Scenario 2: Baseline (as of 3/28/2024)

TIP ID Proponent(s) Project Name MPO Score Investment Category MAPC
Subregion
FFY 2024–28 Programmed Year(s) FFY 2025–29
Programmed Year(s)
Design Status FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 (New) Other Non-Target Funds Adjusted TFPC
 (FFYs 2025-29)
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 BP NSTF 2025 2025 25% Received
R1
$15,777,132 $13,966,099 $0 $0 $0 $0 $0 $0 $0 $0 $13,966,099
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 BP ICC 2026 2027 25% Received $0 $0 $21,288,202 $8,000,000 $0 $12,499,750 $0 $0 $0 $0 $21,288,202
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 BP ICC 2027 2028 Approved $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,684,622
610691 Natick COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 BP MWRC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $7,760,451 $7,492,849 $0 $0 $7,492,849
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 BP NSTF 2028 2028 Approved $0 $0 $0 $0 $0 $0 $8,932,000 $8,624,000 $0 $0 $8,624,000
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 BP MAGIC N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $8,526,000 $0 $8,820,000
S12694 Newton NEWMO MICROTRANSIT SERVICE EXPANSION 87 CC ICC 2023-25 2023-24 N/A $209,663 $0 $0 $0 $0 $0 $0 $0 $0 $0 $477,909
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 CC MAGIC 2023-25 2023-25 N/A $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $836,995
S12697 Watertown PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 CC ICC 2023-25 2023-25 N/A $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $564,373
S12700 CATA CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION – ROCKPORT AND LANESVILLE 61.75 CC NSTF 2023-25 2023-25 N/A $214,776 $214,776 $0 $0 $0 $0 $0 $0 $0 $0 $214,776
S12699 Stoneham STONEHAM SHUTTLE SERVICE 72 CC NSPC 2023-25 2023-25 N/A $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $466,628
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 CC MWRC 2023-25 2023-25 N/A $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $308,913
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 CC MWRC 2024-26 2024-26 N/A $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $380,477
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A CC REGIONWIDE 2025-28 2026-29 Administrative $1,000,000 $0 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $7,500,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A CC REGIONWIDE 2025-28 2026-29 Administrative $909,679 $0 $2,337,500 $1,887,222 $2,500,000 $2,036,193 $2,500,000 $2,000,000 $2,500,000 $0 $10,337,500
S12958 Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 CC ICC N/A 2025 N/A $0 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $590,348
S12960 Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 CC ICC N/A 2025 N/A $0 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $385,456
S12959 Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 CC ICC N/A 2025 N/A $0 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $379,470
S12962 Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 CC ICC N/A 2025 N/A $0 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $278,127
S12691 Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 CC ICC N/A 2025 N/A $0 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $200,000
S12694 Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK  63.5 CC ICC N/A 2025 N/A $0 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $169,000
S12965 Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 CC ICC N/A 2025 N/A $0 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $90,878
S12966 Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 CC ICC N/A 2025 N/A $0 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $81,250
S12967 Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 CC SSC N/A 2025 N/A $0 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $22,800
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 CC ICC N/A 2025-27 N/A $0 $499,649 $0 $450,278 $0 $463,807 $0 $0 $0 $0 $1,413,375
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 59 CS NSPC 2025 2025 100% Received $23,731,429 $37,978,347 $0 $0 $0 $0 $0 $0 $0 $0 $37,978,347
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   55 CS SSC 2025 2026 25% DPH $15,018,900 $0 $0 $28,738,432 $0 $0 $0 $0 $0 $0 $33,754,352
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 58 CS ICC 2025 2026 25% Received R1 $8,665,052 $0 $0 $8,665,052 $0 $0 $0 $0 $0 $0 $9,011,654
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 CS ICC 2025 2027 Approved $10,548,928 $0 $0 $0 $0 $10,954,656 $0 $0 $0 $0 $11,392,842
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 CS MWRC 2025 2028 25% Comments $742,315 $0 $0 $0 $0 $0 $0 $836,339 $0 $480,000 $1,316,340
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 CS ICC 2025 2026-27 Approved $19,698,640 $0 $0 $10,000,000 $0 $9,698,640 $0 $0 $0 $0 $21,274,531
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 CS SWAP 2026 2026 25% Received
R2
$0 $0 $9,758,201 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 CS ICC 2026 2027 Approved $0 $0 $16,632,000 $0 $0 $16,632,000 $0 $0 $0 $0 $17,297,280
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 CS NSTF 2026 2027 75% Received $0 $0 $14,172,868 $0 $0 $26,122,722 $0 $0 $0 $0 $26,122,722
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 CS MWRC 2026 2027 25% DPH $0 $0 $16,420,119 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 75 CS NSPC 2026 2027 Approved $0 $0 $17,382,600 $0 $0 $17,382,600 $0 $0 $0 $0 $17,382,600
611983 Chelsea CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 69.9 CS ICC 2027 2027 Approved $0 $0 $0 $0 $11,705,708 $11,287,647 $0 $0 $0 $0 $11,705,708
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 CS ICC 2027 2028 Approved $0 $0 $0 $0 $28,995,267 $0 $0 $10,000,000 $18,995,267 $0 $30,155,078
613145 Wakefield WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 61.8 CS NSPC 2028 2028 Approved $0 $0 $0 $0 $0 $0 $16,581,200 $18,435,976 $0 $0 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 53.3 CS TRIC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $22,094,875 $12,854,847 $10,000,000 $0 $22,854,846
605743 Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 47 CS NSTF 2026-27 2027-28 25% Received R1 $0 $0 $5,702,076 $0 $6,026,622 $6,000,000 $0 $5,728,698 $0 $0 $12,197,846
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 CS ICC 2027-30 2028-31 Approved $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $15,000,000 $20,000,000 $0 $45,897,600
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 54.3 CS SWAP N/A 2028 Approved $0 $0 $0 $0 $0 $0 $0 $0 $8,340,000 $0 $16,680,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 CS NSTF N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $5,368,966 $0 $5,368,966
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 52 II NSPC 2025 2025 25% Approved $1,978,080 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 II ICC 2025 2026 75% Received $6,315,013 $0 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $9,807,515
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 II MWRC 2026 2026 75% Received $0 $0 $2,185,303 $3,237,804 $0 $0 $0 $0 $0 $0 $3,237,804
613121 MassDOT EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 N/A II ICC 2027 N/A Approved $0 $0 $0 $0 $5,246,920 $0 $0 $0 $0 $0 $5,059,530
605857 Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  55 II TRIC 2026-27 2026-27 25% Received R1 $0 $0 $11,125,872 $27,636,336 $17,573,400 $0 $0 $0 $0 $0 $28,699,272
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 II ICC N/A 2026 75% Received $0 $0 $0 $1,885,353 $0 $0 $0 $0 $0 $0 $1,957,866
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 MI ICC 2027-30 2027-31 Approved $0 $0 $0 $0 $35,000,000 $30,000,000 $30,000,000 $30,000,000 $30,310,000 $0 $88,250,000
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 MI ICC 2027-32 2028-32 25% Received R1 $0 $0 $0 $0 $8,600,000 $0 $33,500,000 $33,500,000 $45,000,000 $0 $197,759,449
TBD Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD MI MAGIC N/A 2026 N/A $0 $0 $0 $1,650,000 $0 $0 $0 $0 $0 $0 $1,650,000
TBD Framingham FRAMINGHAM- DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA & CSX RAILROAD TBD MI MWRC N/A 2026 N/A $0 $0 $0 $1,400,000 $0 $0 $0 $0 $0 $0 $1,400,000
S12825 CTPS PROJECT DESIGN SUPPORT PILOT N/A N/A REGIONWIDE 2025 2025 Administrative $4,000,000 $10,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0
S12821 MBTA RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A TT NSPC 2024 2024-25 N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $14,000,000
S12822 MBTA COLUMBUS AVE BUS LANE PHASE II N/A TT ICC 2021, 2024 2021, 2024-25 N/A $0 $7,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $11,750,000
S12819 MBTA JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC 2024-25 2024-25 N/A $14,000,000 $21,250,000 $0 $0 $0 $0 $0 $0 $0 $0 $33,500,000
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A TT REGIONWIDE 2025-28 2026-29 Administrative $2,000,000 $0 $6,500,000 $5,000,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $24,500,000
TBD MBTA CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC N/A 2025 100% design, advertising September 2024. Complete May 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
TBD MBTA MBTA SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A TT ICC, SSC, TRIC, NSTF  N/A 2025 5-10% design, advertising summer 2025, complete spring 2026 for furnishings and fall 2026 for control systems. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000
TBD MBTA RAIL MODERNIZATION - FITCHBURG LINE IMPROVEMENTS (KENDAL GREEN) N/A TT MWRC N/A 2025 N/A - Design Build
Completion December 2026
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,000,000
TBD MBTA MBTA MATTAPAN SQUARE RECONFIGURATION (BOSTON) N/A TT ICC N/A 2025-26 15% design with substantial outreach and conceptual work to date.  Advertise fall 2025, Complete summer 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
TBD MBTA MBTA NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A TT ICC N/A 2025 Approaching 15% design, advertise January 2025 and complete May 2025. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
611974 MassDOT MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE N/A II ICC 2026 2026 NTP issued (5/19/2021)
for FFY26 advertisement.
$0 $0 $0 $0 $0 $0 $0 $0 $0 $8,498,000 $1,625,250
609531 MassDOT ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A BP ICC 2025 2025 75% Received - R1 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,625,250 $5,000,000
611982 MassDOT MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A BP ICC 2025 2025 75% Received $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,509,294 $5,000,000
TBD MWRTA MWRTA- PROCUREMENT OF THREE 29 FOOT BUSES 52.2 TT MWRC N/A 2025 N/A $0 $1,980,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,980,000
TBD CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS TBD TT NSTF N/A 2025 N/A $0 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $65,000
TBD CATA CATA - CATA GLOUCESTER FACILITY MODERNIZATION TBD TT NSTF N/A 2025 N/A   $1,293,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,293,000
TBD MWRTA MWRTA- BLANDIN HUB EQUITABLE REDESIGN INITIATIVE TBD TT MWRC N/A 2025-26 N/A $0 $1,750,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,500,000
TBD CATA CATA - VEHICLE REPLACEMENT (4 VEHICLES) TBD TT NSTF N/A 2025-26 N/A $0 $1,710,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,460,000

 

Federal Fiscal Year 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 (New) 2025-29 Total
Total Available Regional Highway Target Funds (2025-29 TIP): $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $155,132,142 $158,052,175 $158,052,175 $161,030,608 $727,928,301
                     
Draft Total Programmed Regional Highway Target Funds: $125,975,489 $111,008,393 $124,667,241 $124,569,057 $144,006,044 $171,577,727 $149,868,526 $157,830,836 $157,540,233 $722,526,247
Regional Highway Target Funds Remaining (Unprogrammed): $2,452,200 $17,419,296 $618,447 $716,630 $11,126,099 -$16,445,585 $8,183,649 $221,339 $3,490,375 $5,402,054
Percent Unprogrammed 1.9% 13.6% 0.5% 0.6% 7.2% -10.6% 5.2% 0.1% 2.2% 0.7%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2024 TIP readiness meeting.
Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.
Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.
Black, bolded text on project names indicates an administrative line item.  These line items often set aside funding to be allocated in future TIP cycles.  
Indicates a project was recommended to move out to a later TIP year.
Indicates a project is proposed to added to the TIP.  
Indicates a project proposed for additional changes in this Scenario beyond those made at the February 2024 TIP Readiness Meeting.
Indicates a project to be considered for the scenario.  The estimated cost of the project can be found in the final column, and the corresponding blue cell indicates its readiness year(s).

 

Abbreviations:

TIP investment programs: BP = Bicycle and Pedestrian. CC = Community Connections. CS = Complete Streets. II = Intersection Improvements. MI = Major Infrastructure. TT = Transit Transformation

Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.

Other abbreviations:

CATA = Cape Ann Transportation Authority. C.L. = city line. CTPS = Central Transportation Planning Staff. DPH = design public hearing. FFY = federal fiscal year. MAPC = Metropolitan Area Planning Council. MART = Montachusett Regional Transit Authority. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NewMo = Newton in Motion. NTP = notice to proceed. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. R1 = resubmission. TBD = To Be Determined. TFPC = Total Federal Participating Cost. T.L. = town line. TRD = TIP Readiness Days.

