FFYs 2026-30 TIP Project Scoring and Re-Scoring

 

Bicycle Network and Pedestrian Connections Program

Proponent Project Number Project Name MAPC Subregion MassDOT District Project Status Readiness Year (Planned) Project Cost (Adjusted) Total Score Total Base Score Total Scaled Equity Score Safety  Safety Equity Score Mobility and Reliability Mobility and Reliability Equity Score Access and Connectivity Access and Connectivity Equity Score Resilience Resilience Equity Score Clean Air and Healthy Communities Clean Air and Healthy Communities Equity Score
Cambridge 613658 Cambridge- New Bridge and Shared-Use Path Construction over Fitchburg Line at Danehy Park Connector ICC 6 PRC-Approved (5/31/2024) 2030 $18,238,535 81 73.5 7.5 14.5 3.75 15 7 13 2.5 17 3 14 2.5
Concord 612870 Concord- Assabet River Multi-Use Trail and Bridge Construction MAGIC 4 PRC-Approved (8/29/2022) 2030 $9,604,800 55.9 51 4.9 14 5.5 10 2 11 1.25 9 2 7 1.5
Newton 613594 Needham-Newton- Bridge Replacement on Christina Street ICC/TRIC 6 PRC-Approved (10/12/2023) 2030 $5,551,514 66.4 61 5.4 13 5.5 12 2.5 9 1 12 1.5 15 3
                100 80 20 16   15   17   16   16  

 

 

 

Complete Streets Program

Proponent Project Number Project Name MAPC Subregion MassDOT District Project Status Readiness Year (Planned) Project Cost (Adjusted) Total Score Total Base Score Total Scaled Equity Score Safety  Safety Equity Score Mobility and Reliability Mobility and Reliability Equity Score Access and Connectivity Access and Connectivity Equity Score Resilience Resilience Equity Score Clean Air and Healthy Communities Clean Air and Healthy Communities Equity Score
Bolton 613885 Bolton- Reconstruction of Route 117 (Main Street) from 200 feet west of John Powers Lane to the Intersection of Mechanic Street including Culvert Replacement MAGIC 3 PRC-Approved (10/2/2024) 2030 $8,698,405 47.2 42 5.2 8 4.5 8 2.5 7 1.5 10 2 9 2.5
Chelsea, Everett 613585 Chelsea-Everett- Reconstruction of Vine Street and Third Street from Chelsea Street to 2nd Street ICC 4 PRC-Approved (10/12/2023) 2030 $13,119,298 67.1 59 8.1 14 6 12 5.25 12 3 12 2.25 9 3.75
Framingham S12977 Framingham- Preliminary Design of Intersection Improvements at Route 126/135/MBTA & CSX Railroad MWRC 3 Preliminary Design 2026 $1,400,000 TBD 0 0 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD
Lexington 613695 Lexington- Roadway Reconstruction on Hartwell Avenue and Bedford Street MAGIC 4 25% Design Submitted 2030-2032 $46,195,840 73.2 67 6.2 12 5.5 13 4 11 1 16 2 15 3
Lexington S12978 Lexington- Design of Safety Improvements at the Interstate 95 and Route 4/225 Interchange MAGIC 4 PRC-Approved (Design Only) 2026 $1,650,000 TBD 0 0 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD
Marblehead 612947 Marblehead- Village Street Bridge Replacement M-04-001 NSTF 4 PRC-Approved 2030 $5,166,582 36 31 5 6 3.5 9 6 -1 1.5 6 -1 11 2.5
Melrose 612534 Melrose- Lebanon Street Improvement Project (Lynde Street to Malden City Line)  ICC 4 25% Design Submitted 2028(?) $10,528,000 55.8 51 4.8 11 4 13 4 12 2.5 6 -0.5 9 2
Needham 612536 Needham- Reconstruction of Highland Avenue, from Webster Street to Great Plain Avenue ICC/TRIC 6 PRC-Approved 2030 $15,776,000 62.4 50 12.4 9.5 6 11 10.5 12.5 5.5 4 1.5 13 7.5
                100 80 20 16   19   15   14   16  

 

 

 

Intersection Improvements Program

Proponent Project Number Project Name MAPC Subregion MassDOT District Project Status Readiness Year (Planned) Project Cost (Adjusted) Total Score Total Base Score Total Scaled Equity Score Safety  Safety Equity Score Mobility and Reliability Mobility and Reliability Equity Score Access and Connectivity Access and Connectivity Equity Score Resilience Resilience Equity Score Clean Air and Healthy Communities Clean Air and Healthy Communities Equity Score
Wenham 609388 Wenham- Safety Improvements on Route 1A NSTF 4 75% Package Received (2/8/2024) 2028(?) $5,337,157 35.2 32 3.2 17 6.5 9 2.5 7.5 1 -4 -2.5 2.5 0.5
                100 80 20 25   18   14   12   11  

 

 

 

