBTA |
460,500 |
|
Other |
59,200 |
|
Total |
$6,825,200 |
On the following pages, the funding information presented
in the preceding chapters is summarized in
four tables, one for each UPWP
category. These tables are followed
by a one page summary showing the
entire budget by recipient agency and funding source, a table showing the grant
application categories for Section 5303 funding, and charts presenting
schedules and staff assignments for CTPS projects in this UPWP. The purpose of
these summaries is to assist federal and state contract administrators in reviewing the overall work program in detail.
Paths to a Sustainable Region Development Process
Paths to a Sustainable Region, the Long-Range Transportation Plan of the Boston Region Metropolitan Planning Organization (referred to as the LRTP), is the long-range, comprehensive transportation planning document for the Boston region. The region encompasses 101 cities and towns from Ipswich to Duxbury and Boston to Marlborough (see Figure 1-1). This is the area in which transportation planning is the responsibility of the Boston Region Metropolitan Planning Organization (MPO), as will be explained in this chapter. Covering 1,405 square miles, the MPO region makes up about 18 percent of the state’s land area; however, with more than three million residents, it has 48 percent of the state’s population.
The LRTP defines transportation visions for the future of the region, establishes goals and policies that will lead to the achievement of the visions, and allocates projected revenue to transportation programs and projects that implement those goals and policies. Fundamentally, the LRTP is about making choices for the future of the metropolitan area—choices about local and regional land use, choices about where to allocate limited
transportation resources, and choices about the type of future we wish to see for our region and, by extension, the commonwealth of Massachusetts. In accordance with applicable federal planning regulations, the LRTP addresses surface transportation issues only.
The LRTP’s 23-year scope (2012 to 2035) allows the MPO to consider the transportation network’s future from a broad perspective. Only projects funded with federal dollars designated as “regionally significant” and “major investment” projects are specifically listed by name in the LRTP. The term “regionally significant” refers to projects required by federal regulations to be included in the travel demand model (a computer model) for air quality conformity purposes—generally, any project that adds capacity to the regional transportation network. Major investment projects are projects that cost over $10 million.