 

 

 

Scenario 3A1: Somerville- McGrath Highway Funding Adjustment, Removal of Chelsea- Broadway

TIP ID Proponent(s) Project Name MPO Score Investment Category MAPC
Subregion
FFY 2024–28 Programmed Year(s) FFY 2025–29
Programmed Year(s)
Design Status FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029
(New)
Other Non-Target Funds Adjusted TFPC
 (FFYs 2025-29)
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 BP NSTF 2025 2025 25% Received
R1
$15,777,132 $13,966,099 $0 $0 $0 $0 $0 $0 $0 $0 $13,966,099
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 BP ICC 2026 2027 25% Received $0 $0 $21,288,202 $18,000,000 $0 $2,499,750 $0 $0 $0 $0 $20,499,750
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 BP ICC 2027 2028 Approved $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127
610691 Natick COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 BP MWRC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $7,760,451 $7,492,849 $0 $0 $7,492,849
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 BP NSTF 2028 2028 Approved $0 $0 $0 $0 $0 $0 $8,932,000 $8,624,000 $0 $0 $8,624,000
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 BP MAGIC N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $8,526,000 $0 $8,526,000
S12694 Newton NEWMO MICROTRANSIT SERVICE EXPANSION 87 CC ICC 2023-25 2023-24 N/A $209,663 $0 $0 $0 $0 $0 $0 $0 $0 $0 $477,909
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 CC MAGIC 2023-25 2023-25 N/A $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $836,995
S12697 Watertown PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 CC ICC 2023-25 2023-25 N/A $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $564,373
S12700 CATA CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION – ROCKPORT AND LANESVILLE 61.75 CC NSTF 2023-25 2023-25 N/A $214,776 $214,776 $0 $0 $0 $0 $0 $0 $0 $0 $214,776
S12699 Stoneham STONEHAM SHUTTLE SERVICE 72 CC NSPC 2023-25 2023-25 N/A $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $466,628
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 CC MWRC 2023-25 2023-25 N/A $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $308,913
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 CC MWRC 2024-26 2024-26 N/A $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $380,477
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A CC REGIONWIDE 2025-28 2026-29 Administrative $1,000,000 $0 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A CC REGIONWIDE 2025-28 2026-29 Administrative $909,679 $0 $2,337,500 $1,887,222 $2,500,000 $2,036,193 $2,500,000 $2,000,000 $2,500,000 $0 $8,423,415
S12958 Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 CC ICC N/A 2025 N/A $0 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $590,348
S12960 Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 CC ICC N/A 2025 N/A $0 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $385,456
S12959 Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 CC ICC N/A 2025 N/A $0 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $379,470
S12962 Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 CC ICC N/A 2025 N/A $0 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $278,127
S12691 Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 CC ICC N/A 2025 N/A $0 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $200,000
S12694 Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK  63.5 CC ICC N/A 2025 N/A $0 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $169,000
S12965 Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 CC ICC N/A 2025 N/A $0 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $90,878
S12966 Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 CC ICC N/A 2025 N/A $0 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $81,250
S12967 Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 CC SSC N/A 2025 N/A $0 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $22,800
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 CC ICC N/A 2025-27 N/A $0 $499,649 $0 $450,278 $0 $463,807 $0 $0 $0 $0 $1,413,375
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 59 CS NSPC 2025 2025 100% Received $23,731,429 $37,452,645 $0 $0 $0 $0 $0 $0 $0 $0 $37,452,645
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   55 CS SSC 2025 2026 25% DPH $15,018,900 $0 $0 $28,738,432 $0 $0 $0 $0 $0 $0 $28,738,432
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 58 CS ICC 2025 2026 25% Received R1 $8,665,052 $0 $0 $8,665,052 $0 $0 $0 $0 $0 $0 $8,665,052
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 CS ICC 2025 2027 Approved $10,548,928 $0 $0 $0 $0 $10,954,656 $0 $0 $0 $0 $10,954,656
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 CS MWRC 2025 2028 25% Comments $742,315 $0 $0 $0 $0 $0 $0 $836,339 $0 $480,000 $1,316,340
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 CS ICC 2025 2026-27 Approved $19,698,640 $0 $0 $10,000,000 $0 $9,698,640 $0 $0 $0 $0 $19,698,640
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 CS SWAP 2026 2026 25% Received
R2
$0 $0 $9,758,201 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 CS ICC 2026 2027 Approved $0 $0 $16,632,000 $0 $0 $16,632,000 $0 $0 $0 $0 $16,632,000
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 CS NSTF 2026 2027 75% Received $0 $0 $14,172,868 $0 $0 $26,122,722 $0 $0 $0 $0 $26,122,722
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 CS MWRC 2026 2027 25% DPH $0 $0 $16,420,119 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 75 CS NSPC 2026 2027 Approved $0 $0 $17,382,600 $0 $0 $17,382,600 $0 $0 $0 $0 $17,382,600
611983 Chelsea CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 69.9 CS ICC 2027 2027 Approved $0 $0 $0 $0 $11,705,708 $11,287,647 $0 $0 $0 $0 $11,705,708
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 CS ICC 2027 2028 Approved $0 $0 $0 $0 $28,995,267 $0 $0 $10,000,000 $18,995,267 $0 $28,995,267
613145 Wakefield WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 61.8 CS NSPC 2028 2028 Approved $0 $0 $0 $0 $0 $0 $16,581,200 $18,435,976 $0 $0 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 53.3 CS TRIC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $22,094,875 $12,854,847 $10,000,000 $0 $22,854,847
605743 Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 47 CS NSTF 2026-27 2027-28 25% Received R1 $0 $0 $5,702,076 $0 $6,026,622 $6,000,000 $0 $5,728,698 $0 $0 $11,728,698
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 CS ICC 2027-30 2028-31 Approved $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $15,000,000 $20,000,000 $0 $45,897,600
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 54.3 CS SWAP N/A 2028 Approved $0 $0 $0 $0 $0 $0 $0 $0 $8,340,000 $0 $16,680,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 CS NSTF N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $5,368,966 $0 $5,368,966
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 52 II NSPC 2025 2025 25% Approved $1,978,080 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 II ICC 2025 2026 75% Received $6,315,013 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,807,515
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 II MWRC 2026 2026 75% Received $0 $0 $2,185,303 $3,237,804 $0 $0 $0 $0 $0 $0 $3,237,804
613121 MassDOT EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 N/A II ICC 2027 N/A Approved $0 $0 $0 $0 $5,246,920 $0 $0 $0 $0 $0 $5,059,530
605857 Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  55 II TRIC 2026-27 2026-27 25% Received R1 $0 $0 $11,125,872 $27,636,336 $17,573,400 $0 $0 $0 $0 $0 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 II ICC N/A 2026 75% Received $0 $0 $0 $1,885,353 $0 $0 $0 $0 $0 $0 $1,885,353
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 MI ICC 2027-30 2027-31 Approved $0 $0 $0 $0 $35,000,000 $22,000,000 $30,000,000 $30,000,000 $37,810,000 $0 $88,250,000
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 MI ICC 2027-32 2028-32 25% Received R1 $0 $0 $0 $0 $8,600,000 $0 $33,500,000 $33,500,000 $37,500,000 $0 $197,759,449
TBD Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD MI MAGIC N/A 2026 N/A $0 $0 $0 $1,650,000 $0 $0 $0 $0 $0 $0 $1,650,000
TBD Framingham FRAMINGHAM- DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA & CSX RAILROAD TBD MI MWRC N/A 2026 N/A $0 $0 $0 $1,400,000 $0 $0 $0 $0 $0 $0 $1,400,000
S12825 CTPS PROJECT DESIGN SUPPORT PILOT N/A N/A REGIONWIDE 2025 2025 Administrative $4,000,000 $10,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0
S12821 MBTA RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A TT NSPC 2024 2024-25 N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
S12822 MBTA COLUMBUS AVE BUS LANE PHASE II N/A TT ICC 2021, 2024 2021, 2024-25 N/A $0 $7,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $11,750,000
S12819 MBTA JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC 2024-25 2024-25 N/A $14,000,000 $21,250,000 $0 $0 $0 $0 $0 $0 $0 $0 $33,500,000
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A TT REGIONWIDE 2025-28 2026-29 Administrative $2,000,000 $0 $6,500,000 $5,000,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $24,500,000
TBD MBTA CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC N/A 2025 100% design, advertising September 2024. Complete May 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
TBD MBTA MBTA SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A TT ICC, SSC, TRIC, NSTF  N/A 2025 5-10% design, advertising summer 2025, complete spring 2026 for furnishings and fall 2026 for control systems. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000
TBD MBTA RAIL MODERNIZATION - FITCHBURG LINE IMPROVEMENTS (KENDAL GREEN) N/A TT MWRC N/A 2025 N/A - Design Build
Completion December 2026
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,000,000
TBD MBTA MBTA MATTAPAN SQUARE RECONFIGURATION (BOSTON) N/A TT ICC N/A 2025-26 15% design with substantial outreach and conceptual work to date.  Advertise fall 2025. Complete summer 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
TBD MBTA MBTA NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A TT ICC N/A 2025 Approaching 15% design, advertise January 2025 and complete May 2025. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
611974 MassDOT MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE N/A II ICC 2026 2026 NTP issued (5/19/2021)
for FFY 2026 advertisement.
$0 $0 $0 $0 $0 $0 $0 $0 $0 $8,498,000 $1,625,250
609531 MassDOT ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A BP ICC 2025 2025 75% Received - R1 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,625,250 $5,000,000
611982 MassDOT MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A BP ICC 2025 2025 75% Received $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,509,294 $5,000,000
TBD MWRTA MWRTA- PROCUREMENT OF THREE 29 FOOT BUSES 52.2 TT MWRC N/A 2025 N/A $0 $1,980,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,980,000
TBD CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS TBD TT NSTF N/A 2025 N/A $0 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $65,000
TBD CATA CATA - CATA GLOUCESTER FACILITY MODERNIZATION TBD TT NSTF N/A 2025 N/A   $1,293,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,293,000
TBD MWRTA MWRTA- BLANDIN HUB EQUITABLE REDESIGN INITIATIVE TBD TT MWRC N/A 2025-26 N/A $0 $1,750,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,500,000
TBD CATA CATA - VEHICLE REPLACEMENT (4 VEHICLES) TBD TT NSTF N/A 2025-26 N/A $0 $1,710,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,460,000

 

Federal Fiscal Year 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 (New) 2025-29 Total
Total Available Regional Highway Target Funds (2025-29 TIP): $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $155,132,142 $158,052,175 $158,052,175 $161,030,608 $727,928,301
                     
Draft Total Programmed Regional Highway Target Funds: $125,975,489 $110,482,691 $124,667,241 $124,761,542 $144,006,044 $153,577,727 $149,868,526 $157,830,836 $157,540,233 $704,193,030
Regional Highway Target Funds Remaining (Unprogrammed): $2,452,200 $17,944,998 $618,447 $524,145 $11,126,099 $1,554,415 $8,183,649 $221,339 $3,490,375 $23,735,271
Percent Unprogrammed 1.9% 14.0% 0.5% 0.4% 7.2% 1.0% 5.2% 0.1% 2.2% 3.3%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2024 TIP readiness meeting.
Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.
Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.
Black, bolded text on project names indicates an administrative line item.  These line items often set aside funding to be allocated in future TIP cycles.  
Indicates a project was recommended to move out to a later TIP year.
Indicates a project is proposed to added to the TIP.  
Indicates a project proposed for additional changes in this Scenario beyond those made at the February 2024 TIP Readiness Meeting.
Indicates a project proposed for further changes beyond what was shown in Scenario 2.
Indicates a project to be considered for the scenario.  The estimated cost of the project can be found in the final column, and the corresponding blue cell indicates its readiness year(s).

 

Abbreviations:

TIP investment programs: BP = Bicycle and Pedestrian. CC = Community Connections. CS = Complete Streets. II = Intersection Improvements. MI = Major Infrastructure. TT = Transit Transformation

Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.

Other abbreviations:

CATA = Cape Ann Transportation Authority. C.L. = city line. CTPS = Central Transportation Planning Staff. DPH = design public hearing. FFY = federal fiscal year. MAPC = Metropolitan Area Planning Council. MART = Montachusett Regional Transit Authority. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NewMo = Newton in Motion. NTP = notice to proceed. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. R1 = resubmission. TBD = To Be Determined. TFPC = Total Federal Participating Cost. T.L. = town line. TRD = TIP Readiness Days.