Transit Transformation Program

Proponent Project Number Project Name MAPC Subregion MassDOT District Project Status Readiness Year (Planned) Project Cost (Adjusted) Total Score Total Base Score Total Scaled Equity Score Safety  Safety Equity Score Mobility and Reliability Mobility and Reliability Equity Score Access and Connectivity Access and Connectivity Equity Score Resilience Resilience Equity Score Clean Air and Healthy Communities Clean Air and Healthy Communities Equity Score
CATA S12969 CATA- Gloucester Facility Modernization NSTF 4 N/A 2026 $312,500 TBD 0 0 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD
CATA S13202 CATA- Automatic Passenger Counting and Automatic Vehicle Location Deployment (Transit Project ID CATA011695) NSTF 4 N/A 2026 $680,000 29.4 26 3.4 0 0 11 4.5 9 2.5 4 0.5 2 1
CATA S12970 CATA- FFY 2026 Revenue Vehicle Replacement (Bus 1001, 1002, 1201) [Transit Project ID RTD0010591] NSTF 4 N/A 2026 $1,800,000 TBD 0 0 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD
MBTA N/A MBTA- Better Bus Project - Operational Safety Improvements at Bus Stops ICC, SSC, TRIC 4, 5, 6 N/A 2026 $3,216,897 44.6 39 5.6 10 1 12 4 11 7.5 3 0 3 1.5
MBTA S13212 MBTA- Bus Priority and Accessibility Improvements (PATI) Regionwide 4, 5, 6 N/A 2026 $7,000,000 48 42 6 11 1 13 5 13 8 3 0 2 1
MBTA S13207 MBTA- Natick Center Station Accessibility Improvements (Natick) MWRC 3 Underway 2026 $2,500,000 53.6 47 6.6 11 1 12 5 19 9 2 0 3 1.5
MBTA N/A MBTA- Rail Modernization - Early Action Items: Beverly Depot Grade Crossing Elimination NSTF 4 N/A 2026 $10,000,000 38 34 4 8 1 8 4 6 1.5 8 1.5 4 2
MBTA S13208 MBTA- Wellesley Station Upgrades MWRC 6 N/A 2026 $5,000,000 43.6 38 5.6 10 1 7 3 17 9 2 0 2 1
MBTA S13201 MBTA- West Broadway Ductbank Replacement ICC 6 N/A 2026 $25,000,000 23.8 21 2.8 3 0.5 9 3.5 6 1.5 1 0.5 2 1
MBTA S13206 MBTA- Catamaran Overhaul ICC, NSTF, SSC 4, 5, 6 N/A 2026 $2,634,000 25 22 3 6 1 8 3 5 2 1 0.5 2 1
MWRTA S12972 MWRTA- CNG Vehicle Procurement Project (6 29 foot Gillig buses) MWRC 3 N/A 2026 $4,200,000 52.6 47 5.6 8 1 12 4 14 5 5 0.5 8 3.5
MWRTA S12971 MWRTA- Blandin Hub Accessible Redesign MWRC 3 N/A 2026 $7,750,000 64 52 12 8 2 13 9 16 10 9 3 6 6
                100 79 21 16   16   16   16   15  

 

 

 

Community Connections Program

Proponent Project Name MAPC Subregion MassDOT District Project Cost Readiness Year(s) Cost/Point Total Score Connectivity Regional and Interlocal Coordination Plan Implementation Transportation Equity Climate Change Mitigation Performance Management
Boston Boston- BikeShare Replacement (20 Stations, 380 Docks) ICC 6 $783,860 2026 $11,119 70.5 14 10 10 13.5 13 10
Brookline Brookline- BikeShare Expansion (3 Stations, 10 eBikes) ICC 6 $238,646 2026 $3,536 67.5 11.5 10 14 11 15 6
Cambridge Cambridge- FFY 2026 BikeShare Replacement (7 Stations, 123 Docks) ICC 6 $268,458 2026 $4,099 65.5 12.5 6 14 10 16 7
Marblehead Marblehead- Bicycle Rack Procurement (22 Racks, 117 Spaces) NSTF 4 $6,250 2026 $102 61 10 11 13 6 12 9
Newton Newton- Bicycle Rack, Shelter, and RRFB Procurement (67 Racks, 2 Shelters, 12 RRFBs) ICC 6 $473,132 2026 $7,393 64 12 7 16 9 11 9
Somerville Somerville - FFY 2026 BikeShare Replacement (40 Bikes, 40 Docks, 10 Slabs) ICC 4 $107,417 2026 $1,591 67.5 11.5 10 14 11 15 6
Chelsea Chelsea- BikeShare Expansion (3 Stations, 28 Bikes, 3 eBikes) NSTF 4 $86,228 2026 $1,306 66 14 10 12 10 13 7
                             

 

 

Abbreviations

CATA = Cape Ann Transportation Authority. CNG = Compressed Natural Gas. MBTA = Massachusetts Bay Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. PRC = MassDOT's Project Review Committee. RRFB = Rapid Reflective Flashing Beacon. TBD = To be determined.

Metropolitan Area Planning Council (MAPC) Subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.