For a more detailed explanation of the types of projects that must be included in the model, see Chapter 10, Air Quality Conformity Determination. Many of the transportation projects and programs that will be funded with federal dollars in the
next 23 years do not add capacity to the transportation system and are, therefore, not specifically identified in the LRTP. The function of these projects will be primarily to maintain and operate the existing system. Nevertheless, when it comes time to select projects for funding in the Transportation Improvement Program, selection will be based upon how well they implement the goals and policies adopted in the LRTP.
The Boston Region MPO is responsible for the development of the LRTP. It conducts transportation planning in its region for a variety of transportation modes and facilities, including highway, transit, nonmotorized, and freight. By bringing together representatives from local, regional, state, and federal entities and a public advisory
council, and engaging with members of the public, MPO decision making is sensitive to the diverse range of interests and concerns that exist in the Boston region.
Federal law establishes requirements and guidelines for transportation planning in urbanized areas with populations of more than 200,000. In order to be eligible for federal transportation funding, an area must maintain a continuing, cooperative, and comprehensive (3C) transportation planning process. The Boston Region MPO is responsible for carrying out the 3C process in its area.
The MPO is a cooperative board of 14 voting members:1
1 The Boston Region MPO has revised its Memorandum of Understanding (MOU) and organizational structure. It will be- come effective November 1, 2011. The new structure can be reviewed at www.bostonmpo.org in the fall of 2011.
The Federal Highway Administration (FHWA), the Federal Transit Administration (FTA), and the Regional Transportation Advisory Council (the Advisory Council), which is the MPO’s official advisory group, also participate on the MPO, in a nonvoting capacity.
In addition to the LRTP, the Boston Region MPO is required to develop other documents and programs as part of the 3C transportation planning process. These include:
The UPWP and the CMP are used in the development of the LRTP. Along with the TIP, they help to implement the
visions and objectives of the LRTP. Other documents or initiatives considered in the development of the LRTP are:
Brief descriptions of all of the above and their relationship to the LRTP are provided below.
The Unified Planning Work Program
The annual Unified Planning Work Program (UPWP) describes transportation planning studies to be undertaken by the MPO and other entities in the Boston region during a given federal fiscal year. The UPWP is intended to serve two purposes. The first is to provide information to federal and state government officials, municipalities, regional organizations and interest groups, and the general public about all of the transportation planning studies that are expected to be undertaken in the region. The second is to provide complete budget information to federal and state officials about the expenditure of federal funds for planning studies that will be carried out by the MPO.
The planning studies in the UPWP are an important source of ideas and information that may help in project selection for the LRTP and TIP and also may evolve into projects that will eventually be included in the LRTP, and ideas received during the public outreach process for the LRTP sometimes lead to studies included in the UPWP.
The Congestion Management Process
The MPO’s Congestion Management Process (CMP) is an ongoing program for monitoring mobility in the region, providing the MPO and transportation planners with timely information about transportation system performance, and making recommendations in the areas where mobility deficiencies are found. The CMP program includes the systematic measurement and analysis of mobility problems in the region.
The MPO staff then provides decision makers with information about transportation system performance and with strategies and recommendations for addressing identified problems and improving mobility. Information from the CMP and associated planning studies funded through the UPWP are used in the selection of projects for the LRTP and the TIP.
The Transportation Improvement Program
The Transportation Improvement Program (TIP) is a multimodal program that sets forth a detailed list of transportation projects that are programmed to receive federal funding during the four-year horizon of the document. The projects advanced in the TIP are consistent with the policies and goals of the LRTP. The TIP describes the transportation projects that are expected to be implemented during this four-year period and provides information about how they have been prioritized. It also includes a financial plan showing the revenue source or sources, current or proposed, for each project. In order to be eligible to receive federal funds, a project must be programmed in the current federal fiscal year’s TIP. In addition to the federally funded projects, most highway projects funded with state transportation money are also included in the TIP in the Boston region. In order for any regionally significant project to be included in the TIP, it must be included in the LRTP. One function of the TIP is to serve as the implementation arm for the LRTP.
The MBTA Program for Mass Transportation
The MBTA Program for Mass Transportation (PMT) is the long-range, fiscally unconstrained, 25-year capital program of the MBTA. The objective of the PMT is to identify and prioritize projects that will result in a cost-effective mass transit system that serves the greatest number of passengers while furthering environmental, economic development, and environmental justice goals. The MBTA adopted the current PMT in December 2009. The MPO uses it to prioritize transit projects for inclusion in the LRTP.
Legal Commitments
Several transportation projects are legal commitments that MassDOT or other transportation agencies in Massachusetts must complete within a certain time frame. The legal commitments that have the greatest impact on planning in the Boston region are those pertaining to the State Implementation Plan (SIP) and the Central Artery/ Tunnel project.
The federal Clean Air Act requires states with one or more MPO regions that do not meet federal air quality standards, such as Massachusetts, to produce a SIP. A SIP describes the efforts that a state has made, or proposes to make, to reduce levels of pollutants, such as ozone and carbon monoxide. Massachusetts was required to produce a SIP, and MassDOT and other transportation agencies, including the MBTA and
Massport, are required to implement the transportation projects and policies that are included in the SIP.
In the SIP, the Central Artery/Tunnel (CA/T) project commitments are the result of an agreement entered into by the state’s Department of Environmental Protection (DEP) and the former Executive Office of Transportation (EOT, now MassDOT) during the approval process for the CA/T project. This agreement was updated, with revised implementation schedules, in an Administrative Consent Order between DEP and EOT in 2000. In 2004, EOT and DEP began a process, completed in July 2008, of reevaluating the projects in the original SIP commitments. This process was undertaken to ensure that any further investments fund the best regionally significant projects that meet air quality goals and requirements.