 

 

 

Scenario 3A2: Somerville - McGrath Highway Funding Adjustment

TIP ID Proponent(s) Project Name MPO Score Investment Category MAPC
Subregion
FFY 2024–28 Programmed Year(s) FFY 2025–29
Programmed Year(s)
Design Status FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029
(New)
Other Non-Target Funds Adjusted TFPC
 (FFYs 2025-29)
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 BP NSTF 2025 2025 25% Received
R1
$15,777,132 $13,966,099 $0 $0 $0 $0 $0 $0 $0 $0 $13,966,099
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 BP ICC 2026 2027 25% Received $0 $0 $21,288,202 $8,000,000 $0 $12,499,750 $0 $0 $0 $0 $20,499,750
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 BP ICC 2027 2028 Approved $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127
610691 Natick COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 BP MWRC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $7,760,451 $7,492,849 $0 $0 $7,492,849
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 BP NSTF 2028 2028 Approved $0 $0 $0 $0 $0 $0 $8,932,000 $8,624,000 $0 $0 $8,624,000
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 BP MAGIC N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $8,526,000 $0 $8,526,000
S12694 Newton NEWMO MICROTRANSIT SERVICE EXPANSION 87 CC ICC 2023-25 2023-24 N/A $209,663 $0 $0 $0 $0 $0 $0 $0 $0 $0 $477,909
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 CC MAGIC 2023-25 2023-25 N/A $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $836,995
S12697 Watertown PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 CC ICC 2023-25 2023-25 N/A $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $564,373
S12700 CATA CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION – ROCKPORT AND LANESVILLE 61.75 CC NSTF 2023-25 2023-25 N/A $214,776 $214,776 $0 $0 $0 $0 $0 $0 $0 $0 $214,776
S12699 Stoneham STONEHAM SHUTTLE SERVICE 72 CC NSPC 2023-25 2023-25 N/A $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $466,628
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 CC MWRC 2023-25 2023-25 N/A $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $308,913
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 CC MWRC 2024-26 2024-26 N/A $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $380,477
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A CC REGIONWIDE 2025-28 2026-29 Administrative $1,000,000 $0 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A CC REGIONWIDE 2025-28 2026-29 Administrative $909,679 $0 $2,337,500 $1,887,222 $2,500,000 $2,036,193 $2,500,000 $2,000,000 $2,500,000 $0 $8,423,415
S12958 Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 CC ICC N/A 2025 N/A $0 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $590,348
S12960 Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 CC ICC N/A 2025 N/A $0 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $385,456
S12959 Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 CC ICC N/A 2025 N/A $0 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $379,470
S12962 Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 CC ICC N/A 2025 N/A $0 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $278,127
S12691 Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 CC ICC N/A 2025 N/A $0 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $200,000
S12694 Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK  63.5 CC ICC N/A 2025 N/A $0 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $169,000
S12965 Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 CC ICC N/A 2025 N/A $0 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $90,878
S12966 Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 CC ICC N/A 2025 N/A $0 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $81,250
S12967 Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 CC SSC N/A 2025 N/A $0 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $22,800
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 CC ICC N/A 2025-27 N/A $0 $499,649 $0 $450,278 $0 $463,807 $0 $0 $0 $0 $1,413,375
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 59 CS NSPC 2025 2025 100% Received $23,731,429 $37,452,645 $0 $0 $0 $0 $0 $0 $0 $0 $37,452,645
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   55 CS SSC 2025 2026 25% DPH $15,018,900 $0 $0 $28,738,432 $0 $0 $0 $0 $0 $0 $28,738,432
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 58 CS ICC 2025 2026 25% Received R1 $8,665,052 $0 $0 $8,665,052 $0 $0 $0 $0 $0 $0 $8,665,052
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 CS ICC 2025 2027 Approved $10,548,928 $0 $0 $0 $0 $10,954,656 $0 $0 $0 $0 $10,954,656
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 CS MWRC 2025 2028 25% Comments $742,315 $0 $0 $0 $0 $0 $0 $836,339 $0 $480,000 $1,316,340
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 CS ICC 2025 2026-27 Approved $19,698,640 $0 $0 $10,000,000 $0 $9,698,640 $0 $0 $0 $0 $19,698,640
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 CS SWAP 2026 2026 25% Received
R2
$0 $0 $9,758,201 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 CS ICC 2026 2027 Approved $0 $0 $16,632,000 $0 $0 $16,632,000 $0 $0 $0 $0 $16,632,000
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 CS NSTF 2026 2027 75% Received $0 $0 $14,172,868 $0 $0 $26,122,722 $0 $0 $0 $0 $26,122,722
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 CS MWRC 2026 2027 25% DPH $0 $0 $16,420,119 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 75 CS NSPC 2026 2027 Approved $0 $0 $17,382,600 $0 $0 $17,382,600 $0 $0 $0 $0 $17,382,600
611983 Chelsea CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 69.9 CS ICC 2027 2027 Approved $0 $0 $0 $0 $11,705,708 $11,287,647 $0 $0 $0 $0 $11,705,708
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 CS ICC 2027 2028 Approved $0 $0 $0 $0 $28,995,267 $0 $0 $10,000,000 $18,995,267 $0 $28,995,267
613145 Wakefield WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 61.8 CS NSPC 2028 2028 Approved $0 $0 $0 $0 $0 $0 $16,581,200 $18,435,976 $0 $0 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 53.3 CS TRIC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $22,094,875 $12,854,847 $10,000,000 $0 $22,854,847
605743 Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 47 CS NSTF 2026-27 2027-28 25% Received R1 $0 $0 $5,702,076 $0 $6,026,622 $6,000,000 $0 $5,728,698 $0 $0 $11,728,698
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 CS ICC 2027-30 2028-31 Approved $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $15,000,000 $20,000,000 $0 $45,897,600
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 54.3 CS SWAP N/A 2028 Approved $0 $0 $0 $0 $0 $0 $0 $0 $8,340,000 $0 $16,680,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 CS NSTF N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $5,368,966 $0 $5,368,966
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 52 II NSPC 2025 2025 25% Approved $1,978,080 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 II ICC 2025 2026 75% Received $6,315,013 $0 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $9,807,515
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 II MWRC 2026 2026 75% Received $0 $0 $2,185,303 $3,237,804 $0 $0 $0 $0 $0 $0 $3,237,804
613121 MassDOT EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 N/A II ICC 2027 N/A Approved $0 $0 $0 $0 $5,246,920 $0 $0 $0 $0 $0 $5,059,530
605857 Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  55 II TRIC 2026-27 2026-27 25% Received R1 $0 $0 $11,125,872 $27,636,336 $17,573,400 $0 $0 $0 $0 $0 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 II ICC N/A 2026 75% Received $0 $0 $0 $1,885,353 $0 $0 $0 $0 $0 $0 $1,885,353
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 MI ICC 2027-30 2027-31 Approved $0 $0 $0 $0 $35,000,000 $12,000,000 $30,000,000 $30,000,000 $42,500,000 $0 $88,250,000
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 MI ICC 2027-32 2028-32 25% Received R1 $0 $0 $0 $0 $8,600,000 $0 $33,500,000 $33,500,000 $33,500,000 $0 $197,759,449
TBD Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD MI MAGIC N/A 2026 N/A $0 $0 $0 $1,650,000 $0 $0 $0 $0 $0 $0 $1,650,000
TBD Framingham FRAMINGHAM- DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA & CSX RAILROAD TBD MI MWRC N/A 2026 N/A $0 $0 $0 $1,400,000 $0 $0 $0 $0 $0 $0 $1,400,000
S12825 CTPS PROJECT DESIGN SUPPORT PILOT N/A N/A REGIONWIDE 2025 2025 Administrative $4,000,000 $10,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0
S12821 MBTA RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A TT NSPC 2024 2024-25 N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
S12822 MBTA COLUMBUS AVE BUS LANE PHASE II N/A TT ICC 2021, 2024 2021, 2024-25 N/A $0 $7,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $11,750,000
S12819 MBTA JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC 2024-25 2024-25 N/A $14,000,000 $21,250,000 $0 $0 $0 $0 $0 $0 $0 $0 $33,500,000
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A TT REGIONWIDE 2025-28 2026-29 Administrative $2,000,000 $0 $6,500,000 $5,000,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $24,500,000
TBD MBTA CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC N/A 2025 100% design, advertising September 2024. Complete May 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
TBD MBTA MBTA SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A TT ICC, SSC, TRIC, NSTF  N/A 2025 5-10% design, advertising Summer 2025, complete spring 2026 for furnishings and fall 2026 for control systems. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000
TBD MBTA RAIL MODERNIZATION - FITCHBURG LINE IMPROVEMENTS (KENDAL GREEN) N/A TT MWRC N/A 2025 N/A - Design Build
Completion December 2026
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,000,000
TBD MBTA MBTA MATTAPAN SQUARE RECONFIGURATION (BOSTON) N/A TT ICC N/A 2025-26 15% design with substantial outreach and conceptual work to date.  Advertise fall 2025, Complete summer 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
TBD MBTA MBTA NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A TT ICC N/A 2025 Approaching 15% design, advertise January 2025 and complete May 2025. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
611974 MassDOT MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE N/A II ICC 2026 2026 NTP issued (5/19/2021)
for FFY 2026 advertisement.
$0 $0 $0 $0 $0 $0 $0 $0 $0 $8,498,000 $1,625,250
609531 MassDOT ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A BP ICC 2025 2025 75% Received - R1 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,625,250 $5,000,000
611982 MassDOT MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A BP ICC 2025 2025 75% Received $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,509,294 $5,000,000
TBD MWRTA MWRTA- PROCUREMENT OF THREE 29 FOOT BUSES 52.2 TT MWRC N/A 2025 N/A $0 $1,980,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,980,000
TBD CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS TBD TT NSTF N/A 2025 N/A $0 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $65,000
TBD CATA CATA - CATA GLOUCESTER FACILITY MODERNIZATION TBD TT NSTF N/A 2025 N/A   $1,293,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,293,000
TBD MWRTA MWRTA- BLANDIN HUB EQUITABLE REDESIGN INITIATIVE TBD TT MWRC N/A 2025-26 N/A $0 $1,750,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,500,000
TBD CATA CATA - VEHICLE REPLACEMENT (4 VEHICLES) TBD TT NSTF N/A 2025-26 N/A $0 $1,710,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,460,000

 

Federal Fiscal Year 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 (New) 2025-29 Total
Total Available Regional Highway Target Funds (2025-29 TIP): $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $155,132,142 $158,052,175 $158,052,175 $161,030,608 $727,928,301
                     
Draft Total Programmed Regional Highway Target Funds: $125,975,489 $110,482,691 $124,667,241 $124,569,057 $144,006,044 $153,577,727 $149,868,526 $157,830,836 $158,230,233 $704,690,545
Regional Highway Target Funds Remaining (Unprogrammed): $2,452,200 $17,944,998 $618,447 $716,630 $11,126,099 $1,554,415 $8,183,649 $221,339 $2,800,375 $23,237,756
Percent Unprogrammed 1.9% 14.0% 0.5% 0.6% 7.2% 1.0% 5.2% 0.1% 1.7% 3.2%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2024 TIP readiness meeting.
Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.
Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.
Black, bolded text on project names indicates an administrative line item.  These line items often set aside funding to be allocated in future TIP cycles.  
Indicates a project was recommended to move out to a later TIP year.
Indicates a project is proposed to added to the TIP.  
Indicates a project proposed for additional changes in this Scenario beyond those made at the February 2024 TIP Readiness Meeting.
Indicates a project proposed for further changes beyond what was shown in Scenario 2.
Indicates a project to be considered for the scenario.  The estimated cost of the project can be found in the final column, and the corresponding blue cell indicates its readiness year(s).

 

Abbreviations:

TIP investment programs: BP = Bicycle and Pedestrian. CC = Community Connections. CS = Complete Streets. II = Intersection Improvements. MI = Major Infrastructure. TT = Transit Transformation

Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.

Other abbreviations:

CATA = Cape Ann Transportation Authority. C.L. = city line. CTPS = Central Transportation Planning Staff. DPH = design public hearing. FFY = federal fiscal year. MAPC = Metropolitan Area Planning Council. MART = Montachusett Regional Transit Authority. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NewMo = Newton in Motion. NTP = notice to proceed. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. R1 = resubmission. TBD = To Be Determined. TFPC = Total Federal Participating Cost. T.L. = town line. TRD = TIP Readiness Days.

