Table 2: FFY 2018-2022 DRAFT TIP Project Evaluations, Ranked by Total Score

Order TIP ID Proponent(s) Project Name TOTAL SCORE
(out of 134)
SAFETY (30 possible points) Crash Severity Value: Equivalent Property Damage Only (EPDO) index
(up to 5 points)
Crash Severity Rate: Equivalent Property Damage Only (EPDO) index per VMT
 (up to 5 points)
Improves truck-related safety issue
(up to 5 points)
Improves bicycle safety (up to 5 points) Improves pedestrian safety (up to 5 points) Improves safety or removes an at-grade railroad crossing (up to 5 points) SYSTEM PRESERVATION (29 possible points) Improves substandard roadway bridge(s) (up to 3 points) Improves substandard pavement (up to 6 points) Improves substandard traffic signal equipment (up to 6 points) Improves transit asset(s) (up to 3 points) Improves substandard sidewalk(s) (up to 3 points) Improves emergency response (up to 2 points) Improves ability to respond to extreme conditions (up to 6 points) CAPACITY MANAGEMENT/MOBILITY (29 possible points) Reduces transit vehicle delay (up to 4 points) Improves pedestrian network and ADA accessibility (up to 5 points) Improves bicycle network (up to 4 points) Improves intermodal accommodations/connections to transit
(up to 6 points)
Improves truck movement (up to 4 points) Reduces vehicle congestion (up to 6 points) CLEAN AIR/CLEAN COMMUNITIES (16 possible points) Reduces CO2 (up to 5 points) Reduces other transportation-related emissions (VOC, Nox, CO)
(up to 5 points)
Addresses environmental impacts (up to 4 points) Is in an EOEEA-certified "Green Community"
(up to 2 points)
TRANSPORTATION EQUITY (12 possible points) Serves Title VI/non-discrimination populations
(up to 12 points)
ECONOMIC VITALITY (18 possible points) Serves targeted development site (up to 6 points) Provides for development consistent with the compact growth strategies of MetroFuture
(up to 5 points)
Provides multimodal access to an activity center (up to 4 points) Leverages other investments (non-TIP funding)
(up to 3 points)
1 607777 Watertown Rehabilitation of Mount Auburn St. (Route 16) 68 18 5 2 3 3 5 0 10 0 4 4 0 2 0 0 16 4 0 2 4 0 6 12 4 4 2 2 3 3 9 4 2 3 0
1 607981 Somerville McGrath Boulevard project 68 13 3 2 0 4 4 0 14 0 6 6 0 2 0 0 11 0 0 1 6 0 4 8 3 3 0 2 10 10 12 4 5 3 0
2 608449 Boston Commonwealth Avenue, phases 3 and 4 67 17 3 2 0 5 4 3 12 0 4 4 0 2 2 0 11 0 0 4 6 1 0 8 2 3 1 2 8 8 11 4 4 3 0
3 608078 Chelsea Reconstruction of Broadway, from City Hall Ave to the Revere City Line 61 17 5 5 0 3 4 0 10 0 4 4 0 2 0 0 5 0 0 1 4 0 0 8 2 3 1 2 12 12 9 4 2 3 0
4 608348 Beverly Rehabilitation of Bridge St. 59 12 3 2 2 3 2 0 13 0 6 4 0 3 0 0 13 1 0 2 4 0 6 9 3 3 1 2 4 4 8 4 1 3 0
5 605313 Natick (MassDOT) Bridge replacement, Route 27 (North Main St.) over Route 9 (Worcester St.) 53 18 5 3 3 3 4 0 16 3 6 6 0 0 0 1 10 0 4 1 4 1 0 2 -1 -1 2 2 1 1 6 0 3 3 0
6 602310 Danvers Reconstruction on Collins St. 50 9 2 2 1 2 2 0 12 0 6 6 0 0 0 0 12 0 4 1 2 1 4 8 2 2 2 2 2 2 7 3 2 2 0
7 606130 Norwood Intersection improvements at Route 1A and Upland Rd./Washington St. and Prospect St./Fulton St. 47 13 1 2 4 2 4 0 7 0 6 0 0 0 1 0 14 1 4 1 4 2 2 3 1 1 1 0 3 3 7 3 1 3 0