As a matter of policy, the MPO includes all legal commitments related to the SIP and the Consent Order in the LRTP.
Federal metropolitan planning regulations require MPOs to develop a regional transportation plan every four years. This section outlines the process that was followed in the development of the new LRTP, Paths to a Sustainable Region.
Public Outreach for the LRTP
Process and Activities
The MPO’s Public Participation Program is designed to provide opportunities for members of the public, interest groups, other stakeholders, and elected officials to be involved in MPO decision making, including the development of the LRTP, the UPWP, and TIP; the program also supports the ongoing work of the Regional Transportation Advisory Council (the Advisory Council) and the MPO’s Transportation Equity Program. The MPO adopted its current Public Participation Program in June 2007 and amended it in April 2010. The activities identified in the program are designed to meet federal planning rules that require the MPO to maintain a continuing, cooperative, and comprehensive (3C) transportation planning process and also reflect the MPO’s commitment to providing opportunities for substantive public involvement. The MPO followed and expanded on the Public Participation Program as it developed a specific Public Involvement Plan for Paths to a Sustainable Region, which was approved by the MPO in February 2010.
In developing Paths to a Sustainable Region, the MPO conducted a variety of outreach activities, beginning in the spring of 2010, inviting the involvement of participants that included the Regional Transportation Advisory Council; area residents; municipal, state, and federal officials; businesses; transportation interest groups; environmental groups; transportation providers; persons with disabilities; low-income and minority communities; the elderly; and persons with limited English proficiency. Methods for eliciting public input included the following:
Communicating with the Public
The MPO uses several means to keep members of the public informed about MPO news, activities, and events, and to encourage public participation in the transportation planning process.
Email Distribution Lists: MPOinfo and MPOmedia
As an ongoing part of the planning process, the MPO prepares press releases, flyers, and other notices for distribution to a broad network of interested parties. These materials are distributed via the MPO’s one-way email list, MPOinfo, which includes more than 1,700 contacts, including municipal officials, planners, transportation equity contacts, special interest groups, members of the general public, legislators, environmental agencies and interest groups, and freight and transportation providers. Press releases and informational flyers are also distributed to more than 200 media outlets, including local Spanish-language publications (which receive Spanish-language text). Outreach
materials are also distributed to the Access Advisory Committee to the MBTA (AACT), which works with the MBTA to ensure that the public transportation system in the region is accessible to the elderly and people with disabilities.
The MPO has expanded its email contacts so that its messages reach councils on aging; commissions on disability; community development corporations; chambers of commerce; economic development, Main Street districts, and transportation committees; and conservation, youth, historical, and natural resource commissions.
TRANSreport
The MPO’s monthly newsletter, TRANSreport, is an important means of providing information on various aspects of the entire MPO planning process, including announcements of public participation opportunities and outreach activities. Each issue provides information on upcoming transportation-related public meetings and events, MPO studies completed or underway, other MPO activities, and ways to contact MPO staff with ideas and questions. Special inserts on important LRTP topics are included to provide detailed information and encourage public comment. TRANSreport is sent to approximately 3,000 recipients, including over 100 state legislators and their staffs, numerous local officials, and members of the general public in each municipality in the region. TRANSreport issues are posted each month on the MPO’s website, which also has an archive of past issues.
Website
The MPO’s website has pages designated for the LRTP and each of the other certification documents. These pages are updated frequently. Basic information on Paths to a Sustainable Region has been posted at www. bostonmpo.org/2035plan since the planning process for the current LRTP was launched. Draft documents were posted as they became available, at www.bostonmpo.org/2035input. These Web pages were promoted through the website’s home page, by email messages to MPOinfo, and on postcards that were distributed at public meetings.
A new Web feature developed for Paths to a Sustainable Region allows visitors to easily submit feedback. Under each draft document, a “Provide Feedback” button was posted. By clicking on this button, a visitor to the website could provide feedback on any draft material at any time. The feedback was organized by topic and presented to the MPO.
Social Media
The MPO launched a Twitter account (@ BostonRegionMPO) in March 2010. Social media sites are among the most visited websites on the Internet and allow the MPO to reach a broad audience and attract people to the MPO’s website to learn more about the MPO’s work. Announcements about Paths to a Sustainable Region, such as the availability of draft documents and public meeting information, are transmitted through Twitter. The MPO also uses YouTube to explain transportation planning issues and will produce a video summary of the LRTP. The use of social media is also consistent with the MPO’s Public Participation Program, which calls for utilizing new avenues of communication.
Public Comments
As a result of the outreach, the MPO received numerous comments on the LRTP from municipalities, regional entities, interest groups, and members of the public. The MPO reviewed and considered all comments during the decision-making process. A summary of written and oral comments relating to the development of the LRTP is included in Appendix A. In addition, the MPO responded to comments received during the formal comment period for the draft LRTP (August/September 2011). The comments received during the formal comment period, along with the MPO actions taken, are also included in Appendix A, in a separate table.
Environmental Justice
Environmental justice was an important factor in the development of Paths to a Sustainable Region. MPO policies promote the equitable sharing of the benefits and burdens of the region’s transportation system, as well as participation in decision making. In addition to the public outreach program described above, the MPO also has a transportation equity program to identify transportation needs of minority and low- income populations and to provide information about the planning process in order to encourage public involvement.
The MPO’s transportation equity program is composed of three key elements: outreach, analysis, and the MPO’s evaluation of environmental justice issues (see Chapter 6, Transportation Equity, for more information). After one-on-one meetings, surveys, and interviews, the MPO provides feedback to community organizations by classifying their needs and concerns as they relate to the LRTP, TIP, UPWP, transit service planning, or another agency. The information is then directed to the agency or entity that can best address each need.