 

 

 

Scenario 3B: Boston- Cambridge Street Bridge Delay to FFY 2029

TIP ID Proponent(s) Project Name MPO Score Investment Category MAPC
Subregion
FFY 2024–28 Programmed Year(s) FFY 2025–29
Programmed Year(s)
Design Status FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029
(New)
Other Non-Target Funds Adjusted TFPC
 (FFYs 2025-29)
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 BP NSTF 2025 2025 25% Received
R1
$15,777,132 $13,966,099 $0 $0 $0 $0 $0 $0 $0 $0 $13,966,099
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 BP ICC 2026 2027 25% Received $0 $0 $21,288,202 $8,000,000 $0 $12,499,750 $0 $0 $0 $0 $20,499,750
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 BP ICC 2027 2028 Approved $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127
610691 Natick COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 BP MWRC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $7,760,451 $7,492,849 $0 $0 $7,492,849
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 BP NSTF 2028 2028 Approved $0 $0 $0 $0 $0 $0 $8,932,000 $8,624,000 $0 $0 $8,624,000
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 BP MAGIC N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,526,000
S12694 Newton NEWMO MICROTRANSIT SERVICE EXPANSION 87 CC ICC 2023-25 2023-24 N/A $209,663 $0 $0 $0 $0 $0 $0 $0 $0 $0 $477,909
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 CC MAGIC 2023-25 2023-25 N/A $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $836,995
S12697 Watertown PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 CC ICC 2023-25 2023-25 N/A $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $564,373
S12700 CATA CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION – ROCKPORT AND LANESVILLE 61.75 CC NSTF 2023-25 2023-25 N/A $214,776 $214,776 $0 $0 $0 $0 $0 $0 $0 $0 $214,776
S12699 Stoneham STONEHAM SHUTTLE SERVICE 72 CC NSPC 2023-25 2023-25 N/A $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $466,628
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 CC MWRC 2023-25 2023-25 N/A $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $308,913
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 CC MWRC 2024-26 2024-26 N/A $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $380,477
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A CC REGIONWIDE 2025-28 2026-29 Administrative $1,000,000 $0 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A CC REGIONWIDE 2025-28 2026-29 Administrative $909,679 $0 $2,337,500 $1,887,222 $2,500,000 $2,036,193 $2,500,000 $2,000,000 $2,500,000 $0 $8,423,415
S12958 Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 CC ICC N/A 2025 N/A $0 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $590,348
S12960 Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 CC ICC N/A 2025 N/A $0 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $385,456
S12959 Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 CC ICC N/A 2025 N/A $0 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $379,470
S12962 Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 CC ICC N/A 2025 N/A $0 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $278,127
S12691 Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 CC ICC N/A 2025 N/A $0 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $200,000
S12694 Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK  63.5 CC ICC N/A 2025 N/A $0 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $169,000
S12965 Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 CC ICC N/A 2025 N/A $0 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $90,878
S12966 Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 CC ICC N/A 2025 N/A $0 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $81,250
S12967 Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 CC SSC N/A 2025 N/A $0 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $22,800
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 CC ICC N/A 2025-27 N/A $0 $499,649 $0 $450,278 $0 $463,807 $0 $0 $0 $0 $1,413,375
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 59 CS NSPC 2025 2025 100% Received $23,731,429 $37,452,645 $0 $0 $0 $0 $0 $0 $0 $0 $37,452,645
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   55 CS SSC 2025 2026 25% DPH $15,018,900 $0 $0 $28,738,432 $0 $0 $0 $0 $0 $0 $28,738,432
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 58 CS ICC 2025 2026 25% Received R1 $8,665,052 $0 $0 $8,665,052 $0 $0 $0 $0 $0 $0 $8,665,052
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 CS ICC 2025 2027 Approved $10,548,928 $0 $0 $0 $0 $10,954,656 $0 $0 $0 $0 $10,954,656
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 CS MWRC 2025 2028 25% Comments $742,315 $0 $0 $0 $0 $0 $0 $836,339 $0 $480,000 $1,316,340
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 CS ICC 2025 2026-27 Approved $19,698,640 $0 $0 $10,000,000 $0 $9,698,640 $0 $0 $0 $0 $19,698,640
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 CS SWAP 2026 2026 25% Received
R2
$0 $0 $9,758,201 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 CS ICC 2026 2027 Approved $0 $0 $16,632,000 $0 $0 $0 $0 $0 $17,864,000 $0 $16,632,000
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 CS NSTF 2026 2027 75% Received $0 $0 $14,172,868 $0 $0 $26,122,722 $0 $0 $0 $0 $26,122,722
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 CS MWRC 2026 2027 25% DPH $0 $0 $16,420,119 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 75 CS NSPC 2026 2027 Approved $0 $0 $17,382,600 $0 $0 $17,382,600 $0 $0 $0 $0 $17,382,600
611983 Chelsea CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 69.9 CS ICC 2027 2027 Approved $0 $0 $0 $0 $11,705,708 $11,287,647 $0 $0 $0 $0 $11,705,708
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 CS ICC 2027 2028 Approved $0 $0 $0 $0 $28,995,267 $0 $0 $10,000,000 $18,995,267 $0 $28,995,267
613145 Wakefield WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 61.8 CS NSPC 2028 2028 Approved $0 $0 $0 $0 $0 $0 $16,581,200 $18,435,976 $0 $0 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 53.3 CS TRIC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $22,094,875 $12,854,847 $10,000,000 $0 $22,854,847
605743 Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 47 CS NSTF 2026-27 2027-28 25% Received R1 $0 $0 $5,702,076 $0 $6,026,622 $6,000,000 $0 $5,728,698 $0 $0 $11,728,698
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 CS ICC 2027-30 2028-31 Approved $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $15,000,000 $20,000,000 $0 $45,897,600
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 54.3 CS SWAP N/A 2028 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $16,680,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 CS NSTF N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,368,966
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 52 II NSPC 2025 2025 25% Approved $1,978,080 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 II ICC 2025 2026 75% Received $6,315,013 $0 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $9,807,515
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 II MWRC 2026 2026 75% Received $0 $0 $2,185,303 $3,237,804 $0 $0 $0 $0 $0 $0 $3,237,804
613121 MassDOT EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 N/A II ICC 2027 N/A Approved $0 $0 $0 $0 $5,246,920 $0 $0 $0 $0 $0 $5,059,530
605857 Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  55 II TRIC 2026-27 2026-27 25% Received R1 $0 $0 $11,125,872 $27,636,336 $17,573,400 $0 $0 $0 $0 $0 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 II ICC N/A 2026 75% Received $0 $0 $0 $1,885,353 $0 $0 $0 $0 $0 $0 $1,885,353
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 MI ICC 2027-30 2027-31 Approved $0 $0 $0 $0 $35,000,000 $30,000,000 $30,000,000 $30,000,000 $30,310,000 $0 $88,250,000
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 MI ICC 2027-32 2028-32 25% Received R1 $0 $0 $0 $0 $8,600,000 $0 $33,500,000 $33,500,000 $45,000,000 $0 $197,759,449
TBD Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD MI MAGIC N/A 2026 N/A $0 $0 $0 $1,650,000 $0 $0 $0 $0 $0 $0 $1,650,000
TBD Framingham FRAMINGHAM- DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA & CSX RAILROAD TBD MI MWRC N/A 2026 N/A $0 $0 $0 $1,400,000 $0 $0 $0 $0 $0 $0 $1,400,000
S12825 CTPS PROJECT DESIGN SUPPORT PILOT N/A N/A REGIONWIDE 2025 2025 Administrative $4,000,000 $10,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0
S12821 MBTA RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A TT NSPC 2024 2024-25 N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
S12822 MBTA COLUMBUS AVE BUS LANE PHASE II N/A TT ICC 2021, 2024 2021, 2024-25 N/A $0 $7,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $11,750,000
S12819 MBTA JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC 2024-25 2024-25 N/A $14,000,000 $21,250,000 $0 $0 $0 $0 $0 $0 $0 $0 $33,500,000
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A TT REGIONWIDE 2025-28 2026-29 Administrative $2,000,000 $0 $6,500,000 $5,000,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $24,500,000
TBD MBTA CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC N/A 2025 100% design, advertising September 2024. Complete May 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
TBD MBTA MBTA SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A TT ICC, SSC, TRIC, NSTF  N/A 2025 5-10% design, advertising summer 2025, complete spring 2026 for furnishings and fall 2026 for control systems. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000
TBD MBTA RAIL MODERNIZATION - FITCHBURG LINE IMPROVEMENTS (KENDAL GREEN) N/A TT MWRC N/A 2025 N/A - Design Build
Completion December 2026
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,000,000
TBD MBTA MBTA MATTAPAN SQUARE RECONFIGURATION (BOSTON) N/A TT ICC N/A 2025-26 15% design with substantial outreach and conceptual work to date.  Advertise fall 2025. Complete summer 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
TBD MBTA MBTA NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A TT ICC N/A 2025 Approaching 15% design, advertise January 2025 and complete May 2025. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
611974 MassDOT MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE N/A II ICC 2026 2026 NTP issued (5/19/2021)
for FFY 2026 advertisement.
$0 $0 $0 $0 $0 $0 $0 $0 $0 $8,498,000 $1,625,250
609531 MassDOT ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A BP ICC 2025 2025 75% Received - R1 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,625,250 $5,000,000
611982 MassDOT MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A BP ICC 2025 2025 75% Received $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,509,294 $5,000,000
TBD MWRTA MWRTA- PROCUREMENT OF THREE 29 FOOT BUSES 52.2 TT MWRC N/A 2025 N/A $0 $1,980,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,980,000
TBD CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS TBD TT NSTF N/A 2025 N/A $0 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $65,000
TBD CATA CATA - CATA GLOUCESTER FACILITY MODERNIZATION TBD TT NSTF N/A 2025 N/A   $1,293,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,293,000
TBD MWRTA MWRTA- BLANDIN HUB EQUITABLE REDESIGN INITIATIVE TBD TT MWRC N/A 2025-26 N/A $0 $1,750,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,500,000
TBD CATA CATA - VEHICLE REPLACEMENT (4 VEHICLES) TBD TT NSTF N/A 2025-26 N/A $0 $1,710,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,460,000

 

Federal Fiscal Year 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 (New) 2025-29 Total
Total Available Regional Highway Target Funds (2025-29 TIP): $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $155,132,142 $158,052,175 $158,052,175 $161,030,608 $727,928,301
                     
Draft Total Programmed Regional Highway Target Funds: $125,975,489 $110,482,691 $124,667,241 $124,569,057 $144,006,044 $154,945,727 $149,868,526 $157,830,836 $153,169,267 $700,997,579
Regional Highway Target Funds Remaining (Unprogrammed): $2,452,200 $17,944,998 $618,447 $716,630 $11,126,099 $186,415 $8,183,649 $221,339 $7,861,341 $26,930,722
Percent Unprogrammed 1.9% 14.0% 0.5% 0.6% 7.2% 0.1% 5.2% 0.1% 4.9% 3.7%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2024 TIP readiness meeting.
Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.
Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.
Black, bolded text on project names indicates an administrative line item.  These line items often set aside funding to be allocated in future TIP cycles.  
Indicates a project was recommended to move out to a later TIP year.
Indicates a project is proposed to added to the TIP.  
Indicates a project proposed for additional changes in this Scenario beyond those made at the February 2024 TIP Readiness Meeting.
Indicates a project proposed for further changes beyond what was shown in Scenario 2.
Indicates a project to be considered for the scenario.  The estimated cost of the project can be found in the final column, and the corresponding blue cell indicates its readiness year(s).

 

Abbreviations:

TIP investment programs: BP = Bicycle and Pedestrian. CC = Community Connections. CS = Complete Streets. II = Intersection Improvements. MI = Major Infrastructure. TT = Transit Transformation

Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.

Other abbreviations:

CATA = Cape Ann Transportation Authority. C.L. = city line. CTPS = Central Transportation Planning Staff. DPH = design public hearing. FFY = federal fiscal year. MAPC = Metropolitan Area Planning Council. MART = Montachusett Regional Transit Authority. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NewMo = Newton in Motion. NTP = notice to proceed. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. R1 = resubmission. TBD = To Be Determined. TFPC = Total Federal Participating Cost. T.L. = town line. TRD = TIP Readiness Days.

