Draft Memorandum for the Record

Boston Region Metropolitan Planning Organization

Transit Working Group Coffee Chat Summary: Fleet Electrification

February 28, 2022, Meeting

4:00 PM–5:00 PM, Zoom Video Conferencing Platform. Recording available at https://www.youtube.com/watch?v=KxhoeExfUL8&list=PLT37eeNGYpCHBb_9LJp6xBrmCvTrjURYN&index=13

Introductions

Sandy Johnston (Central Transportation Planning Staff) invited attendees to introduce themselves using the Zoom chat function.

RIPTA Electrification Program

Zachary Agush from the Rhode Island Public Transit Authority (RIPTA) discussed the status of RIPTA’s Zero-Emissions Vehicle Pilot Program. The pilot was intended to test the feasibility and limitations of deploying electric buses along existing transit routes in Rhode Island and has laid the foundation for the state’s transition to a fully electric fleet.

The pilot included the following three phases:

  1. Demonstration (testing vehicle performance, energy usage, and infrastructure requirements)
  2. Broader Adoption (introducing fully battery-electric service on the R-Line)
  3. Sustainable and Resilient Deployment (electrification of Newport-based services and completion of an action plan for electrification and service growth)

Three electric buses were leased during Phase I of the pilot program, all of which contained 440 kWh batteries and utilized depot chargers at one fixed site. RIPTA deployed these buses on the R-Line, their most contained, busiest route, and modified R-Line blocks to match electric bus performance trends, which differed from the existing fleet.

In 2021, RIPTA decided to fully electrify the R-Line based on the initial success of Phase I and purchased 14 additional electric buses that are scheduled for delivery in fall 2022 as part of Phase II. These buses will be equipped with on-route charging capabilities that will be functional in spring 2023. As a result of this expansion, every one in five RIPTA passengers would be riding on an electric, zero-emissions vehicle.

Phase III of the pilot program is still in progress and will explore the feasibility of electrifying two facilities and all accompanying vehicles with up to 40 electric buses to be operated on six different routes. These upgrades will also include a resiliency demonstration, such as battery storage or a micro-grid. Funding sources identified for this phase include the Federal Transit Administration’s (FTA) Low/No Emissions (LONO) Program, state contributions, RIPTA’s capital budget, and federal earmarks.

Z. Agush continued his presentation with a discussion on lessons learned and suggested that others pursuing fleet electrification should consider the wide range of factors involved in a program’s success, including increased vehicle and energy costs, infrastructure requirements such as charging stations, resiliency and potential renewable energy solutions, weather and temperature impacts on bus efficiency, general operations such as driver training, and integration with technology such as real-time vehicle and charging infrastructure monitoring, smart charge systems, data collection, scheduling software, and others.

Next steps for RIPTA’s fleet electrification program include action planning and integration with the Rhode Island Transit Master Plan, strengthening partnerships with other state and local agencies, supporting implementation of climate policy, and leveraging federal investments for infrastructure improvements.

Discussion

S. Johnston posed four questions to help frame the discussion:

  1. What are your plans for fleet electrification?
  2. How do your experiences with preparing for electrification resemble RIPTA’s, or not?
  3. What planning needs do you have around electrification?
  4. What capital investments do you anticipate making as part of the transition to an electric fleet?

The following is a largely paraphrased summary of the main points that attendees contributed to the conversation.

Sarah Lee (Massport): Are you storing the electric vehicles outside, and has that presented any issues?

Zachary Agush (RIPTA): Buses are currently being stored indoors, but RIPTA will have to consider outside storage and related challenges, such as winter weather, as the electric fleet grows.

Sarah Lee (Massport): Are there any cost savings related to electric vehicles having limited maintenance needs?

Zachary Agush (RIPTA): Yes, certain materials and maintenance practices will no longer be necessary, although there isn’t enough data to support whether any cost savings have been or will be observed.

Sarah Lee (Massport): Can you share driver feedback about the electric buses?

Zachary Agush (RIPTA): Driver responses have been mixed, though driver training for electric buses is a potential hurdle that will have to be considered.

Melissa Dullea (MBTA): Did you use a charge management system or other tool to make sure that deployed buses will have enough energy to complete a trip and return?

Zachary Agush (RIPTA): Originally RIPTA was relying on the manufacturer’s system but has since purchased a third-party software called VeriCiti that shows real-time charge status and block assignments of vehicles. They do not currently have software to monitor the chargers themselves but are looking into this.

Melissa Dullea (MBTA): How do you allocate time for vehicle layovers, and are you considering charging time?

Zachary Agush (RIPTA): The R-Line’s route length and large number of vehicles easily allowed buses to be re-routed to the indoor charging facility without interfering much with layovers and timing, though it may be more difficult to alter other routes, so RIPTA is considering route alteration and management as it expands the electric fleet.

Melissa Dullea (MBTA): How did you decide between depot charging versus terminal charging, how many chargers do you have, and how many buses are typically charging at once?

Zachary Agush (RIPTA): Depot charging was ruled out because the electric buses were not holding a charge for their full routes, especially in the winter, so RIPTA worked with a consultant to determine the ideal number and locations of on-route chargers.

