Project Rescoring

 

Bicycle Network and Pedestrian Connections Program

Proponent Project Number Project Name Previous Score Total Score Total Base Score Total Scaled Equity Score Safety Safety Equity Score Mobility and Reliability Mobility and Reliability Equity Score Access and Connectivity Access and Connectivity Equity Score Resilience Resilience Equity Score Clean Air and Healthy Communities Clean Air and Healthy Communities Equity Score
Medford 611982 Medford- Shared Use Path Connection at the Route 28/Wellington Underpass N/A 53 49.5 3.5 15 4.5 10.5 1.75 13 2 3 -0.5 8 1
Lynnfield 613163 Lynnfield- Rail Trail Construction, from Ford Avenue to Nichols Lane N/A 50 47 3 12 3.5 12 1.5 9 1 4 -0.5 10 2
Arlington 609531 Arlington- Stratton School Improvements N/A Not scored - - - - - - - - - - - -
Maximum       100 80 20 16   15   17   16   16  

 

 

Complete Streets Program

Proponent Project Number Project Name Previous Score Total Score Total Base Score Total Scaled Equity Score Safety Safety Equity Score Mobility and Reliability Mobility and Reliability Equity Score Access and Connectivity Access and Connectivity Equity Score Resilience Resilience Equity Score Clean Air and Healthy Communities Clean Air and Healthy Communities Equity Score
Boston 606453 Boston- Improvements on Boylston Street, from Intersection of Brookline Avenue and Park Drive to Ipswich Street 58/134 62 54.5 7.5 8.5 3.75 13 6.75 14 3.75 9 2.25 10 2.25
MassDOT 605168 Hingham- Improvements on Route 3A, from Otis Street/Cole Road including Summer Street and Rotary, Rockland Street to George Washington Boulevard 55/134 Not scored - - - - - - - - - - - -
Everett 609257 Everett- Reconstruction of Beacham Street 54/134 57 49 8 9 5 15 8 12 3 6 2 7 2
Woburn 610662 Woburn- Roadway and Intersection Improvements at Woburn Common, Route 38 (Main Street), Winn Street, Pleasant Street, and Montvale Avenue 75/134 47.5 43 4.5 8 3 11 3.75 9 3 8 0 7 1.5
Boston 606226 Boston- Reconstruction of Rutherford Avenue, from City Square to Sullivan Square N/A 69 64 5 10 2.5 16 5 15 2.5 12 1 11 1.5
Maximum       100 80 20 16   19   15   14   16  

 

Intersection Improvements Program

Proponent Project Number Project Name Previous Score Total Score Total Base Score Total Scaled Equity Score Safety Safety Equity Score Mobility and Reliability Mobility and Reliability Equity Score Access and Connectivity Access and Connectivity Equity Score Resilience Resilience Equity Score Clean Air and Healthy Communities Clean Air and Healthy Communities Equity Score
Lexington S13146 Lexington- Design of the Reconstruction of the Interstate 95 and Route 4/225 Interchange N/A 49.8 45 4.8 13 5.25 7 2.25 12 2.25 6 0 7 2.25
MassDOT 605857 Norwood- Intersection Improvements at Route 1 and University Avenue/Everett Street 55/134 34.65 31.5 3.15 11 4.5 7.5 2.625 6 0.75 1 -1.5 6 1.5
Maximum       100 80 20 25   18   14   12   11  

 

Abbreviations:

MassDOT = Massachusetts Department of Transportation