In selecting projects for the LRTP, the potential impact of a proposed project on environmental justice areas is a criterion in the project ranking processes, as discussed in the section, Use of the MPO’s Visions and Policies in the Selection of Projects, below. The MPO staff gives positive ratings to projects that are estimated to benefit environmental justice areas.
As part of the LRTP process, the MPO performed a systemwide environmental justice analysis on the set of projects that are currently funded by the MPO (for 2035 conditions if no new projects were funded and constructed) and the set of projects recommended in this LRTP (2035 build conditions). The analysis focuses on the mobility, accessibility, and emissions for communities with a high proportion of low-income or minority residents (see Chapter 9, Environmental Justice Assessment, for more information).
Consultations on Environmental Issues
The MPO has responded to the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA- LU) directives by consulting with agencies responsible for land management, natural resources, historic preservation, and environmental protection and conservation, as related to transportation initiatives.
SAFETEA-LU is the federal government’s legislation for reauthorization of funding for the nation’s surface transportation program. Natural, environmental, and historic resources were mapped for the Boston region using information from the Commonwealth’s Office of Geographic and Environmental Information Systems (MassGIS). The information included Areas of Critical Environmental Concern, flood hazard areas, wetlands, water supply and wellhead protection areas, protected open space, and Natural Heritage and Endangered Species Priority Habitats, and was used in evaluating the projects. This was done by corridor in the needs assessment by overlaying the projects on the maps to determine where environmental issues could potentially arise.
The MPO staff consulted with MassDOT’s and the MBTA’s environmental divisions to determine their processes for environmental review of project designs. The Massachusetts Environmental Policy Act (MEPA) unit of the Executive Office of Energy and Environmental Affairs was also consulted. The MEPA unit oversees the Massachusetts Environmental Policy Act, which requires project proponents to study the environmental consequences of their actions and to take all feasible measures to avoid, minimize, and mitigate damage to the environment. In addition, the MPO held an environmental consultation meeting in July 2011 to discuss the environmental facets of long-range transportation issues in the region. The Executive Office of Energy and Environmental Affairs and the Department of Environmental Protection attended the meeting along with MassDOT.
Through this consultation, it was determined that the MPO was taking into consideration the appropriate areas of environmental concern. In the Boston region, environmental reviews for projects are conducted by the proponent transportation agency or municipality, not the MPO. The environmental reviews occur when each of the projects is in the design phase and prior to being funded for construction. However, the MPO is willing to consider performing further review and consultation on environmental issues, effects, and mitigation as part of the ongoing 3C process.
Development of MPO Visions and Policies
The first step in developing the LRTP was articulating the MPO’s visions for the future of the region and spelling out the policies for achieving that end state. This work was completed in the spring of 2010, with the MPO adopting the LRTP’s visions and policies. These are used to guide MPO work and, in particular, as the basis for evaluation criteria and decision making for the LRTP, UPWP, and TIP.
A complete list of the visions and policies guiding the development of the LRTP is provided in Chapter 2, The MPO’s Visions and Policies.
Selection of Projects
One of the primary components of this LRTP is a list of major capital expansion projects for implementation over the next 23 years. To select these projects, the MPO first performed a needs assessment for the region to help in determining priorities for the region. This allowed the MPO to prioritize projects from a Universe of Projects and Programs, which is a list of all possible projects for consideration.
Needs Assessment for the Region
The Regional Needs Assessment (included as Volume II of this document) was an initial step in the development of the LRTP. The needs assessment gathered, organized, and analyzed information about the state of the region’s transportation system. The needs assessment is a critical component of the LRTP because the region’s transportation needs must be inventoried before decisions are made on how problems should be addressed within the constraints of anticipated future funding.
The existing conditions of the various components of the transportation system, their current use, and their projected use in the future are all described in the needs assessment. In addition to issues related to the effective functioning of the transportation system, this needs assessment includes issues related to how the transportation system interacts with the region’s current and projected land use conditions, the environment, and low-income and minority populations. The needs assessment was developed at a corridor level using six radial corridors, two circumferential corridors, and a central area. This helped to make the transportation needs of a complex region easier to comprehend.
The needs were prioritized for each of these corridors by five of the MPO’s visions – system preservation, mobility, safety, the environment, and transportation equity. It was estimated that the needs of all of the corridors will exceed the financial resources that can be anticipated between now and 2035. Therefore, the region’s needs, which were prioritized to guide investment decisions, are summarized in Chapter 3, The Region’s Corridors, of this document (Volume I), and in Chapter 10, Regionwide Needs Assessment of Volume II, The Regional Needs Assessment.
Universe of Highway Projects and Programs
The highway Universe of Projects and Programs is composed of projects that were included in a previously adopted Long-Range Transportation Plan; projects identified through the MPO’s Congestion Management Process; projects previously studied or currently being studied; projects included in comments received during the public outreach process for the 2000–25 and 2004– 25 LRTPs and JOURNEY to 2030; projects over $10 million that are in the current TIP; and projects over $10 million included in the FFYs 2011–14 TIP Universe of Projects. The highway Universe of Projects and Programs (Appendix B) lists projects by the corridors identified in the Needs Assessment, along with information on each project’s status:
- Identified through a corridor study
- Currently in MassDOT’s environmental review or design process
- Included in the JOURNEY to 2030 LRTP (as a recommended or illustrative project)
- Included in the current TIP
- Identified through public comment
- Meets a need identified in the Needs Assessment
Universe of Transit Projects and Programs