 

 

 

Scenario 3C: Everett- Beacham Street and Ipswich- Central and South Main Street Delay to FFY 2029

TIP ID Proponent(s) Project Name MPO Score Investment Category MAPC
Subregion
FFY 2024–28 Programmed Year(s) FFY 2025–29
Programmed Year(s)
Design Status FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029
(New)
Other Non-Target Funds Adjusted TFPC
 (FFYs 2025-29)
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 BP NSTF 2025 2025 25% Received
R1
$15,777,132 $13,966,099 $0 $0 $0 $0 $0 $0 $0 $0 $13,966,099
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 BP ICC 2026 2027 25% Received $0 $0 $21,288,202 $8,000,000 $0 $12,499,750 $0 $0 $0 $0 $20,499,750
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 BP ICC 2027 2028 Approved $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127
610691 Natick COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 BP MWRC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $7,760,451 $7,492,849 $0 $0 $7,492,849
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 BP NSTF 2028 2028 Approved $0 $0 $0 $0 $0 $0 $8,932,000 $8,624,000 $0 $0 $8,624,000
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 BP MAGIC N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,526,000
S12694 Newton NEWMO MICROTRANSIT SERVICE EXPANSION 87 CC ICC 2023-25 2023-24 N/A $209,663 $0 $0 $0 $0 $0 $0 $0 $0 $0 $477,909
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 CC MAGIC 2023-25 2023-25 N/A $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $836,995
S12697 Watertown PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 CC ICC 2023-25 2023-25 N/A $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $564,373
S12700 CATA CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION – ROCKPORT AND LANESVILLE 61.75 CC NSTF 2023-25 2023-25 N/A $214,776 $214,776 $0 $0 $0 $0 $0 $0 $0 $0 $214,776
S12699 Stoneham STONEHAM SHUTTLE SERVICE 72 CC NSPC 2023-25 2023-25 N/A $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $466,628
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 CC MWRC 2023-25 2023-25 N/A $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $308,913
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 CC MWRC 2024-26 2024-26 N/A $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $380,477
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A CC REGIONWIDE 2025-28 2026-29 Administrative $1,000,000 $0 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A CC REGIONWIDE 2025-28 2026-29 Administrative $909,679 $0 $2,337,500 $1,887,222 $2,500,000 $2,036,193 $2,500,000 $2,000,000 $2,500,000 $0 $8,423,415
S12958 Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 CC ICC N/A 2025 N/A $0 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $590,348
S12960 Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 CC ICC N/A 2025 N/A $0 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $385,456
S12959 Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 CC ICC N/A 2025 N/A $0 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $379,470
S12962 Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 CC ICC N/A 2025 N/A $0 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $278,127
S12691 Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 CC ICC N/A 2025 N/A $0 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $200,000
S12694 Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK  63.5 CC ICC N/A 2025 N/A $0 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $169,000
S12965 Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 CC ICC N/A 2025 N/A $0 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $90,878
S12966 Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 CC ICC N/A 2025 N/A $0 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $81,250
S12967 Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 CC SSC N/A 2025 N/A $0 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $22,800
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 CC ICC N/A 2025-27 N/A $0 $499,649 $0 $450,278 $0 $463,807 $0 $0 $0 $0 $1,413,375
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 59 CS NSPC 2025 2025 100% Received $23,731,429 $37,452,645 $0 $0 $0 $0 $0 $0 $0 $0 $37,452,645
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   55 CS SSC 2025 2026 25% DPH $15,018,900 $0 $0 $28,738,432 $0 $0 $0 $0 $0 $0 $28,738,432
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 58 CS ICC 2025 2026 25% Received R1 $8,665,052 $0 $0 $8,665,052 $0 $0 $0 $0 $0 $0 $8,665,052
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 CS ICC 2025 2027 Approved $10,548,928 $0 $0 $0 $0 $0 $0 $0 $11,766,111 $0 $10,954,656
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 CS MWRC 2025 2028 25% Comments $742,315 $0 $0 $0 $0 $0 $0 $836,339 $0 $480,000 $1,316,340
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 CS ICC 2025 2026-27 Approved $19,698,640 $0 $0 $10,000,000 $0 $9,698,640 $0 $0 $0 $0 $19,698,640
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 CS SWAP 2026 2026 25% Received
R2
$0 $0 $9,758,201 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 CS ICC 2026 2027 Approved $0 $0 $16,632,000 $0 $0 $16,632,000 $0 $0   $0 $16,632,000
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 CS NSTF 2026 2027 75% Received $0 $0 $14,172,868 $0 $0 $26,122,722 $0 $0 $0 $0 $26,122,722
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 CS MWRC 2026 2027 25% DPH $0 $0 $16,420,119 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 75 CS NSPC 2026 2027 Approved $0 $0 $17,382,600 $0 $0 $17,382,600 $0 $0 $0 $0 $17,382,600
611983 Chelsea CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 69.9 CS ICC 2027 2027 Approved $0 $0 $0 $0 $11,705,708 $11,287,647 $0 $0 $0 $0 $11,705,708
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 CS ICC 2027 2028 Approved $0 $0 $0 $0 $28,995,267 $0 $0 $10,000,000 $18,995,267 $0 $28,995,267
613145 Wakefield WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 61.8 CS NSPC 2028 2028 Approved $0 $0 $0 $0 $0 $0 $16,581,200 $18,435,976 $0 $0 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 53.3 CS TRIC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $22,094,875 $12,854,847 $10,000,000 $0 $22,854,847
605743 Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 47 CS NSTF 2026-27 2027-28 25% Received R1 $0 $0 $5,702,076 $0 $6,026,622 $0 $0 $0 $12,597,490 $0 $11,728,698
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 CS ICC 2027-30 2028-31 Approved $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $15,000,000 $20,000,000 $0 $45,897,600
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 54.3 CS SWAP N/A 2028 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $16,680,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 CS NSTF N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,368,966
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 52 II NSPC 2025 2025 25% Approved $1,978,080 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 II ICC 2025 2026 75% Received $6,315,013 $0 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $9,807,515
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 II MWRC 2026 2026 75% Received $0 $0 $2,185,303 $3,237,804 $0 $0 $0 $0 $0 $0 $3,237,804
613121 MassDOT EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 N/A II ICC 2027 N/A Approved $0 $0 $0 $0 $5,246,920 $0 $0 $0 $0 $0 $5,059,530
605857 Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  55 II TRIC 2026-27 2026-27 25% Received R1 $0 $0 $11,125,872 $27,636,336 $17,573,400 $0 $0 $0 $0 $0 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 II ICC N/A 2026 75% Received $0 $0 $0 $1,885,353 $0 $0 $0 $0 $0 $0 $1,885,353
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 MI ICC 2027-30 2027-31 Approved $0 $0 $0 $0 $35,000,000 $30,000,000 $30,000,000 $30,000,000 $30,310,000 $0 $88,250,000
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 MI ICC 2027-32 2028-32 25% Received R1 $0 $0 $0 $0 $8,600,000 $0 $33,500,000 $33,500,000 $45,000,000 $0 $197,759,449
TBD Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD MI MAGIC N/A 2026 N/A $0 $0 $0 $1,650,000 $0 $0 $0 $0 $0 $0 $1,650,000
TBD Framingham FRAMINGHAM- DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA & CSX RAILROAD TBD MI MWRC N/A 2026 N/A $0 $0 $0 $1,400,000 $0 $0 $0 $0 $0 $0 $1,400,000
S12825 CTPS PROJECT DESIGN SUPPORT PILOT N/A N/A REGIONWIDE 2025 2025 Administrative $4,000,000 $10,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0
S12821 MBTA RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A TT NSPC 2024 2024-25 N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
S12822 MBTA COLUMBUS AVE BUS LANE PHASE II N/A TT ICC 2021, 2024 2021, 2024-25 N/A $0 $7,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $11,750,000
S12819 MBTA JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC 2024-25 2024-25 N/A $14,000,000 $21,250,000 $0 $0 $0 $0 $0 $0 $0 $0 $33,500,000
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A TT REGIONWIDE 2025-28 2026-29 Administrative $2,000,000 $0 $6,500,000 $5,000,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $24,500,000
TBD MBTA CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC N/A 2025 100% design, advertising September 2024. Complete May 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
TBD MBTA MBTA SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A TT ICC, SSC, TRIC, NSTF  N/A 2025 5-10% design, advertising summer 2025, complete spring 2026 for furnishings and fall 2026 for control systems. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000
TBD MBTA RAIL MODERNIZATION - FITCHBURG LINE IMPROVEMENTS (KENDAL GREEN) N/A TT MWRC N/A 2025 N/A - Design Build
Completion December 2026
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,000,000
TBD MBTA MBTA MATTAPAN SQUARE RECONFIGURATION (BOSTON) N/A TT ICC N/A 2025-26 15% design with substantial outreach and conceptual work to date.  Advertise fall 2025, Complete summer 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
TBD MBTA MBTA NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A TT ICC N/A 2025 Approaching 15% design, advertise January 2025 and complete May 2025. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
611974 MassDOT MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE N/A II ICC 2026 2026 NTP issued (5/19/2021)
for FFY 2026 advertisement.
$0 $0 $0 $0 $0 $0 $0 $0 $0 $8,498,000 $1,625,250
609531 MassDOT ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A BP ICC 2025 2025 75% Received - R1 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,625,250 $5,000,000
611982 MassDOT MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A BP ICC 2025 2025 75% Received $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,509,294 $5,000,000
TBD MWRTA MWRTA- PROCUREMENT OF THREE 29 FOOT BUSES 52.2 TT MWRC N/A 2025 N/A $0 $1,980,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,980,000
TBD CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS TBD TT NSTF N/A 2025 N/A $0 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $65,000
TBD CATA CATA - CATA GLOUCESTER FACILITY MODERNIZATION TBD TT NSTF N/A 2025 N/A   $1,293,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,293,000
TBD MWRTA MWRTA- BLANDIN HUB EQUITABLE REDESIGN INITIATIVE TBD TT MWRC N/A 2025-26 N/A $0 $1,750,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,500,000
TBD CATA CATA - VEHICLE REPLACEMENT (4 VEHICLES) TBD TT NSTF N/A 2025-26 N/A $0 $1,710,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,460,000

 

Federal Fiscal Year 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 (New) 2025-29 Total
Total Available Regional Highway Target Funds (2025-29 TIP): $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $155,132,142 $158,052,175 $158,052,175 $161,030,608 #########
                     
Draft Total Programmed Regional Highway Target Funds: $125,975,489 $110,482,691 $124,667,241 $124,569,057 $144,006,044 $154,623,071 $149,868,526 $152,102,138 $159,668,868 ##########
Regional Highway Target Funds Remaining (Unprogrammed): $2,452,200 $17,944,998 $618,447 $716,630 $11,126,099 $509,071 $8,183,649 $5,950,037 $1,361,740 $26,482,475
Percent Unprogrammed 1.9% 14.0% 0.5% 0.6% 7.2% 0.3% 5.2% 3.8% 0.8% 3.6%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2024 TIP readiness meeting.
Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.
Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.
Black, bolded text on project names indicates an administrative line item.  These line items often set aside funding to be allocated in future TIP cycles.  
Indicates a project was recommended to move out to a later TIP year.
Indicates a project is proposed to added to the TIP.  
Indicates a project proposed for additional changes in this Scenario beyond those made at the February 2024 TIP Readiness Meeting.
Indicates a project proposed for further changes beyond what was shown in Scenario 2.
Indicates a project to be considered for the scenario.  The estimated cost of the project can be found in the final column, and the corresponding blue cell indicates its readiness year(s).

 

Abbreviations:

TIP investment programs: BP = Bicycle and Pedestrian. CC = Community Connections. CS = Complete Streets. II = Intersection Improvements. MI = Major Infrastructure. TT = Transit Transformation

Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.

Other abbreviations:

CATA = Cape Ann Transportation Authority. C.L. = city line. CTPS = Central Transportation Planning Staff. DPH = design public hearing. FFY = federal fiscal year. MAPC = Metropolitan Area Planning Council. MART = Montachusett Regional Transit Authority. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NewMo = Newton in Motion. NTP = notice to proceed. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. R1 = resubmission. TBD = To Be Determined. TFPC = Total Federal Participating Cost. T.L. = town line. TRD = TIP Readiness Days.