Melissa Dullea (MBTA): How long does it take to charge vehicles using the on-route chargers?

Zachary Agush (RIPTA): Generally charging takes 7-9 minutes, assuming the battery is nearly dead. RIPTA is purchasing vehicles with somewhat smaller batteries because it has a large enough fleet that each bus can charge every time it returns to the terminal or at least every other trip.

Marc Older: Do you have information on how much cold and hot weather penalties are due to controlling temperature on the bus and how much is due to reduced battery efficiency?

Zachary Agush (RIPTA): Data from the monitoring software show that on days when the temperature is below 40 degrees Fahrenheit the state of charge goes down faster, which impacts the number of miles the bus can travel. Every time the bus door opens or closes, more energy is needed to re-heat the bus as well. Battery efficiency is likely not the issue, though battery technology is rapidly developing and improving.

Tim Hazelton (MBTA): How do you manage and convey planned recharging activities?

Zachary Agush (RIPTA): Most depot recharging is being done by utility staff, though driver training will be necessary as on-route chargers are implemented.

Conclusion and Upcoming Events

S. Johnston thanked everyone for their participation and mentioned upcoming Transit Working Group events, including a coffee chat on Human Services Transportation on March 10, 2022, and a coffee chat on Confronting the Driver Recruitment Shortfall with the Transit Workforce Center on April 6, 2022.

 

Attendance

Attendee

Affiliation

Joseph Mech

Brockton Area Transit (BAT)

Sarah Lee

Massport

Caitlin Allen-Connelly

A Better City

James Nee

MASCO

Melissa Dullea

Massachusetts Bay Transportation Authority (MBTA)

Megan Rhodes

Franklin Regional Council of Governments (FRCOG)

Lisa Weber

Human Services Transportation Office (HST)

Jeff Bennett

128 Business Council

Nahrin Sangkagalo

Central Massachusetts Regional Planning Commission (CMRPC)

Zachary Agush

Rhode Island Public Transit Authority (RIPTA)

Marc Older

N/A

Tim Hazelton

Massachusetts Bay Transportation Authority (MBTA)

Leslie Zebrowitz

Brandeis University

Steven Olanoff

Boston Region Metropolitan Planning Organization; Three Rivers Interlocal Council

Susan Barrett

Town of Lexington

Andrew Jennings

Town of Billerica; Lowell Regional Transit Authority (LRTA)

Peter Pelletier

Town of Medway

Edward Bates

MassDOT

Sarah Ingle

Rhode Island Public Transit Authority (RIPTA)

Jay Flynn

Transit Matters

 

MPO Staff/Central Transportation Planning Staff

Stella Jordan

Sandy Johnston


 

 

The Boston Region Metropolitan Planning Organization (MPO) operates its programs, services, and activities in compliance with federal nondiscrimination laws including Title VI of the Civil Rights Act of 1964 (Title VI), the Civil Rights Restoration Act of 1987, and related statutes and regulations. Title VI prohibits discrimination in federally assisted programs and requires that no person in the United States of America shall, on the grounds of race, color, or national origin (including limited English proficiency), be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination under any program or activity that receives federal assistance. Related federal nondiscrimination laws administered by the Federal Highway Administration, Federal Transit Administration, or both, prohibit discrimination on the basis of age, sex, and disability. The Boston Region MPO considers these protected populations in its Title VI Programs, consistent with federal interpretation and administration. In addition, the Boston Region MPO provides meaningful access to its programs, services, and activities to individuals with limited English proficiency, in compliance with U.S. Department of Transportation policy and guidance on federal Executive Order 13166.

The Boston Region MPO also complies with the Massachusetts Public Accommodation Law, M.G.L. c 272 sections 92a, 98, 98a, which prohibits making any distinction, discrimination, or restriction in admission to, or treatment in a place of public accommodation based on race, color, religious creed, national origin, sex, sexual orientation, disability, or ancestry. Likewise, the Boston Region MPO complies with the Governor's Executive Order 526, section 4, which requires that all programs, activities, and services provided, performed, licensed, chartered, funded, regulated, or contracted for by the state shall be conducted without unlawful discrimination based on race, color, age, gender, ethnicity, sexual orientation, gender identity or expression, religion, creed, ancestry, national origin, disability, veteran's status (including Vietnam-era veterans), or background.

A complaint form and additional information can be obtained by contacting the MPO or at http://www.bostonmpo.org/mpo_non_discrimination. To request this information in a different language or in an accessible format, please contact

Title VI Specialist
Boston Region MPO
10 Park Plaza, Suite 2150
Boston, MA 02116
civilrights@ctps.org

By Telephone:
857.702.3700 (voice)

For people with hearing or speaking difficulties, connect through the state MassRelay service:

·        Relay Using TTY or Hearing Carry-over: 800.439.2370

·        Relay Using Voice Carry-over: 866.887.6619

·        Relay Using Text to Speech: 866.645.9870

For more information, including numbers for Spanish speakers, visit https://www.mass.gov/massrelay.