The MBTA adopted its current Program for Mass Transportation (PMT) in December 2009. The PMT defines a long-range vision for regional mass transportation with respect to infrastructure improvements. The planning approach taken in this PMT reflects the MBTA’s priority of maintaining the existing system with MassDOT and the Commonwealth playing a major role in prioritizing and paying for transit expansions. Past versions of the PMT have placed emphasis on identification and evaluation
of potential expansion projects. The current PMT continues to include transit expansion and capacity improvements as important elements for achieving its long-range vision.
The transit Universe of Projects and Programs was derived from this PMT as well as from the MBTA Capital Investment Program (CIP), the MBTA’s five-year fiscally constrained plan for investing in the transit system, which currently includes only maintenance projects. The transit Universe of Projects and Programs (Appendix B) lists projects by the corridors identified in the Needs Assessment, along with information on each project’s status:
- Included in the current PMT
- Included in the current CIP
- Transit projects recommended as part of the MPO’s Congestion Management Process
- Included in the JOURNEY to 2030 LRTP (as a recommended or illustrative project)
- Identified through public comment
- Meets a need identified in the Needs Assessment
Investment Categories
The Universe of Projects and Programs was then organized by investment categories to better understand the degree to which different project types advance the MPO’s visions and policies. Staff conducted an evaluation to determine whether a project’s primary or secondary purposes supported the various MPO policies. The investment categories are:
- State of Good Repair and Maintenance – transit and roadway
- Multimodal Traffic Management and Modernization – transit and roadway
- Management and Operations – transit and roadway
- Expansion – transit, roadway, freight, and shared-use paths (which include MassDOT Bay State Greenway 100 paths)
- Clean Air and Mobility
The Use of the MPO’s Visions and Policies in the Selection of Projects
The MPO used its visions and policies, in the project selection process of the LRTP, as the basis for the project evaluation criteria and for the organization of the MPO’s investment categories discussed above.
For those highway and transit projects included in the Universe of Projects and Programs that met a need identified in the Needs Assessment, a very preliminary evaluation was done to determine which of the MPO’s vision topics it addressed. This information is included in Appendix B.
The next step was to evaluate how well the projects and programs advanced the MPO’s policies within each vision as well as within the investment categories listed above.
All projects that were included in the JOURNEY to 2030 LRTP, were evaluated, and projects and programs that are not included in the JOURNEY to 2030 that staff felt would advance the visions of the region were all evaluated in order to show how well their primary and secondary purposes advance the MPO’s visions and policies. This information was prepared to help the MPO select a strategy that will help to achieve its visions while adhering to its policies. This information is provided at www.bostonmpo. org/2035plan.
The Availability of Funding for Projects in the LRTP
MassDOT provided estimates of highway funding for the Boston Region’s LRTP in five- year time bands from 2011 through 2035. The estimates include the following funding categories:
- Major Infrastructure Projects
- Regional Discretionary Funding
- Federal-Aid Bridge Projects
- National Highway System/Interstate Maintenance Projects
- Statewide Maintenance
The first two categories – Major Infrastructure Projects and Regional Discretionary Funding – are the categories in which the MPO was given responsibility for project selection. The MPO used this information in developing its financially constrained LRTP.
In addition to the consideration of the various funding categories, the MPO also discussed the amount of allocation of funding to listed projects (projects that either added capacity to the system or that cost over $10 million) in relation to the amount of funding left unassigned for projects and programs that would maintain or modernize the transportation system.
The MPO agreed with the assumptions in the PMT that all transit funding would go to the MBTA’s priority of maintaining the existing system, with MassDOT and the Commonwealth prioritizing and paying for transit expansions. If the MPO were to fund additional transit projects not funded through the Commonwealth, they would do so by using highway funding flexed to transit projects.
The Development of Investment Strategies for the LRTP
MPO staff prepared three investment strategies, described below, which were designed to provide options highlighting various examples of funding possibilities for consideration. In the development of this LRTP, the MPO is facing serious funding shortfalls and severe maintenance and state-of-good-repair needs. These strategies offered the MPO several choices for working within these constraints, while still maintaining the existing system, improving mobility in all modes, achieving greenhouse gas reductions, and moving toward the other forward-looking visions and policies the MPO embraces.
- Strategy 1 – Current Approach: This strategy proposed that current programming trends continue and that the projects listed in JOURNEY to 2030 would continue to be funded with highway discretionary and major infrastructure funding in Paths to a Sustainable Region.
- Strategy 2 – Current LRTP with a Regional Needs-Based Focus: This strategy proposed highlighting from the JOURNEY to 2030 the large-scale regional solutions to identified regional needs. It focused mainly on large-scale highway projects from the JOURNEY to 2030 that address the greatest regional needs.
- Strategy 3 – New Mix of Projects and Programs – Lower Cost/More Flexibility: This strategy was developed to pull into the LRTP a more diverse set of projects and a more varied set of programs, based on identified needs. It was guided by the premise that in times of fiscal constraint, focusing on lower-cost projects would provide the flexibility to address mobility and other needs in many geographic areas of the MPO region, rather than focusing investments in only a few areas.
The MPO focused their discussions around these strategies and the investment categories discussed above. A detailed discussion on the final recommended set of projects is included in Chapter 8, The Recommended Plan.
Development of Demographic Projections
As part of the LRTP process, land use projections for the year 2035 were used to forecast travel demand. MAPC developed the demographic forecasts using MetroFuture, its long-range plan for land use, housing, economic development, and environmental preservation in the Boston region. It includes both a vision for the region’s future and a set of strategies for achieving that future. The MPO adopted the MetroFuture projections for the 101 municipalities in the Boston Region MPO in April 2008. At the same time, the MPO agreed to use the forecasts from the neighboring regional planning agencies for the 63 municipalities that are in the modeled area but that are outside of the Boston Region MPO area. This land use is referred to as the Regional Planning Agency (RPA) Hybrid Scenario, which is used as an input into the MPO’s travel demand model, discussed below.
Travel Demand Forecasts