 

 

 

Scenario 3D: Weston- Route 30 Delay to FFY 2029

TIP ID Proponent(s) Project Name MPO Score Investment Category MAPC
Subregion
FFY 2024–28 Programmed Year(s) FFY 2025–29
Programmed Year(s)
Design Status FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029
(New)
Other Non-Target Funds Adjusted TFPC
 (FFYs 2025-29)
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 BP NSTF 2025 2025 25% Received
R1
$15,777,132 $13,966,099 $0 $0 $0 $0 $0 $0 $0 $0 $13,966,099
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 BP ICC 2026 2027 25% Received $0 $0 $21,288,202 $8,000,000 $0 $12,499,750 $0 $0 $0 $0 $20,499,750
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 BP ICC 2027 2028 Approved $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127
610691 Natick COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 BP MWRC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $7,760,451 $7,492,849 $0 $0 $7,492,849
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 BP NSTF 2028 2028 Approved $0 $0 $0 $0 $0 $0 $8,932,000 $8,624,000 $0 $0 $8,624,000
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 BP MAGIC N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,526,000
S12694 Newton NEWMO MICROTRANSIT SERVICE EXPANSION 87 CC ICC 2023-25 2023-24 N/A $209,663 $0 $0 $0 $0 $0 $0 $0 $0 $0 $477,909
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 CC MAGIC 2023-25 2023-25 N/A $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $836,995
S12697 Watertown PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 CC ICC 2023-25 2023-25 N/A $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $564,373
S12700 CATA CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION – ROCKPORT AND LANESVILLE 61.75 CC NSTF 2023-25 2023-25 N/A $214,776 $214,776 $0 $0 $0 $0 $0 $0 $0 $0 $214,776
S12699 Stoneham STONEHAM SHUTTLE SERVICE 72 CC NSPC 2023-25 2023-25 N/A $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $466,628
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 CC MWRC 2023-25 2023-25 N/A $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $308,913
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 CC MWRC 2024-26 2024-26 N/A $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $380,477
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A CC REGIONWIDE 2025-28 2026-29 Administrative $1,000,000 $0 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A CC REGIONWIDE 2025-28 2026-29 Administrative $909,679 $0 $2,337,500 $1,887,222 $2,500,000 $2,036,193 $2,500,000 $2,000,000 $2,500,000 $0 $8,423,415
S12958 Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 CC ICC N/A 2025 N/A $0 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $590,348
S12960 Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 CC ICC N/A 2025 N/A $0 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $385,456
S12959 Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 CC ICC N/A 2025 N/A $0 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $379,470
S12962 Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 CC ICC N/A 2025 N/A $0 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $278,127
S12691 Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 CC ICC N/A 2025 N/A $0 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $200,000
S12694 Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK  63.5 CC ICC N/A 2025 N/A $0 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $169,000
S12965 Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 CC ICC N/A 2025 N/A $0 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $90,878
S12966 Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 CC ICC N/A 2025 N/A $0 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $81,250
S12967 Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 CC SSC N/A 2025 N/A $0 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $22,800
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 CC ICC N/A 2025-27 N/A $0 $499,649 $0 $450,278 $0 $463,807 $0 $0 $0 $0 $1,413,375
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 59 CS NSPC 2025 2025 100% Received $23,731,429 $37,452,645 $0 $0 $0 $0 $0 $0 $0 $0 $37,452,645
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   55 CS SSC 2025 2026 25% DPH $15,018,900 $0 $0 $28,738,432 $0 $0 $0 $0 $0 $0 $28,738,432
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 58 CS ICC 2025 2026 25% Received R1 $8,665,052 $0 $0 $8,665,052 $0 $0 $0 $0 $0 $0 $8,665,052
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 CS ICC 2025 2027 Approved $10,548,928 $0 $0 $0 $0 $10,954,656 $0 $0 $0 $0 $10,954,656
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 CS MWRC 2025 2028 25% Comments $742,315 $0 $0 $0 $0 $0 $0 $836,339 $0 $480,000 $1,316,340
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 CS ICC 2025 2026-27 Approved $19,698,640 $0 $0 $10,000,000 $0 $9,698,640 $0 $0 $0 $0 $19,698,640
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 CS SWAP 2026 2026 25% Received
R2
$0 $0 $9,758,201 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 CS ICC 2026 2027 Approved $0 $0 $16,632,000 $0 $0 $16,632,000 $0 $0 $0 $0 $16,632,000
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 CS NSTF 2026 2027 75% Received $0 $0 $14,172,868 $0 $0 $26,122,722 $0 $0 $0 $0 $26,122,722
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 CS MWRC 2026 2027 25% DPH $0 $0 $16,420,119 $0 $0 $0 $0 $0 $21,481,172 $0 $19,999,712
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 75 CS NSPC 2026 2027 Approved $0 $0 $17,382,600 $0 $0 $17,382,600 $0 $0 $0 $0 $17,382,600
611983 Chelsea CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 69.9 CS ICC 2027 2027 Approved $0 $0 $0 $0 $11,705,708 $11,287,647 $0 $0 $0 $0 $11,705,708
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 CS ICC 2027 2028 Approved $0 $0 $0 $0 $28,995,267 $0 $0 $10,000,000 $18,995,267 $0 $28,995,267
613145 Wakefield WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 61.8 CS NSPC 2028 2028 Approved $0 $0 $0 $0 $0 $0 $16,581,200 $18,435,976 $0 $0 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 53.3 CS TRIC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $22,094,875 $12,854,847 $10,000,000 $0 $22,854,847
605743 Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 47 CS NSTF 2026-27 2027-28 25% Received R1 $0 $0 $5,702,076 $0 $6,026,622 $6,000,000 $0 $5,728,698 $0 $0 $11,728,698
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 CS ICC 2027-30 2028-31 Approved $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $15,000,000 $20,000,000 $0 $45,897,600
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 54.3 CS SWAP N/A 2028 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $16,680,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 CS NSTF N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,368,966
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 52 II NSPC 2025 2025 25% Approved $1,978,080 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 II ICC 2025 2026 75% Received $6,315,013 $0 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $9,807,515
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 II MWRC 2026 2026 75% Received $0 $0 $2,185,303 $3,237,804 $0 $0 $0 $0 $0 $0 $3,237,804
613121 MassDOT EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 N/A II ICC 2027 N/A Approved $0 $0 $0 $0 $5,246,920 $0 $0 $0 $0 $0 $5,059,530
605857 Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  55 II TRIC 2026-27 2026-27 25% Received R1 $0 $0 $11,125,872 $27,636,336 $17,573,400 $0 $0 $0 $0 $0 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 II ICC N/A 2026 75% Received $0 $0 $0 $1,885,353 $0 $0 $0 $0 $0 $0 $1,885,353
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 MI ICC 2027-30 2027-31 Approved $0 $0 $0 $0 $35,000,000 $30,000,000 $30,000,000 $30,000,000 $30,310,000 $0 $88,250,000
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 MI ICC 2027-32 2028-32 25% Received R1 $0 $0 $0 $0 $8,600,000 $0 $33,500,000 $33,500,000 $45,000,000 $0 $197,759,449
TBD Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD MI MAGIC N/A 2026 N/A $0 $0 $0 $1,650,000 $0 $0 $0 $0 $0 $0 $1,650,000
TBD Framingham FRAMINGHAM- DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA & CSX RAILROAD TBD MI MWRC N/A 2026 N/A $0 $0 $0 $1,400,000 $0 $0 $0 $0 $0 $0 $1,400,000
S12825 CTPS PROJECT DESIGN SUPPORT PILOT N/A N/A REGIONWIDE 2025 2025 Administrative $4,000,000 $10,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0
S12821 MBTA RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A TT NSPC 2024 2024-25 N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
S12822 MBTA COLUMBUS AVE BUS LANE PHASE II N/A TT ICC 2021, 2024 2021, 2024-25 N/A $0 $7,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $11,750,000
S12819 MBTA JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC 2024-25 2024-25 N/A $14,000,000 $21,250,000 $0 $0 $0 $0 $0 $0 $0 $0 $33,500,000
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A TT REGIONWIDE 2025-28 2026-29 Administrative $2,000,000 $0 $6,500,000 $5,000,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $24,500,000
TBD MBTA CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC N/A 2025 100% design, advertising September 2024. Complete May 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
TBD MBTA MBTA SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A TT ICC, SSC, TRIC, NSTF  N/A 2025 5-10% design, advertising Summer 2025, complete spring 2026 for furnishings and fall 2026 for control systems. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000
TBD MBTA RAIL MODERNIZATION - FITCHBURG LINE IMPROVEMENTS (KENDAL GREEN) N/A TT MWRC N/A 2025 N/A - Design Build
Completion December 2026
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,000,000
TBD MBTA MBTA MATTAPAN SQUARE RECONFIGURATION (BOSTON) N/A TT ICC N/A 2025-26 15% design with substantial outreach and conceptual work to date.  Advertise fall 2025. Complete summer 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
TBD MBTA MBTA NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A TT ICC N/A 2025 Approaching 15% design, advertise January 2025 and complete May 2025. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
611974 MassDOT MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE N/A II ICC 2026 2026 NTP issued (5/19/2021)
for FFY 2026 advertisement.
$0 $0 $0 $0 $0 $0 $0 $0 $0 $8,498,000 $1,625,250
609531 MassDOT ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A BP ICC 2025 2025 75% Received - R1 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,625,250 $5,000,000
611982 MassDOT MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A BP ICC 2025 2025 75% Received $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,509,294 $5,000,000
TBD MWRTA MWRTA- PROCUREMENT OF THREE 29 FOOT BUSES 52.2 TT MWRC N/A 2025 N/A $0 $1,980,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,980,000
TBD CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS TBD TT NSTF N/A 2025 N/A $0 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $65,000
TBD CATA CATA - CATA GLOUCESTER FACILITY MODERNIZATION TBD TT NSTF N/A 2025 N/A   $1,293,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,293,000
TBD MWRTA MWRTA- BLANDIN HUB EQUITABLE REDESIGN INITIATIVE TBD TT MWRC N/A 2025-26 N/A $0 $1,750,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,500,000
TBD CATA CATA - VEHICLE REPLACEMENT (4 VEHICLES) TBD TT NSTF N/A 2025-26 N/A $0 $1,710,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,460,000

 

Federal Fiscal Year 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 (New) 2025-29 Total
Total Available Regional Highway Target Funds (2025-29 TIP): $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $155,132,142 $158,052,175 $158,052,175 $161,030,608 $727,928,301
                     
Draft Total Programmed Regional Highway Target Funds: $125,975,489 $110,482,691 $124,667,241 $124,569,057 $144,006,044 $151,578,015 $149,868,526 $157,830,836 $156,786,439 $701,247,039
Regional Highway Target Funds Remaining (Unprogrammed): $2,452,200 $17,944,998 $618,447 $716,630 $11,126,099 $3,554,127 $8,183,649 $221,339 $4,244,169 $26,681,262
Percent Unprogrammed 1.9% 14.0% 0.5% 0.6% 7.2% 2.3% 5.2% 0.1% 2.6% 3.7%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2024 TIP readiness meeting.
Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.
Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.
Black, bolded text on project names indicates an administrative line item.  These line items often set aside funding to be allocated in future TIP cycles.  
Indicates a project was recommended to move out to a later TIP year.
Indicates a project is proposed to added to the TIP.  
Indicates a project proposed for additional changes in this Scenario beyond those made at the February 2024 TIP Readiness Meeting.
Indicates a project proposed for further changes beyond what was shown in Scenario 2.
Indicates a project to be considered for the scenario.  The estimated cost of the project can be found in the final column, and the corresponding blue cell indicates its readiness year(s).

 

Abbreviations:

TIP investment programs: BP = Bicycle and Pedestrian. CC = Community Connections. CS = Complete Streets. II = Intersection Improvements. MI = Major Infrastructure. TT = Transit Transformation

Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.

Other abbreviations:

CATA = Cape Ann Transportation Authority. C.L. = city line. CTPS = Central Transportation Planning Staff. DPH = design public hearing. FFY = federal fiscal year. MAPC = Metropolitan Area Planning Council. MART = Montachusett Regional Transit Authority. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NewMo = Newton in Motion. NTP = notice to proceed. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. R1 = resubmission. TBD = To Be Determined. TFPC = Total Federal Participating Cost. T.L. = town line. TRD = TIP Readiness Days.