7 608275 Malden Lighting and Sidewalk Improvements on Exchange Street 47 8 1 1 0 1 5 0 8 0 4 0 0 3 1 0 6 0 4 1 1 0 0 5 1 1 1 2 10 10 10 2 3 2 3
8 608229 Acton Intersection Improvements at Massachusetts Avenue (Route 111) and Main Street (Route 27) (Kelly's Corner) 45 15 3 4 2 3 3 0 8 0 0 4 0 3 1 0 10 0 4 1 0 1 4 8 2 1 3 2 0 0 4 0 2 2 0
9 601607 Hull
Reconstruction of Atlantic Ave. and related work 44 11 1 1 1 4 4 0 13 0 6 0 0 3 2 2 8 0 4 1 2 1 0 6 1 1 4 0 2 2 4 0 2 2 0
10 601704 Newton Reconstruction and signal improvements on Walnut St. 42 10 3 2 1 2 2 0 12 0 6 4 0 2 0 0 7 0 0 1 6 0 0 4 -1 1 2 2 0 0 9 4 2 3 0
10 601513 Saugus (MassDOT) Interchange reconstruction at Walnut St. and Route 1 (phase II) 42 9 3 1 0 2 3 0 13 0 6 6 0 0 1 0 9 1 4 1 0 1 2 6 1 1 2 2 1 1 4 0 1 3 0
11 604231 Marlborough Intersection and signal improvements on Route 20 (East Main St./Boston Post Rd.) at Concord Rd. 39 6 2 2 0 0 2 0 12 0 4 6 0 2 0 0 6 1 0 0 0 1 4 7 2 2 1 2 3 3 5 3 1 1 0
12 607738 Bedford Minuteman Bikeway Extension, from Loomis Street to the Concord T.L. 38 7 1 0 0 3 3 0 9 0 6 0 0 3 0 0 9 0 5 4 0 0 0 8 1 2 3 2 1 1 4 0 2 2 0
12 605743 Ipswich Resurfacing and related work on Central and South Main Sts. 38 10 2 2 2 2 2 0 9 0 4 0 0 2 1 2 5 0 0 1 4 0 0 4 1 1 2 0 2 2 8 3 3 2 0
12 608164 Sudbury Bruce Freeman Rail Trail, Phase 2D 38 7 1 0 0 3 3 0 3 0 0 0 0 3 0 0 13 0 5 4 4 0 0 10 3 4 1 2 1 1 4 0 2 2 0
13 607249 Sudbury (MassDOT) Intersection improvements at Route 20 and Landham Rd. 37 16 2 5 3 3 3 0 7 0 4 0 0 3 0 0 4 0 0 1 0 1 2 5 1 1 1 2 0 0 5 3 0 2 0
14 608146 Marblehead Intersection improvements to Pleasant St. at Village/Vine/Cross Sts. 36 8 1 1 0 3 3 0 10 0 6 0 0 3 0 1 5 0 0 1 4 0 0 3 1 1 1 0 1 1 9 4 2 3 0
14 608007 Cohasset Corridor Improvements and Related Work on Justice Cushing Highway (Route 3A), from Beechwood Street to the Scituate Town Line 36 15 4 2 3 3 3 0 7 0 0 4 0 3 0 0 6 0 4 1 0 1 0 5 1 1 1 2 0 0 3 0 1 2 0
15 603739 Wrentham Construction of I-495/Route 1A ramps 35 9 2 2 5 0 0 0 8 0 4 4 0 0 0 0 8 0 0 0 0 2 6 10 5 5 0 0 0 0 0 0 0 0 0
16 607305 Reading (MassDOT) Intersection Signalization at Route 28 & Hopkins Street 34 6 1 1 0 0 4 0 12 0 4 4 0 2 1 1 5 0 2 0 0 1 2 2 1 1 0 0 2 2 7 2 3 2 0
16 604638 Peabody (MassDOT) Mainline improvements on Route 128 (phase II) 34 10 5 1 4 0 0 0 10 3 6 0 0 0 1 0 5 1 0 0 0 2 2 3 1 1 1 0 3 3 3 1 1 1 0
17 606002 Duxbury Signal installation at Route 3 (NB and SB) ramps and Route 3A (Tremont St.) 33 6 2 1 1 0 2 0 11 0 4 6 0 0 1 0 10 0 4 0 0 2 4 4 2 2 0 0 0 0 2 0 1 1 0
18 604735 Medfield Reconstruction of North St. 29 7 1 1 0 3 2 0 8 0 4 0 0 3 1 0 2 0 0 1 0 1 0 4 1 1 2 0 1 1 7 3 2 2 0
18 604745 Wrentham Reconstruction of Taunton St. (Route 152) 29 8 1 1 1 2 3 0 7 0 6 0 0 0 1 0 5 0 4 1 0 0 0 4 1 1 2 0 1 1 4 0 2 2 0
19 608006 Framingham (MassDOT) Pedestrian Hybrid Beacon Installation at Route 9 and Maynard Road 26 11 2 3 0 0 5 1 6 0 0 4 0 0 1 1 2 0 2 0 0 0 0 2 0 0 0 2 1 1 4 0 2 2 0
20 607899 Dedham Pedestrian improvements along Bussey St. 25 7 2 2 0 1 2 0 3 0 0 0 0 3 0 0 1 0 0 0 0 1 0 4 1 1 0 2 7 7 3 0 2 1 0

BLUE font = newly evaluated project
RED font = change in score from last year
BOLD font = project is in the Long-Range Transportation Plan