In developing Paths to a Sustainable Region, the MPO conceptualized the region’s transportation needs over the next 23 years. Land use patterns, growth in employment and population, and trends in travel patterns differ in how they affect demands on the region’s transportation system. In order to estimate future demands on the system for this LRTP, the MPO utilized a regional travel-demand forecast model. The model is a planning tool used to evaluate the impacts of transportation alternatives given varying assumptions with regard to population, employment, land use, and traveler behavior. The model is used to assess potential projects in terms of air quality benefits, travel-time savings, and congestion reduction.
Illustrative Projects
Illustrative projects are defined as projects that could significantly contribute toward the MPO visions, but which are not included in the recommended list of projects because there is not sufficient revenue to fund them. During the development of this document, the MPO decided not to include illustrative projects in the LRTP. Since there is a significant backlog of maintenance and state-of-good repair work to be done on the highway and transit system, the MPO did not want to highlight specific unprogrammed infrastructure projects that it would select if additional funding were to become available. As described above, under the Universe of Highway and Transit Projects and Programs, projects that were included as illustrative projects in the last LRTP – JOURNEY to 2030, are shown in Appendix B.
Looking Forward
The MPO views the LRTP as a living document. Implementing this plan will be an integral part of the ongoing planning process. The needs assessment will be updated in an ongoing manner, as new information and analysis are available. Performance measures for the region will be developed and applied. Input from public involvement
will be added to information surfacing from these two initiatives to help the MPO assess its progress toward its visions.
BACKGROUND
In addition to its transportation equity program (discussed in Chapter 6), the MPO has performed a detailed, system-level analysis of transportation equity in the region, examining the distribution of the transportation system’s benefits and burdens among environmental justice and non–environmental justice areas and among environmental
justice and non–environmental justice population zones. (These types of areas and zones are defined in the section below.) The analysis also examined the impacts, in terms of various analysis factors, of this LRTP’s recommended set of projects through 2035 (see Chapter 8 for the list of projects) on those types of areas and zones. The measures focus on mobility, accessibility, and environmental-impact concerns.
As interpreted from federal guidance, the MPO should recommend a regional set of transportation projects in its LRTP that does not burden environmental justice
areas when compared to a network that includes no projects other than those already underway. The results of the final analysis, summarized in this chapter, show that the MPO’s recommended set of transportation projects does not burden environmental justice areas and environmental justice population zones more than the 2035 No-Build network and, in several cases, benefits them.
Paths to a Sustainable Region Environmental Justice
Assessment
In addition to its transportation equity program (discussed in Chapter 6), the MPO has performed a detailed, system-level analysis of transportation equity in the region, examining the distribution of the transportation system’s benefits and burdens among environmental justice and non–environmental justice areas and among environmental
justice and non–environmental justice population zones. (These types of areas and zones are defined in the section below.) The analysis also examined the impacts, in terms of various analysis factors, of this LRTP’s recommended set of projects through 2035 (see Chapter 8 for the list of projects) on those types of areas and zones. The measures focus on mobility, accessibility, and environmental-impact concerns.
As interpreted from federal guidance, the MPO should recommend a regional set of transportation projects in its LRTP that does not burden environmental justice
areas when compared to a network that includes no projects other than those already underway. The results of the final analysis, summarized in this chapter, show that the MPO’s recommended set of transportation projects does not burden environmental justice areas and environmental justice population zones more than the 2035 No-Build network and, in several cases, benefits them.
Geography Used for Outreach and Accessibility Analysis
As discussed in Chapter 6, environmental justice areas are based on the demographics of the people living in a transportation analysis zone (TAZ). TAZs are an aggregation of census geography based on population and numbers of trips. According to the definition used for the MPO’s transportation equity program, “A TAZ will be considered an environmental justice area if it is over 50 percent minority or has a median household income at or below 60 percent of the region’s median [income]” (60% of the region’s median household income of $55,800 is $33,480).1 (Environmental justice areas are presented in Figures 6-1 and 6-2 (in Chapter 6).
In addition to being the focus of the transportation equity program, environmental justice areas are used in the accessibility portion of the MPO’s environmental justice analysis, as described in this chapter.
Geography Used for Mobility, Congestion, and Air Quality Analysis
In the mobility, congestion, and environmental quality portions of the analysis, environmental justice population zones are used. To locate environmental justice populations, the MPO selected broader criteria for lower-income and minority TAZs than those used for locating environmental justice areas. Though not required, this greater inclusion of TAZs is in line with—and slightly more inclusive than—the Massachusetts Executive Office of Energy and Environmental Affairs (EOEEA) definition of environmental justice populations. The broader criteria avoid masking data for isolated TAZs and include more environmental justice populations. The MPO’s thresholds for these environmental justice populations are:
The environmental justice population zones in the Boston Region MPO area and in the urban core are shown in Figures 9-1 and 9-2, respectively.
The 2035 demographic forecasts assumed the same distributions of the environmental justice areas and environmental justice population zones as were observed in the 2000 census, and that the environmental justice population’s growth rate will be the same as the rate that the Metropolitan Area Planning Council has forecast for the overall population of the given area. The 2035 Build and 2035 No-Build networks were based
on the same demographic forecasts but developed unique distributions of trip flows based on the transportation network for the No-Build and Build scenarios.
The MPO used several factors as indicators of benefits and burdens for environmental justice and non–environmental justice areas. These factors are:
The first factor was applied to environmental justice and non–environmental justice areas, the second and third to environmental justice population zones and non– environmental justice population zones.
To avoid confusion, environmental justice areas and environmental justice zones will both be referred to as environmental justice areas in the remainder of this chapter.
FIGURE 9-1
ENVIRONMENTAL JUSTICE POPULATION ZONES – REGIONWIDE