 

 

 

Scenario 3E: Woburn- Town Common Delay to FFY 2029

TIP ID Proponent(s) Project Name MPO Score Investment Category MAPC
Subregion
FFY 2024–28 Programmed Year(s) FFY 2025–29
Programmed Year(s)
Design Status FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029
(New)
Other Non-Target Funds Adjusted TFPC
 (FFYs 2025-29)
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 BP NSTF 2025 2025 25% Received
R1
$15,777,132 $13,966,099 $0 $0 $0 $0 $0 $0 $0 $0 $13,966,099
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 BP ICC 2026 2027 25% Received $0 $0 $21,288,202 $8,000,000 $0 $12,499,750 $0 $0 $0 $0 $20,499,750
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 BP ICC 2027 2028 Approved $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127
610691 Natick COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 BP MWRC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $7,760,451 $7,492,849 $0 $0 $7,492,849
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 BP NSTF 2028 2028 Approved $0 $0 $0 $0 $0 $0 $8,932,000 $8,624,000 $0 $0 $8,624,000
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 BP MAGIC N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,526,000
S12694 Newton NEWMO MICROTRANSIT SERVICE EXPANSION 87 CC ICC 2023-25 2023-24 N/A $209,663 $0 $0 $0 $0 $0 $0 $0 $0 $0 $477,909
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 CC MAGIC 2023-25 2023-25 N/A $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $836,995
S12697 Watertown PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 CC ICC 2023-25 2023-25 N/A $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $564,373
S12700 CATA CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION – ROCKPORT AND LANESVILLE 61.75 CC NSTF 2023-25 2023-25 N/A $214,776 $214,776 $0 $0 $0 $0 $0 $0 $0 $0 $214,776
S12699 Stoneham STONEHAM SHUTTLE SERVICE 72 CC NSPC 2023-25 2023-25 N/A $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $466,628
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 CC MWRC 2023-25 2023-25 N/A $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $308,913
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 CC MWRC 2024-26 2024-26 N/A $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $380,477
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A CC REGIONWIDE 2025-28 2026-29 Administrative $1,000,000 $0 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A CC REGIONWIDE 2025-28 2026-29 Administrative $909,679 $0 $2,337,500 $1,887,222 $2,500,000 $2,036,193 $2,500,000 $2,000,000 $2,500,000 $0 $8,423,415
S12958 Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 CC ICC N/A 2025 N/A $0 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $590,348
S12960 Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 CC ICC N/A 2025 N/A $0 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $385,456
S12959 Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 CC ICC N/A 2025 N/A $0 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $379,470
S12962 Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 CC ICC N/A 2025 N/A $0 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $278,127
S12691 Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 CC ICC N/A 2025 N/A $0 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $200,000
S12694 Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK  63.5 CC ICC N/A 2025 N/A $0 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $169,000
S12965 Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 CC ICC N/A 2025 N/A $0 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $90,878
S12966 Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 CC ICC N/A 2025 N/A $0 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $81,250
S12967 Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 CC SSC N/A 2025 N/A $0 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $22,800
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 CC ICC N/A 2025-27 N/A $0 $499,649 $0 $450,278 $0 $463,807 $0 $0 $0 $0 $1,413,375
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 59 CS NSPC 2025 2025 100% Received $23,731,429 $37,452,645 $0 $0 $0 $0 $0 $0 $0 $0 $37,452,645
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   55 CS SSC 2025 2026 25% DPH $15,018,900 $0 $0 $28,738,432 $0 $0 $0 $0 $0 $0 $28,738,432
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 58 CS ICC 2025 2026 25% Received R1 $8,665,052 $0 $0 $8,665,052 $0 $0 $0 $0 $0 $0 $8,665,052
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 CS ICC 2025 2027 Approved $10,548,928 $0 $0 $0 $0 $10,954,656 $0 $0 $0 $0 $10,954,656
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 CS MWRC 2025 2028 25% Comments $742,315 $0 $0 $0 $0 $0 $0 $836,339 $0 $480,000 $1,316,340
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 CS ICC 2025 2026-27 Approved $19,698,640 $0 $0 $10,000,000 $0 $9,698,640 $0 $0 $0 $0 $19,698,640
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 CS SWAP 2026 2026 25% Received
R2
$0 $0 $9,758,201 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 CS ICC 2026 2027 Approved $0 $0 $16,632,000 $0 $0 $16,632,000 $0 $0 $0 $0 $16,632,000
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 CS NSTF 2026 2027 75% Received $0 $0 $14,172,868 $0 $0 $26,122,722 $0 $0 $0 $0 $26,122,722
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 CS MWRC 2026 2027 25% DPH $0 $0 $16,420,119 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 75 CS NSPC 2026 2027 Approved $0 $0 $17,382,600 $0 $0 $0 $0 $0 $18,670,200 $0 $17,382,600
611983 Chelsea CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 69.9 CS ICC 2027 2027 Approved $0 $0 $0 $0 $11,705,708 $11,287,647 $0 $0 $0 $0 $11,705,708
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 CS ICC 2027 2028 Approved $0 $0 $0 $0 $28,995,267 $0 $0 $10,000,000 $18,995,267 $0 $28,995,267
613145 Wakefield WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 61.8 CS NSPC 2028 2028 Approved $0 $0 $0 $0 $0 $0 $16,581,200 $18,435,976 $0 $0 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 53.3 CS TRIC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $22,094,875 $12,854,847 $10,000,000 $0 $22,854,847
605743 Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 47 CS NSTF 2026-27 2027-28 25% Received R1 $0 $0 $5,702,076 $0 $6,026,622 $6,000,000 $0 $5,728,698 $0 $0 $11,728,698
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 CS ICC 2027-30 2028-31 Approved $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $15,000,000 $20,000,000 $0 $45,897,600
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 54.3 CS SWAP N/A 2028 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $16,680,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 CS NSTF N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,368,966
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 52 II NSPC 2025 2025 25% Approved $1,978,080 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 II ICC 2025 2026 75% Received $6,315,013 $0 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $9,807,515
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 II MWRC 2026 2026 75% Received $0 $0 $2,185,303 $3,237,804 $0 $0 $0 $0 $0 $0 $3,237,804
613121 MassDOT EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 N/A II ICC 2027 N/A Approved $0 $0 $0 $0 $5,246,920 $0 $0 $0 $0 $0 $5,059,530
605857 Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  55 II TRIC 2026-27 2026-27 25% Received R1 $0 $0 $11,125,872 $27,636,336 $17,573,400 $0 $0 $0 $0 $0 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 II ICC N/A 2026 75% Received $0 $0 $0 $1,885,353 $0 $0 $0 $0 $0 $0 $1,885,353
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 MI ICC 2027-30 2027-31 Approved $0 $0 $0 $0 $35,000,000 $30,000,000 $30,000,000 $30,000,000 $30,310,000 $0 $88,250,000
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 MI ICC 2027-32 2028-32 25% Received R1 $0 $0 $0 $0 $8,600,000 $0 $33,500,000 $33,500,000 $45,000,000 $0 $197,759,449
TBD Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD MI MAGIC N/A 2026 N/A $0 $0 $0 $1,650,000 $0 $0 $0 $0 $0 $0 $1,650,000
TBD Framingham FRAMINGHAM- DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA & CSX RAILROAD TBD MI MWRC N/A 2026 N/A $0 $0 $0 $1,400,000 $0 $0 $0 $0 $0 $0 $1,400,000
S12825 CTPS PROJECT DESIGN SUPPORT PILOT N/A N/A REGIONWIDE 2025 2025 Administrative $4,000,000 $10,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0
S12821 MBTA RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A TT NSPC 2024 2024-25 N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
S12822 MBTA COLUMBUS AVE BUS LANE PHASE II N/A TT ICC 2021, 2024 2021, 2024-25 N/A $0 $7,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $11,750,000
S12819 MBTA JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC 2024-25 2024-25 N/A $14,000,000 $21,250,000 $0 $0 $0 $0 $0 $0 $0 $0 $33,500,000
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A TT REGIONWIDE 2025-28 2026-29 Administrative $2,000,000 $0 $6,500,000 $5,000,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $24,500,000
TBD MBTA CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC N/A 2025 100% design, advertising September 2024. Complete May 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
TBD MBTA MBTA SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A TT ICC, SSC, TRIC, NSTF  N/A 2025 5-10% design, advertising summer 2025, complete spring 2026 for furnishings and fall 2026 for control systems. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000
TBD MBTA RAIL MODERNIZATION - FITCHBURG LINE IMPROVEMENTS (KENDAL GREEN) N/A TT MWRC N/A 2025 N/A - Design Build
Completion December 2026
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,000,000
TBD MBTA MBTA MATTAPAN SQUARE RECONFIGURATION (BOSTON) N/A TT ICC N/A 2025-26 15% design with substantial outreach and conceptual work to date.  Advertise fall 2025. Complete summer 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
TBD MBTA MBTA NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A TT ICC N/A 2025 Approaching 15% design. Advertise January 2025 and complete May 2025. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
611974 MassDOT MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE N/A II ICC 2026 2026 NTP issued (5/19/2021)
for FFY 2026 advertisement.
$0 $0 $0 $0 $0 $0 $0 $0 $0 $8,498,000 $1,625,250
609531 MassDOT ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A BP ICC 2025 2025 75% Received - R1 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,625,250 $5,000,000
611982 MassDOT MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A BP ICC 2025 2025 75% Received $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,509,294 $5,000,000
TBD MWRTA MWRTA- PROCUREMENT OF THREE 29 FOOT BUSES 52.2 TT MWRC N/A 2025 N/A $0 $1,980,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,980,000
TBD CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS TBD TT NSTF N/A 2025 N/A $0 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $65,000
TBD CATA CATA - CATA GLOUCESTER FACILITY MODERNIZATION TBD TT NSTF N/A 2025 N/A   $1,293,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,293,000
TBD MWRTA MWRTA- BLANDIN HUB EQUITABLE REDESIGN INITIATIVE TBD TT MWRC N/A 2025-26 N/A $0 $1,750,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,500,000
TBD CATA CATA - VEHICLE REPLACEMENT (4 VEHICLES) TBD TT NSTF N/A 2025-26 N/A $0 $1,710,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,460,000

 

Federal Fiscal Year 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 (New) 2025-29 Total
Total Available Regional Highway Target Funds (2025-29 TIP): $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $155,132,142 $158,052,175 $158,052,175 $161,030,608 $727,928,301
                     
Draft Total Programmed Regional Highway Target Funds: $125,975,489 $110,482,691 $124,667,241 $124,569,057 $144,006,044 $154,195,127 $149,868,526 $157,830,836 $153,975,467 $701,053,179
Regional Highway Target Funds Remaining (Unprogrammed): $2,452,200 $17,944,998 $618,447 $716,630 $11,126,099 $937,015 $8,183,649 $221,339 $7,055,141 $26,875,122
Percent Unprogrammed 1.9% 14.0% 0.5% 0.6% 7.2% 0.6% 5.2% 0.1% 4.4% 3.7%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2024 TIP readiness meeting.
Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.
Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.
Black, bolded text on project names indicates an administrative line item.  These line items often set aside funding to be allocated in future TIP cycles.  
Indicates a project was recommended to move out to a later TIP year.
Indicates a project is proposed to added to the TIP.  
Indicates a project proposed for additional changes in this Scenario beyond those made at the February 2024 TIP Readiness Meeting.
Indicates a project proposed for further changes beyond what was shown in Scenario 2.
Indicates a project to be considered for the scenario.  The estimated cost of the project can be found in the final column, and the corresponding blue cell indicates its readiness year(s).

 

Abbreviaitons:

TIP investment programs: BP = Bicycle and Pedestrian. CC = Community Connections. CS = Complete Streets. II = Intersection Improvements. MI = Major Infrastructure. TT = Transit Transformation

Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.

Other abbreviations:

CATA = Cape Ann Transportation Authority. C.L. = city line. CTPS = Central Transportation Planning Staff. DPH = design public hearing. FFY = federal fiscal year. MAPC = Metropolitan Area Planning Council. MART = Montachusett Regional Transit Authority. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NewMo = Newton in Motion. NTP = notice to proceed. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. R1 = resubmission. TBD = To Be Determined. TFPC = Total Federal Participating Cost. T.L. = town line. TRD = TIP Readiness Days.

 

 

 

Scenario 3X: Salem- Boston Street Delay to FFY 2029

TIP ID Proponent(s) Project Name MPO Score Investment Category MAPC
Subregion
FFY 2024–28 Programmed Year(s) FFY 2025–29
Programmed Year(s)
Design Status FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029
(New)
Other Non-Target Funds Adjusted TFPC
 (FFYs 2025-29)
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 BP NSTF 2025 2025 25% Received
R1
$15,777,132 $13,966,099 $0 $0 $0 $0 $0 $0 $0 $0 $13,966,099
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 BP ICC 2026 2027 25% Received $0 $0 $21,288,202 $8,000,000 $0 $12,499,750 $0 $0 $0 $0 $20,499,750
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 BP ICC 2027 2028 Approved $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127
610691 Natick COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 BP MWRC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $7,760,451 $7,492,849 $0 $0 $7,492,849
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 BP NSTF 2028 2028 Approved $0 $0 $0 $0 $0 $0 $8,932,000 $8,624,000 $0 $0 $8,624,000
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 BP MAGIC N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,526,000
S12694 Newton NEWMO MICROTRANSIT SERVICE EXPANSION 87 CC ICC 2023-25 2023-24 N/A $209,663 $0 $0 $0 $0 $0 $0 $0 $0 $0 $477,909
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 CC MAGIC 2023-25 2023-25 N/A $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $836,995
S12697 Watertown PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 CC ICC 2023-25 2023-25 N/A $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $564,373
S12700 CATA CATA ON DEMAND MICROTRANSIT SERVICE EXPANSION – ROCKPORT AND LANESVILLE 61.75 CC NSTF 2023-25 2023-25 N/A $214,776 $214,776 $0 $0 $0 $0 $0 $0 $0 $0 $214,776
S12699 Stoneham STONEHAM SHUTTLE SERVICE 72 CC NSPC 2023-25 2023-25 N/A $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $466,628
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 CC MWRC 2023-25 2023-25 N/A $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $308,913
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 CC MWRC 2024-26 2024-26 N/A $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $380,477
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A CC REGIONWIDE 2025-28 2026-29 Administrative $1,000,000 $0 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A CC REGIONWIDE 2025-28 2026-29 Administrative $909,679 $0 $2,337,500 $1,887,222 $2,500,000 $2,036,193 $2,500,000 $2,000,000 $2,500,000 $0 $8,423,415
S12958 Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 CC ICC N/A 2025 N/A $0 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $590,348
S12960 Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 CC ICC N/A 2025 N/A $0 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $385,456
S12959 Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 CC ICC N/A 2025 N/A $0 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $379,470
S12962 Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 CC ICC N/A 2025 N/A $0 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $278,127
S12691 Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 CC ICC N/A 2025 N/A $0 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $200,000
S12694 Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK  63.5 CC ICC N/A 2025 N/A $0 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $169,000
S12965 Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 CC ICC N/A 2025 N/A $0 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $90,878
S12966 Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 CC ICC N/A 2025 N/A $0 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $81,250
S12967 Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 CC SSC N/A 2025 N/A $0 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $22,800
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 CC ICC N/A 2025-27 N/A $0 $499,649 $0 $450,278 $0 $463,807 $0 $0 $0 $0 $1,413,375
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. 59 CS NSPC 2025 2025 100% Received $23,731,429 $37,452,645 $0 $0 $0 $0 $0 $0 $0 $0 $37,452,645
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD.   55 CS SSC 2025 2026 25% DPH $15,018,900 $0 $0 $28,738,432 $0 $0 $0 $0 $0 $0 $28,738,432
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET 58 CS ICC 2025 2026 25% Received R1 $8,665,052 $0 $0 $8,665,052 $0 $0 $0 $0 $0 $0 $8,665,052
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 CS ICC 2025 2027 Approved $10,548,928 $0 $0 $0 $0 $10,954,656 $0 $0 $0 $0 $10,954,656
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 CS MWRC 2025 2028 25% Comments $742,315 $0 $0 $0 $0 $0 $0 $836,339 $0 $480,000 $1,316,340
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 CS ICC 2025 2026-27 Approved $19,698,640 $0 $0 $10,000,000 $0 $9,698,640 $0 $0 $0 $0 $19,698,640
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 CS SWAP 2026 2026 25% Received
R2
$0 $0 $9,758,201 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 CS ICC 2026 2027 Approved $0 $0 $16,632,000 $0 $0 $16,632,000 $0 $0 $0 $0 $16,632,000
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 CS NSTF 2026 2027 75% Received $0 $0 $14,172,868 $0 $0 $0 $0 $0 $28,057,738 $0 $26,122,722
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 CS MWRC 2026 2027 25% DPH $0 $0 $16,420,119 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE 75 CS NSPC 2026 2027 Approved $0 $0 $17,382,600 $0 $0 $17,382,600 $0 $0 $0 $0 $17,382,600
611983 Chelsea CHELSEA- PARK STREET & PEARL STREET RECONSTRUCTION 69.9 CS ICC 2027 2027 Approved $0 $0 $0 $0 $11,705,708 $11,287,647 $0 $0 $0 $0 $11,705,708
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 CS ICC 2027 2028 Approved $0 $0 $0 $0 $28,995,267 $0 $0 $10,000,000 $18,995,267 $0 $28,995,267
613145 Wakefield WAKEFIELD- COMPREHENSIVE DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT 61.8 CS NSPC 2028 2028 Approved $0 $0 $0 $0 $0 $0 $16,581,200 $18,435,976 $0 $0 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 53.3 CS TRIC 2028 2028 25% Received $0 $0 $0 $0 $0 $0 $22,094,875 $12,854,847 $10,000,000 $0 $22,854,847
605743 Ipswich IPSWICH- RESURFACING & RELATED WORK ON CENTRAL & SOUTH MAIN STREETS 47 CS NSTF 2026-27 2027-28 25% Received R1 $0 $0 $5,702,076 $0 $6,026,622 $6,000,000 $0 $5,728,698 $0 $0 $11,728,698
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 CS ICC 2027-30 2028-31 Approved $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $15,000,000 $20,000,000 $0 $45,897,600
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 54.3 CS SWAP N/A 2028 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $16,680,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 CS NSTF N/A 2029 Approved $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,368,966
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET 52 II NSPC 2025 2025 25% Approved $1,978,080 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 II ICC 2025 2026 75% Received $6,315,013 $0 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $9,807,515
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 II MWRC 2026 2026 75% Received $0 $0 $2,185,303 $3,237,804 $0 $0 $0 $0 $0 $0 $3,237,804
613121 MassDOT EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 N/A II ICC 2027 N/A Approved $0 $0 $0 $0 $5,246,920 $0 $0 $0 $0 $0 $5,059,530
605857 Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  55 II TRIC 2026-27 2026-27 25% Received R1 $0 $0 $11,125,872 $27,636,336 $17,573,400 $0 $0 $0 $0 $0 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 II ICC N/A 2026 75% Received $0 $0 $0 $1,885,353 $0 $0 $0 $0 $0 $0 $1,885,353
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 MI ICC 2027-30 2027-31 Approved $0 $0 $0 $0 $35,000,000 $30,000,000 $30,000,000 $30,000,000 $30,310,000 $0 $88,250,000
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 MI ICC 2027-32 2028-32 25% Received R1 $0 $0 $0 $0 $8,600,000 $0 $33,500,000 $33,500,000 $45,000,000 $0 $197,759,449
TBD Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD MI MAGIC N/A 2026 N/A $0 $0 $0 $1,650,000 $0 $0 $0 $0 $0 $0 $1,650,000
TBD Framingham FRAMINGHAM- DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA & CSX RAILROAD TBD MI MWRC N/A 2026 N/A $0 $0 $0 $1,400,000 $0 $0 $0 $0 $0 $0 $1,400,000
S12825 CTPS PROJECT DESIGN SUPPORT PILOT N/A N/A REGIONWIDE 2025 2025 Administrative $4,000,000 $10,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0
S12821 MBTA RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A TT NSPC 2024 2024-25 N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
S12822 MBTA COLUMBUS AVE BUS LANE PHASE II N/A TT ICC 2021, 2024 2021, 2024-25 N/A $0 $7,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $11,750,000
S12819 MBTA JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC 2024-25 2024-25 N/A $14,000,000 $21,250,000 $0 $0 $0 $0 $0 $0 $0 $0 $33,500,000
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A TT REGIONWIDE 2025-28 2026-29 Administrative $2,000,000 $0 $6,500,000 $5,000,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $6,500,000 $0 $24,500,000
TBD MBTA CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A TT ICC N/A 2025 100% design, advertising September 2024. Complete May 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
TBD MBTA MBTA SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A TT ICC, SSC, TRIC, NSTF  N/A 2025 5-10% design, advertising summer 2025, complete spring 2026 for furnishings and fall 2026 for control systems. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000
TBD MBTA RAIL MODERNIZATION - FITCHBURG LINE IMPROVEMENTS (KENDAL GREEN) N/A TT MWRC N/A 2025 N/A - Design Build
Completion December 2026
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,000,000
TBD MBTA MBTA MATTAPAN SQUARE RECONFIGURATION (BOSTON) N/A TT ICC N/A 2025-26 15% design with substantial outreach and conceptual work to date.  Advertise fall 2025. Complete summer 2027. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000
TBD MBTA MBTA NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A TT ICC N/A 2025 Approaching 15% design. Advertise January 2025 and complete May 2025. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000
611974 MassDOT MEDFORD- INTERSECTION IMPROVEMENTS AT MAIN STREET/SOUTH STREET, MAIN STREET/MYSTIC VALLEY PARKWAY RAMPS, AND MAIN STREET/MYSTIC AVENUE N/A II ICC 2026 2026 NTP issued (5/19/2021)
for FFY 2026 advertisement.
$0 $0 $0 $0 $0 $0 $0 $0 $0 $8,498,000 $1,625,250
609531 MassDOT ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A BP ICC 2025 2025 75% Received - R1 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,625,250 $5,000,000
611982 MassDOT MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A BP ICC 2025 2025 75% Received $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,509,294 $5,000,000
TBD MWRTA MWRTA- PROCUREMENT OF THREE 29 FOOT BUSES 52.2 TT MWRC N/A 2025 N/A $0 $1,980,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,980,000
TBD CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS TBD TT NSTF N/A 2025 N/A $0 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $65,000
TBD CATA CATA - CATA GLOUCESTER FACILITY MODERNIZATION TBD TT NSTF N/A 2025 N/A   $1,293,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,293,000
TBD MWRTA MWRTA- BLANDIN HUB EQUITABLE REDESIGN INITIATIVE TBD TT MWRC N/A 2025-26 N/A $0 $1,750,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,500,000
TBD CATA CATA - VEHICLE REPLACEMENT (4 VEHICLES) TBD TT NSTF N/A 2025-26 N/A $0 $1,710,000 $0 $750,000 $0 $0 $0 $0 $0 $0 $2,460,000

 

Federal Fiscal Year 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 (New) 2025-29 Total
Total Available Regional Highway Target Funds (2025-29 TIP): $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $155,132,142 $158,052,175 $158,052,175 $161,030,608 $727,928,301
                     
Draft Total Programmed Regional Highway Target Funds: $125,975,489 $110,482,691 $124,667,241 $124,569,057 $144,006,044 $145,455,005 $149,868,526 $157,830,836 $163,363,005 $701,700,595
Regional Highway Target Funds Remaining (Unprogrammed): $2,452,200 $17,944,998 $618,447 $716,630 $11,126,099 $9,677,137 $8,183,649 $221,339 -$2,332,397 $26,227,706
Percent Unprogrammed 1.9% 14.0% 0.5% 0.6% 7.2% 6.2% 5.2% 0.1% -1.4% 3.6%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2024 TIP readiness meeting.
Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.
Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.
Black, bolded text on project names indicates an administrative line item.  These line items often set aside funding to be allocated in future TIP cycles.  
Indicates a project was recommended to move out to a later TIP year.
Indicates a project is proposed to added to the TIP.
Indicates a project proposed for additional changes in this Scenario beyond those made at the February 2024 TIP Readiness Meeting.
Indicates a project proposed for further changes beyond what was shown in Scenario 2.
Indicates a project to be considered for the scenario.  The estimated cost of the project can be found in the final column, and the corresponding blue cell indicates its readiness year(s).

 

Abbreviations:

TIP investment programs: BP = Bicycle and Pedestrian. CC = Community Connections. CS = Complete Streets. II = Intersection Improvements. MI = Major Infrastructure. TT = Transit Transformation.

Metropolitan Area Planning Council (MAPC) subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSPC = North Suburban Planning Council. NSTF = North Shore Task Force. SSC = South Shore Coalition. SWAP = SouthWest Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.

Other abbreviations:

CATA = Cape Ann Transportation Authority. C.L. = city line. CTPS = Central Transportation Planning Staff. DPH = design public hearing. FFY = federal fiscal year. MAPC = Metropolitan Area Planning Council. MART = Montachusett Regional Transit Authority. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NewMo = Newton in Motion. NTP = notice to proceed. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. R1 = resubmission. TBD = To Be Determined. TFPC = Total Federal Participating Cost. T.L. = town line. TRD = TIP Readiness Days.