FIGURE 9-2
ENVIRONMENTAL JUSTICE POPULATION ZONES – CENTRAL AREA

Accessibility Analysis
MPO staff analyzed access to needed services and jobs in terms of average transit and highway travel times from environmental justice areas to industrial, retail, and service employment opportunities; health care; and institutions of higher education. The analysis of transit travel times included destinations within a 40-minute transit trip, and the analysis of highway travel times included destinations within a 20-minute auto trip. The accessibility analysis also included an examination of the number of destinations within a 40-minute transit trip and a 20-minute auto trip. The thresholds of a 40-minute transit trip and 20-minute highway trip represent average commute times in the region based on the 2000 census Journey-to-Work data.
Staff examined differences between the 2035 No-Build network and the 2035 Build network for environmental justice and non–environmental justice areas. The accessibility analysis factors were:
Mobility, Congestion, and Air Quality Analysis
MPO staff analyzed mobility, congestion, and environmental impacts by comparing analysis factors for environmental justice areas to those for non–environmental justice areas. Staff examined differences between the average levels of these analysis factors within the two types of areas for the 2035 No-Build network and the 2035 Build network.
The mobility, congestion, and air quality analysis factors were:
The environmental justice analysis determined that while the 2035 recommended LRTP Build network improves accessibility, mobility, and congestion conditions relative to the 2035 No-Build network for both environmental justice and non–environmental justice areas, it benefits environmental justice areas slightly more. Carbon monoxide emissions are higher in environmental justice areas than in non-environmental justice areas in both the No-Build and the Build networks, and they increase for both populations in the Build network over the No-Build. Results are summed for each type of area and are averaged by the number of environmental justice and non–environmental justice TAZs, respectively.
Accessibility Analysis Results:
Results from the accessibility analysis show the following for trips from environmental justice areas to nearby jobs, colleges, and hospitals:
Figure 9-3 shows that average transit travel times to area jobs are approximately 30 minutes, with those for environmental justice areas slightly less than for non– environmental justice areas. Travel times to hospitals and colleges are higher for environmental justice areas in both the No-Build and Build networks.
FIGURE 9-3
AVERAGE TRANSIT TRAVEL TIMES TO DESTINATIONS FOR ENVIRONMENTAL AND NON-ENVIRONMENTAL JUSTICE AREAS IN THE 2035 NO-BUILD AND 2035 BUILD NETWORKS

While Figure 9-4 shows that average highway travel times to colleges and hospitals are slightly less for environmental justice areas than for non–environmental justice areas, the differences in average highway travel time to jobs are statistically insignificant.
FIGURE 9-4
AVERAGE HIGHWAY TRAVEL TIMES TO DESTINATIONS FOR ENVIRONMENTAL AND NON-ENVIRONMENTAL JUSTICE
AREAS IN THE 2035 NO-BUILD AND 2035 BUILD NETWORKS

Figures 9-5 to 9-7 show that the average environmental justice area has transit and highway access to notably more jobs than the average non–environmental justice area. In addition, environmental justice populations can access more jobs by transit in the Build network than in the No-Build network.
FIGURE 9-5
AVERAGE NUMBER OF INDUSTRIAL JOBS TO WHICH THERE IS ACCESS FOR ENVIRONMENTAL AND
NON-ENVIRONMENTAL JUSTICE AREAS IN THE 2035 NO-BUILD AND 2035 BUILD NETWORKS

FIGURE 9-6
AVERAGE NUMBER OF RETAIL JOBS TO WHICH THERE IS ACCESS FOR ENVIRONMENTAL AND
NON-ENVIRONMENTAL JUSTICE AREAS IN THE 2035 NO-BUILD AND 2035 BUILD NETWORKS

FIGURE 9-7
AVERAGE NUMBER OF SERVICE JOBS TO WHICH THERE IS ACCESS FOR ENVIRONMENTAL AND
NON-ENVIRONMENTAL JUSTICE AREAS IN THE 2035 NO-BUILD AND 2035 BUILD NETWORKS

Figure 9-8 shows that the average environmental justice area has transit and highway access to notably more two- and four-year colleges than the average non–environmental justice area. The figure also shows that people in environmental justice areas are estimated to have access to more colleges in the Build network than in the No-Build network.
FIGURE 9-8
AVERAGE NUMBER OF COLLEGES (IN TERMS OF COLLEGE ENROLLMENT) TO WHICH THERE IS ACCESS
FOR ENVIRONMENTAL AND NON-ENVIRONMENTAL JUSTICE AREAS IN THE 2035 NO-BUILD
AND 2035 BUILD NETWORKS

Figure 9-9 shows that the average environmental justice area has transit and highway access to more hospital beds than the average non–environmental justice area.
FIGURE 9-9
AVERAGE NUMBER OF HOSPITAL BEDS TO WHICH THERE IS ACCESS FOR ENVIRONMENTAL AND
NON-ENVIRONMENTAL JUSTICE AREAS IN THE 2035 NO-BUILD AND 2035 BUILD NETWORKS

Mobility, Congestion, and Air Quality Analysis Results:
Results from the mobility, congestion, and environmental analysis show the following for trips within environmental justice areas:
Figure 9-10 shows that average transit travel times for attractions and productions are shorter for environmental justice areas than for non–environmental justice areas.
FIGURE 9-10
AVERAGE TRANSIT TRAVEL TIMES FOR ENVIRONMENTAL AND NON-ENVIRONMENTAL JUSTICE POPULATION ZONES IN THE 2035 NO-BUILD AND 2035 BUILD NETWORKS

Figure 9-11 shows that there is no statistical difference in average highway attraction and production travel times for environmental justice areas and non-environmental justice areas.
FIGURE 9-11
AVERAGE HIGHWAY TRAVEL TIMES FOR ENVIRONMENTAL AND NON-ENVIRONMENTAL JUSTICE POPULATION ZONES IN THE 2035 NO-BUILD AND 2035 BUILD NETWORKS

Both figures show that differences in average travel time between environmental justice population zones and non–environmental justice population zones are more pronounced for transit than for highway trips.
Figure 9-12 shows that average congested VMT is less for environmental justice areas
than for non–environmental justice areas.
FIGURE 9-12
AVERAGE CONGESTED VEHICLES MILES TRAVELED (VMT ) FOR ENVIRONMENTAL AND NON-ENVIRONMENTAL JUSTICE POPULATION ZONES IN THE 2035 NO-BUILD AND 2035 BUILD NETWORKSS

Figure 9-13 shows that average VMT per square mile is greater for environmental justice areas than for non–environmental justice areas in both the No-Build and Build networks.
FIGURE 9-13
AVERAGE VMT FOR ENVIRONMENTAL AND NON-ENVIRONMENTAL JUSTICE
POPULATION ZONES IN THE 2035 NO-BUILD AND 2035 BUILD NETWORKS

Figure 9-14 shows that average CO emissions are greater for environmental justice areas than for non–environmental justice areas in both the No-Build and Build networks.
FIGURE 9-14
AVERAGE CARBON MONOXIDE (CO ) EMISSIONS PER SQUARE MILE FOR ENVIRONMENTAL AND NON-ENVIRONMENTAL JUSTICE POPULATION ZONES IN THE 2035 NO-BUILD AND 2035 BUILD NETWORKS

The following transit project in the LRTP will improve air quality and provide more transportation options for environmental justice populations:
The following highway project will benefit people living in nearby and adjacent environmental justice areas in the following ways: